ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Nivaas Business Square

Registered No litigation declared Commercial project

Nivaas Business Square

By M/s Nivaas Infrastructure

RG-MH-56429 · RERA P52100053147 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
11 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Nivaas Business Square is a Commercial project by M/s Nivaas Infrastructure in Pune, Maharashtra, registered with MahaRERA as P52100053147 on 17 Oct 2023. Possession is promised by 31 Oct 2028. 14 of the 25 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNivaas Business Square
  • TypeCommercial
  • Location
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053147
  • ReraGenie IDRG-MH-56429

Builder

  • NameM/s Nivaas Infrastructure
  • Entity typePartnership
  • PartnerRamesh Ramchandra Lala

Key dates

this monthRegisteredOct 2023PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2023
  • Promised completion31 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

56%14 of 25 units booked
66.0%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nivaas Business SquareNA4402525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Nivaas Business Square: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Aug 2025
LandownerVillageDistrict
Mr Mohan Jagdish Gupta-Pune
Mrs sharda S GuptaPune (M Corp.)Pune
Mr Shivnarayan R GuptaPune (M Corp.)Pune
Mr Nikhil Ramesh LalaMumbai CityMumbai City
Mr Ramesh Ramchandra LalaMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI3904.76
Proposed, not sanctioned3,905 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWakad Hinjewadi, Pune
Estimated costRs 30.00 cr
Cost incurredRs 19.80 cr
Work done66.02%
BuildingWingEstimatedIncurred
Nivaas Business SquareNARs 25.00 crRs 19.80 cr
-NARs 5.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architect Associates
EngineerRutuja Jagdale
Chartered AccountantCA Pravin Pise and Associates
PartnerRole in project
M/s Nivaas Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Nivaas.pdf17 Jul 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (38) (2).pdf17 Jul 2026
Withdrawal Update Form 3File: F 3 - NIVAAS INFRA (1).pdf17 Jul 2026
Layout approvalFile: 10 (1).pdf22 Apr 2026
Building plan approvalFile: 11-2 (1).pdf22 Apr 2026
Building plan approvalFile: 12-1 (1).pdf22 Apr 2026
Commencement certificateFile: Adobe Scan 05 Aug 2025 (1) (1).pdf22 Apr 2026
Withdrawal Update Form 1File: fORM 1 (1).pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 NBS.pdf22 Apr 2026
Withdrawal Update Form 3File: F3-NBS (1) (1).pdf22 Apr 2026
Withdrawal Update Form 1File: fORM 1.pdf22 Jan 2026
Withdrawal Update Form 1File: fORM 1.pdf22 Jan 2026
Withdrawal Update Form 1File: fORM 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2- Nivaas Dec 25.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2- Nivaas Dec 25.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2- Nivaas Dec 25.pdf22 Jan 2026
Withdrawal Update Form 3File: F3-NBS(Q3).pdf22 Jan 2026
Withdrawal Update Form 3File: F3-NBS(Q3).pdf22 Jan 2026
Withdrawal Update Form 3File: F3-NBS(Q3).pdf22 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (6).pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (NBS)_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Nivaas.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOld unsold- Nivaas 1.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc_1573 (1)_compressed.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_merged (1).pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Nivaas.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold- Nivaas infra.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc_1573 (1)_compressed.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-NBS (1)_compressed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Nivaas.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: SOld Unsold-Nivaas.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA DOCUMENTS (1) (1).pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Nivaas.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold-nivaas.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (NIVAAS INFRA).pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIVASS(1) (1).pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Nivaas In.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold- Nivaas.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (2)_compressed (1).pdf10 Apr 2024
Proforma of Agreement for saleFile: 01-Booking-Agree-Rev-120124.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIVASS(1).pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Nivaas Infra.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold- Nivaas.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf11 Jan 2024
Details of encumbrances concerned to FinanceFile: Self Declaration (1).pdf28 Sep 2023
Details of encumbrances concerned to LegalFile: Self Declaration (1).pdf28 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow8 Sep 2023
Layout approvalFile: 2608_compressed.pdf19 Aug 2023
Building plan approvalFile: 2 (1)_compressed.pdf19 Aug 2023
Building plan approvalFile: 3_compressed.pdf19 Aug 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (12)_page-0001.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: 2608_compressed.pdf19 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 (1)_compressed.pdf19 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf19 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 1_compressed (1).pdf19 Aug 2023
Declaration about Commencement CertificateFile: Format D - Nivaas.pdf19 Aug 2023
Declaration in FORM BFile: Form B- Promoter.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NIVAAS INFRASTRUCTURE .pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 4 Oct 2023 (2)_compressed.pdf19 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - 01.pdf19 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure - 02.pdf19 Aug 2023
Proforma of Allotment letterFile: Model Form_compressed.pdf19 Aug 2023
Proforma of Agreement for saleFile: AFS- Nivaas.pdf19 Aug 2023
PAN CardFile: Pan card.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: Self Declaration.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: Self Declaration.pdf18 Aug 2023
CERSAI detailsFile: Declaration.pdf18 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Report 1.pdf18 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf18 Aug 2023

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nivaas Business Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

2 kmNivaas Business SquareCompleted 17Lapsed / revoked 3Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: M/s Nivaas Infrastructure

M/s Nivaas Infrastructure has 1 registration on MahaRERA, including Nivaas Business Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nivaas Business Square is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nivaas Business Square?

The registered promoter entity is M/s Nivaas Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nivaas Business Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nivaas Business Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nivaas Business Square?

The professionals named in the filing: Architect: Cubix Architect Associates; Engineer: Rutuja Jagdale; Chartered Accountant: CA Pravin Pise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nivaas Business Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nivaas Business Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nivaas Business Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.