Home / Browse projects / Palghar, Maharashtra / Oasis Elysian Wing C
Oasis Elysian Wing C
By Oasis Realty
RG-MH-17660 · RERA P99000055875 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 20.00 crore secured on the land, in favour of Aditya Birla Capital Limited, Model co Operative Bank Ltd
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Oasis Elysian Wing C is a Residential / Group Housing project by Oasis Realty in Palghar, Maharashtra, registered with MahaRERA as P99000055875 on 29 Apr 2024. Possession is promised by 1 Dec 2028. 61 of the 155 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.
At a glance
Project
- NameOasis Elysian Wing C
- TypeResidential / Group Housing
- Location
- Near Dr. D'souza Hospital
- Ramedy
- Vasai
- Palghar
- 401201
- Pincode401201
- RERA no.P99000055875
- ReraGenie IDRG-MH-17660
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2024
- Promised completion1 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed119 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Residential Building 1, Wing C | NA | 21 | 20 | 155 | 0 | 155 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 28%.
Residential Building 1, Wing C: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 28% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed175
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Patrick Elias Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Olympio P Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Josephine P Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Aldrich A Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Neelima A Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Snovia C Andrades | Vasai-Virar City (M Corp) | Palghar |
| Valerina A Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Auldrin A Gonsalves | Vasai-Virar City (M Corp) | Palghar |
| Allan P Gonsalves | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Residential Building 1, Wing C | NA | Rs 32.15 cr | Rs 8.46 cr |
| - | NA | Rs 3.50 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ENCON Sanjay S Narang |
| Engineer | Sanjay Narang S Narang |
| Chartered Accountant | Philip Colaco & Co Philip Colaco |
| Chartered Accountant | Rajendra Jagtap & Company |
| Partner | Role in project |
|---|---|
| Oasis Realty | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2028
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 ARCHITECT CERTIFICATE.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form-2 ENGINEER CERTIFICATE.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3-CHARTERED ACCOUNTANT CERTIFICATE.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (1).pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Form-1 ARCHITECT CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form-2 ENGINEER CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form-2 ENGINEER CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3-CHARTERED ACCOUNTANT CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3-CHARTERED ACCOUNTANT CERTIFICATE.pdf | 16 Oct 2025 |
| Declaration and undertaking (Annexure A)File: Variation-Land Cost.pdf | 12 Aug 2025 |
| Layout approvalFile: Plot Area Diag-upto 20th floor.pdf | 27 Jul 2025 |
| Building plan approvalFile: Building Plan C wing.pdf | 27 Jul 2025 |
| Building plan approvalFile: Stilt-Mezz Floor Plan-upto 20th floor.pdf | 27 Jul 2025 |
| Building plan approvalFile: Typical Floor Plan - upto 20th floor.pdf | 27 Jul 2025 |
| Commencement certificateFile: CC-OASIS REALTY WING C -20th Floor.pdf | 27 Jul 2025 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 3File: Revied Form 3-CA Certificate-Oasis Realty compressed.pdf | 26 Jul 2025 |
| Withdrawal Update Form 3File: Form-3 Chartered Accountant Certificate.pdf | 26 Jul 2025 |
| Withdrawal Update Form 3File: Form-3 Chartered Accountant Certificate.pdf | 26 Jul 2025 |
| Layout approvalFile: Plot Area Diag-upto 20th floor.pdf | 22 Jul 2025 |
| Building plan approvalFile: Building Plan C wing.pdf | 22 Jul 2025 |
| Building plan approvalFile: Stilt-Mezz Floor Plan-upto 20th floor.pdf | 22 Jul 2025 |
| Building plan approvalFile: Typical Floor Plan - upto 20th floor.pdf | 22 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form-2A Engineers Certificate dt 04012025.pdf | 18 Jun 2025 |
| Form 2A (FY 2025-2026)File: Form-2A Engineers Certificate dt 04012025.pdf | 18 Jun 2025 |
| Form 5 (FY 2024-2025)File: Form 5-Chartered Accountant Certificate.pdf | 18 Jun 2025 |
| Form 1File: Form 1-Architect Certificate.pdf | 17 Jun 2025 |
| Form 2File: Form 2-Engineer Certificate.pdf | 17 Jun 2025 |
| Form 3File: Form-3 Chartered Accountant Certificate dt 1072024 for april 24 to june 24.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: report of quarter 1 submission.pdf | 17 Jun 2025 |
| OthersFile: Form 2A-Engineers Certificate.pdf | 17 Jun 2025 |
| Form 1File: Form 1-Architect Certificate 172024 to 3009 2024.pdf | 17 Jun 2025 |
| Form 2File: Form 2-Engineer Certificate 01072024 to 30092024.pdf | 17 Jun 2025 |
| Form 3File: Form-3 Chartered Accountant Certificate 01072024 to 30092024.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: report of quarter 2 submission.pdf | 17 Jun 2025 |
| Form 1File: Form 1-Architect Certificate Oct 2024 to Dec 2024.pdf | 17 Jun 2025 |
| Form 2File: Form 2-Engineer Certificate Oct 2024 to Dec 2024.pdf | 17 Jun 2025 |
| Form 3File: Form-3 Chartered Accountant Certificate Oct 2024 to Dec 2024.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory Oct 2024 to Dec 2024.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: report of quarter 3 submission.pdf | 17 Jun 2025 |
| Form 1File: Form 1-Architect Certificate Oct 2024 to Dec 2024.pdf | 17 Jun 2025 |
| Form 2File: Form 2-Engineer Certificate Jan 2025 to March 2025.pdf | 17 Jun 2025 |
| Form 3File: Form-3 Chartered Accountant Certificate Jan 2025 to March 2025.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure on Sold-Booked Inventory.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: report of quarter 1 submission of 2025.pdf | 17 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Chartered Accountant certificate_05-compressed.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certficate-Qaurter 1 of 2024.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate 02.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate-Qau 3 of 2024.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate-Qau 4 of 2024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Jan 24 to Mar 24-Qaurter 1 of 2024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Apr 24 to June 24-Qaurter 2 of 2024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-July 24 to Sept 24-Qaurter 3 of 2024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Oct 24 to Dec 24-Qaurter 4 of 2024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jan 25 to Mar 25-Qaurter 1 of 2025.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certifcate-Qau 1 of 2024.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate 02.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer certificate-Qau 3 of 2024.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate-Qau 4 of 2024.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Architect Certificate.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure on Sold-Booked Inventory.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Quality Assurance Certificate.pdf | 7 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Letter of Mortgage Deed in Bank-PDF.pdf | 18 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-OASIS REALTY WING C self attested.pdf | 18 Mar 2025 |
| Other - LegalFile: Index 2-Model Co-op Bank.PDF | 18 Mar 2025 |
| Other - LegalFile: Mortgage Deed-Model Co-op Bank_11zon (1)_11zon.pdf | 18 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Letter of Mortgage Deed in Bank-PDF.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate 5 8 2024.pdf | 12 Mar 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Oasis Elysian Wing A and BP99000023418 | Dsouza Hospital, Palghar | Dec 2019 | Completed | Jun 2024Registered original: Jul 2023 | Jul 2023 |
| Oasis GraciaP99000022370 | Vasai, Palghar | Sep 2019 | Completed | Dec 2023Registered original: Dec 2022 | Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Oasis Elysian Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ramedy3,200+ in Palghar
ARIANA
Mansarovar Estate Builders LLP
Sunteck Beach Residences 2
SUNTECK REAL ESTATES PRIVATE LIMITED
SHRIPAL SATTVA BLDG. 2
SHRIPAL SATTVA LLP
Sunteck Beach Residences 1
SUNTECK REAL ESTATES PRIVATE LIMITED
Sunteck Beach Residences 4
SUNTECK REAL ESTATES PRIVATE LIMITED
Milagrace Aura
Milagrace Developers
See every Palghar project, with the district possession charts
Builder: Oasis Realty
Oasis Realty has 2 registrations on MahaRERA, including Three Sixty West and Oasis Elysian Wing C. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Oasis Elysian Wing C is delayed beyond 1 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Oasis Elysian Wing C?
The registered promoter entity is Oasis Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Oasis Elysian Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Oasis Elysian Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Oasis Elysian Wing C?
The professionals named in the filing: Architect: ENCON Sanjay S Narang; Engineer: Sanjay Narang S Narang; Chartered Accountant: Philip Colaco & Co Philip Colaco; Chartered Accountant: Rajendra Jagtap & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Oasis Elysian Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback