ReraGenieLog inGet a buyer report

Home / Browse projects / Daman, Daman & Diu / Noble United Industrial Park

Registration lapsed No litigation declared Commercial project

Noble United Industrial Park

By Artmatrix Properties Private Limited

RG-MH-00450 · RERA P49500000045 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
1 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Noble United Industrial Park is a Commercial project by Artmatrix Properties Private Limited in Daman, Daman & Diu, registered with MahaRERA as P49500000045 on 5 Apr 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 5 of the 6 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameNoble United Industrial Park
  • TypeCommercial
  • Location
    • Survey No. 152/1 and 152/3-B
    • Stone Quarry Area
    • Near Coasal Highway
    • Dunetha
    • Nani Daman
    • Others
    • Daman
    • 396210
  • Pincode396210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49500000045
  • ReraGenie IDRG-MH-00450

Builder

  • NameArtmatrix Properties Private Limited
  • Entity typeCompany
  • DirectorsMoiz Saifuddin Rajkotwala, Mustafa Taiyebi Rasiwala, Shabbir Saifuddin rajkotwala

Key dates

10 months past promisethis monthRegisteredApr 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Apr 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed107 files

Current status

83%5 of 6 units booked

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA31055
Building BNA30011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

Building A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Open Space150
BuildingOpen SpaceTotal
Building A7575
Building B7575

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20,366 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Apr 2026

Approvals and building plan

Sanctioning authorityPlanning and Development Authority, Nani Daman
Permissible FSI29105.98
Proposed, not sanctioned29,106 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSheth Mahagujarat Hospital, Tin Batti, Daman

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHarish & Associates
ArchitectKALPESH S BHANUSHALI
EngineerHarish & Associates
EngineerKalpesh S Bhanushali
Chartered AccountantA K Kanasagara & Co
Chartered AccountantMahendra K Bhalodiya
Chartered AccountantA. K. KANASAGARA &CO.
PartnerRole in project
Artmatrix Properties Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: 2024-25.pdf22 Apr 2026
Form 5 (FY 2024-2025)File: 2024-25.pdf22 Apr 2026
Form 1File: Form 1.pdf10 Feb 2026
Form 2File: Form 2.pdf10 Feb 2026
Form 3File: Form 3.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: Form 3.pdf10 Feb 2026
Form 1File: Form 1.pdf20 Oct 2025
Form 2File: Form 2.pdf20 Oct 2025
Form 3File: Form 3.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Oct 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Artmatrix.PDF7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf21 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf22 Feb 2024
PAN CardFile: PAN Card.pdf8 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Proforma of Agreement for Sale.pdf5 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf25 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf25 Nov 2022
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: Annual Report 20-21.pdf25 Nov 2022
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: Annual Report 19-20.pdf25 Nov 2022
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: Annual Report 18-19.pdf25 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18) (UT)File: Annual Report 17-18.pdf25 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19) (UT)File: Annual Report 18-19.pdf25 Nov 2022

How this compares with Daman

83%of this project is bookeddistrict median 32%
18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is among them

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Noble United Industrial Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dunetha, Nani Daman59 in Daman

2 kmNoble United Industrial Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: Artmatrix Properties Private Limited

Artmatrix Properties Private Limited has 1 registration on MahaRERA, including Noble United Industrial Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What does it mean that Noble United Industrial Park shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Noble United Industrial Park is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Noble United Industrial Park?

The registered promoter entity is Artmatrix Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Noble United Industrial Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Noble United Industrial Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Noble United Industrial Park?

The professionals named in the filing: Architect: Harish & Associates; Architect: KALPESH S BHANUSHALI; Engineer: Harish & Associates; Engineer: Kalpesh S Bhanushali; Chartered Accountant: A K Kanasagara & Co; Chartered Accountant: Mahendra K Bhalodiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Noble United Industrial Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Noble United Industrial Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Noble United Industrial Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.