Registered No litigation declared Residential / Group Housing project

Niwas

By Ashiana Housing Limited

RG-MH-85701 · RERA P52100054148 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 93%
137 of 360Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Niwas is a Residential / Group Housing project by Ashiana Housing Limited in Pune, Maharashtra, registered with MahaRERA as P52100054148 on 29 Dec 2023. Possession is promised by 28 Jan 2029. 223 of the 360 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameNiwas
  • TypeResidential / Group Housing
  • Location
    • Marunji Road
    • Pune
    • Marunji
    • Mulshi
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054148
  • ReraGenie IDRG-MH-85701

Builder

  • NameAshiana Housing Limited
  • Entity typeCompany
  • CINL70109WB1986PLC040864
  • GSTIN27AADCA9093P1ZX
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorVishal Gupta
  • DirectorsAnkur Gupta, Varun Gupta, Abhishek Dalmia, Sonal Mattoo, Piyul Mukherjee, Narayan NA Anand
  • Other registrations7 more →
  • Declared earlier projects32 →

Key dates

this monthRegisteredDec 2023PromisedJan 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion28 Jan 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

62%223 of 360 units booked
89.0%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T-10NA16143600360

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 93%.

T-10: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises79%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed910

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots910
Closed/Covered196
Open Space714

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,573 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Declared on4 Oct 2024
LandownerVillageDistrict
Madan Shantilal JainPune (M Corp.)Pune
Purushottam Mukunddas LohiaPune (M Corp.)Pune
Vijaykumar Santoshchand JainPune (M Corp.)Pune
M/S Hindumal Balmukund Investment Co.Pune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI19059.99
Proposed, not sanctioned19,060 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA1 Shree Plaza Dist Shopping Centre Tonk Road Jaipur 302015
Estimated costRs 34.26 cr
Cost incurredRs 30.47 cr
Work done88.95%
BuildingWingEstimatedIncurred
T-10NARs 32.44 crRs 29.98 cr
-NARs 1.81 crRs 48.96 lakh

Certifying professionals and partners14

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjeev Mehta
ArchitectMangesh Gotal
EngineerSampada Shidid
EngineerSagar Kale
EngineerMS JW consultant LLP
EngineerRamshankar Sharma
EngineerDheeraj Agrawal
EngineerYogesh Kapoor
EngineerAmit Kendala
EngineerJ V Pasare
Chartered AccountantParth V Jain & Associates
Chartered AccountantKaran Raskar and Associates
PartnerRole in project
Ashiana Housing Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Jan 2029

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2a Niwas 24-25.pdf29 Jun 2026
Form 5 (FY 2024-2025)File: Niwas Annual Certificate.pdf27 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A - Niwas - 2023 - 24 - SIG.pdf19 May 2026
Withdrawal Update Form 1File: FORM 1 - NIWAS - Dec 25.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 Niwas.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 - Niwas - Dec 25.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Niwas.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 - Niwas - Dec 25.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 Niwas_compressed.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 - Niwas - Sep 25.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Niwas - Jun 25.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3 - Niwas - Jun 25_compressed.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM 1 - Niwas - Jun 25.pdf27 Apr 2026
Withdrawal Update Form 2File: FORM 2 - Niwas - Jun 25.pdf27 Apr 2026
Withdrawal Update Form 3File: FORM 3 - Niwas - Jun 25_compressed.pdf27 Apr 2026
Proforma of Agreement for saleFile: Niwas ATS.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NIWAS 31122024 - signed.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Niwas - 31122024 - signed - compressed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Niwas 31122024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NIWAS 30092024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Niwas 30092024_compressed (1).pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - NIWAS 30092024.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Niwas - 24.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Malhar Niwas Annual Rera FY-2023-24.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Niwas - signed.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Niwas - signed.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Niwas_compressed.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Niwas.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Niwas.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed (1).pdf19 Jan 2024
Other - LegalFile: POA Atma Sharan Declaration.pdf15 Dec 2023
Other - LegalFile: Document Upload Declaration - 1.pdf13 Dec 2023
Other - LegalFile: Declaration Legal Title Report.pdf8 Dec 2023
Other - LegalFile: POA Declaration.pdf16 Nov 2023
Declaration about Commencement CertificateFile: Format D Declaration Niwas.pdf30 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Niwas AFS deviation.pdf30 Oct 2023
Other - TechnicalFile: Plinth Checking Declaration.pdf30 Oct 2023
Proforma of Allotment letterFile: Niwas Allotment Letter.pdf7 Oct 2023
Proforma of Agreement for saleFile: Niwas AFS signed.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwas DSC.pdf23 Aug 2023
Layout approvalFile: 220503 Ashiana Malhar Phasing Plan F-Model_compressed.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: 220503 Ashiana Malhar Phasing Plan F-Model_compressed.pdf3 Aug 2023
Layout approvalFile: 1315 Niwas T-10 Plan and Area Calculations_compressed.pdf2 Aug 2023
Layout approvalFile: 1415 Niwas T-10 Plan and Area Calculations_compressed.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: 1315 Niwas T-10 Plan and Area Calculations_compressed.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: 1415 Niwas T-10 Plan and Area Calculations_compressed.pdf2 Aug 2023
CERSAI detailsFile: CERSAI Debt Based Report.pdf2 Aug 2023
Copy of the legal title reportFile: Title Report Niwas 1-14_compressed.pdf31 Jul 2023
Copy of the legal title reportFile: Title Report Niwas - 15-29_compressed.pdf31 Jul 2023
Copy of the legal title reportFile: Title Report Niwas 30-43_compressed.pdf31 Jul 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Niwas.pdf25 Jul 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Niwas.pdf25 Jul 2023
CERSAI detailsFile: CERSAI REPORT RERA.pdf25 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Niwas Bank Declaration.pdf18 Jul 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf17 Jul 2023
Declaration in FORM BFile: Declaration Form - B Niwas.pdf3 Jul 2023
Building plan approvalFile: NA Order Malhar.pdf1 Jul 2023
PAN CardFile: Ashiana Pan Card.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order Malhar.pdf1 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Malhar Commencement Certificate.pdf1 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Niwas.pdf1 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Niwas.pdf1 Jul 2023
Disclosure of sold/ booked inventoryFile: Inventory SoldUnsold Niwas.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest of Directors_compressed.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Hindumal Jain investment.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Madan Shanti Lal Jain.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Purshottam Lohia.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VijayKumar Jain disclosure.pdf1 Jul 2023

Promoter's earlier projects33

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

31 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Anmol Phase III and Plaza Phase IIrevenue estate of Village-Dhulena Sector 33 Tehsil-Sohna Distt Gurgaon Haryana300OngoingDec 2028Dec 2028
Ashiana MalharMarunji Taluka Mulshi District Pune Maharashtra220OngoingOct 2026Oct 2026
Ashiana Tarang Phase IVBRevenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt Alwar Rajasthan48OngoingJun 2026Jun 2026
Ashiana Shubham Phase IVBSengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Tamil Nadu140OngoingDec 2025Dec 2025
Ashiana Tarang Phase IVARevenue Village of Milakpur Gurjar Tehsil Tijara Bhiwadi Distt. Alwar Rajasthan26OngoingNov 2025Nov 2024
Ashiana Amantran Phase IIIvillage Keshopura Tehsil Sanganer Jaipur224OngoingAug 2025Aug 2025
Ashiana Amantran Phase-IIJaipur56OngoingJun 2025Jun 2025
AshianaAmantran Phase-IJaipur224OngoingDec 2024Dec 2024
Ashiana Nirmay Phase IVBhiwadi151OngoingDec 2024Dec 2024
Ashiana Dwarka Phase IVJodhpur96OngoingOct 2024Oct 2024
Ashiana Daksh Phase-IIJaipur192OngoingOct 2024Oct 2024
Ashiana Tarang-IIIBhiwadi96CompletedJul 2024Jul 2024
Ashiana Daksh, Phase-IJaipur341CompletedJul 2024Jul 2024
Ashiana Daksh Phase IIIVillage Srikishanpura Tehsil Sanganer Distt Jaipur Rajasthan96CompletedJul 2024Jul 2024
Ashiana Shubham Phase IVASengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu220CompletedMar 2024Mar 2024
Ashiana Aditya Phase-IIJamshedpur200CompletedJan 2024Jan 2024
Ashiana Aditya Phase-IJamshedpur250CompletedJun 2023Jun 2021
Ashiana Dwarka Phase IIIJodhpur96CompletedMay 2023May 2023
Ashiana Dwarka Phase IIJodhpur96CompletedMay 2023May 2023
Ashiana SeharJamshedpur239CompletedJan 2023Jan 2023
AshianaNirmay Phase IIIBhiwadi192CompletedDec 2022Dec 2022
Ashiana Shubham Phase IIISengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram Chennai Tamil Nadu172CompletedOct 2022Oct 2022
Ashiana Tarang-IIBhiwadi48CompletedMay 2022May 2022
Ashiana Umang Phase IVJaipur192CompletedOct 2021Oct 2021
Ashiana Umang Ph-V and Umang PlazaJaipur304OngoingOct 2021Late, Oct 2024
AshianaNirmay Phase IIBhiwadi96CompletedMay 2021May 2021
Ashiana Shubham Phase IISengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu144CompletedMar 2021Mar 2021
Ashiana SeharJamshedpur239CompletedJan 2021Jan 2021
Anmol Phase Irevenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana300CompletedOct 2020Oct 2020
Anmol Phase IIrevenue estate of Village-Dhunela Sector 33 Tehsil- Sohna Distt Gurugram Haryana280CompletedApr 2020Apr 2020
Ashiana Dwarka EWS/LIGJodhpur102CompletedMay 2019May 2019
AshianaTarang Phase IABhiwadi104CompletedApr 2019Late, Apr 2021
Ashiana Shubham Phase ISengundram Village Govindapuram Hamlet Maraimalai Nagar Municipal Limit Chengalpet Taluk Kancheepuram District Tamil Nadu144CompletedJun 2017Jun 2017

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Niwas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmNiwasCompleted 7Lapsed / revoked 7Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Ashiana Housing Limited

Ashiana Housing Limited has 8 registrations on MahaRERA, including Ashiana Malhar Phase I and Commercial Block and Ashiana Amodh Phase I. Its filings disclose 32 earlier MahaRERA projects: declares 30 of 32 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Niwas is delayed beyond 28 Jan 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Niwas?

The registered promoter entity is Ashiana Housing Limited, a company as per the filing. Its CIN L70109WB1986PLC040864 and GSTIN 27AADCA9093P1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Niwas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Niwas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Niwas?

The professionals named in the filing: Architect: Sanjeev Mehta; Architect: Mangesh Gotal; Engineer: Sampada Shidid; Engineer: Sagar Kale; Engineer: MS JW consultant LLP; Engineer: Ramshankar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Niwas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Niwas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Niwas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.