NITYANAND
RG-MH-60467 · RERA P51900017760 · Last updated on MahaRERA portal: 1 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NITYANAND is a Others project by ASHOK MURARI PATIL in GIRGAUM, 400004, registered with MahaRERA as P51900017760 on 11 Sep 2018. Possession was promised by 30 Mar 2026 and is now 7 months past that date.
At a glance
Project
- NameNITYANAND
- TypeOthers
- Location
- V P ROAD
- GIRGAUM
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900017760
- ReraGenie IDRG-MH-60467
Builder
- NameASHOK MURARI PATIL
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Sep 2018
- Promised completion30 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed113 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NITYANAND / Patil Heights | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
NITYANAND / Patil Heights: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 1 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DAKSHA ASHOK PATIL | - | Mumbai City |
| ASHOK MURARI PATIL | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Girish A. Nerurkar |
| Engineer | V.J. Joshi |
| Engineer | Milind Patil |
| Engineer | Vikas V Gokhale |
| Chartered Accountant | S N Kamat & Co |
| Chartered Accountant | SWATI SADASHIV KAMATH |
| Partner | Role in project |
|---|---|
| ASHOK MURARI PATIL | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jun 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect letter form 4.pdf | 1 Apr 2025 |
| Certificates of CA (Form 3)File: CA CERTIFICATE RERA 31012024.pdf | 1 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Final_compressed.pdf | 1 Apr 2025 |
| Form 2AFile: Quality Assurance.pdf | 1 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtiect Certificate Apr23.pdf | 19 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtiect certificate July23.pdf | 19 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtiect Certificate Oct23.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Apr23.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Apr 23.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate July23.pdf | 19 Feb 2024 |
| Form 2AFile: Quality Assurance Certificate April 2023.pdf | 19 Feb 2024 |
| Form 2AFile: Quality Assurance Certificate July 2023.pdf | 19 Feb 2024 |
| Form 2AFile: Quality Assurance Certificate Oct 2023.pdf | 19 Feb 2024 |
| Certificates of CA (Form 3)File: CA certificate Apr23.pdf | 19 Feb 2024 |
| Certificates of CA (Form 3)File: CA certificate July23.pdf | 19 Feb 2024 |
| Certificates of CA (Form 3)File: CA certificate Oct23.pdf | 19 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect JAN 2023.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGI JAN 2023.pdf | 12 May 2023 |
| Form 2AFile: 2A QUALITY JAN 2023.pdf | 12 May 2023 |
| Form 2AFile: 2A QUALITY JAN 2023.pdf | 12 May 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE JAN 2023.pdf | 12 May 2023 |
| OtherFile: ARCHTECT SUPERVIOR JAN 2023.pdf | 12 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Papers for Rera update_compressed.pdf | 15 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Papers for Rera update_compressed.pdf | 15 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Rera Papers.pdf | 13 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Rera Papers.pdf | 13 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Rera Papers.pdf | 13 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structure engineer Rera Papers_compressed.pdf | 13 Mar 2023 |
| OtherFile: form 5 oct 2022.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 18 Feb 2023 |
| OtherFile: Form 5 Oct 2022.pdf | 18 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New architect certifcate.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate.pdf | 17 Feb 2023 |
| Form 2AFile: Quality Assurance 2A.pdf | 17 Feb 2023 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 17 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf | 28 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf | 28 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf | 28 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 28 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf | 28 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2Engineers certificate.pdf | 28 Oct 2022 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 28 Oct 2022 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 28 Oct 2022 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 28 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: January certificate.pdf | 14 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: July certificate.pdf | 14 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM_2_Engineers_Certificate-January Quarter 2022.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of SOLD Flats.pdf | 8 Sep 2022 |
| OtherFile: CONSENT OF ALLOTEES FORMAT-C.pdf | 8 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf | 27 May 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of SOLD Flats.pdf | 27 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM-5 2017-18.pdf | 27 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5 2018-19.pdf | 27 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 2019-20.pdf | 27 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 2020-21.pdf | 27 May 2022 |
| OtherFile: FORM-C_Application for Correction.pdf | 27 May 2022 |
| OtherFile: CONSENT OF ALLOTEES FORMAT-C.pdf | 27 May 2022 |
| Declaration about Commencement CertificateFile: FORM-D_Declaration of CC.pdf | 25 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Architect CERTIFICATE.pdf | 25 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate form_2.pdf | 25 Nov 2021 |
| Form 2AFile: Form-2A.pdf | 25 Nov 2021 |
| Certificates of CA (Form 3)File: Form-3CA CERTIFICATE.pdf | 25 Nov 2021 |
| Layout approvalFile: Nityanand -Patil Heights BMC Approved Dwg_compressed.pdf | 2 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: Nityanand -Patil Heights BMC Approved Dwg_compressed.pdf | 2 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Nityanand CC.pdf | 30 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFCATE APRIL 2021_FINAL.pdf | 19 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE APRIL 2021_FINAL.pdf | 19 Jul 2021 |
| Form 2AFile: QUALITY ASSURANCE CERTIFICATE APRIL 2021_FINAL.pdf | 19 Jul 2021 |
| Certificates of CA (Form 3)File: CA CERTIFICATE APRIL 2021_FINAL.pdf | 19 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.pdf | 19 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf | 19 Mar 2021 |
| Form 2AFile: QUALITY.pdf | 19 Mar 2021 |
| Certificates of CA (Form 3)File: CA CER 31012021.pdf | 19 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT JULY 20.pdf | 26 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE JULY 20.pdf | 26 Nov 2020 |
| Form 2AFile: QUALITY JULY 20.pdf | 26 Nov 2020 |
| Certificates of CA (Form 3)File: C A CERTIFICATE JULY 20.pdf | 26 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf | 5 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE FINAL.pdf | 5 Feb 2020 |
| Form 2AFile: QUALITY.pdf | 5 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NITYANAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GIRGAUM
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Earth Enclave
Earth Graphics
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Builder: ASHOK MURARI PATIL
ASHOK MURARI PATIL has 1 registration on MahaRERA, including NITYANAND. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that NITYANAND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NITYANAND is delayed beyond 30 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NITYANAND?
The registered promoter entity is ASHOK MURARI PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NITYANAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NITYANAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NITYANAND?
The professionals named in the filing: Architect: Girish A. Nerurkar; Engineer: V.J. Joshi; Engineer: Milind Patil; Engineer: Vikas V Gokhale; Chartered Accountant: S N Kamat & Co; Chartered Accountant: SWATI SADASHIV KAMATH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NITYANAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback