Completed No litigation declared Residential / Group Housing project

NISHIGANDHA PARK PHASE 1

By M/S ARCHWAY ESTATES

RG-MH-21145 · RERA P52100005610 · Last updated on MahaRERA portal: 5 Jan 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
2 of 11Construction stages donefurthest along: Basement (if any), 80%
1Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

NISHIGANDHA PARK PHASE 1 is a Residential / Group Housing project by M/S ARCHWAY ESTATES in Pune, Maharashtra, registered with MahaRERA as P52100005610 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 48 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNISHIGANDHA PARK PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005610
  • ReraGenie IDRG-MH-21145

Builder

  • NameM/S ARCHWAY ESTATES
  • Entity typePartnership
  • PartnersPRASSANA PATWARDHAN, DILIP DESHPANDE
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISHIGANDHA PARKNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

NISHIGANDHA PARK: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,196 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NISHIGANDHA PARK CO-OP. HSG. SOC. LTDKothrudPune

Approvals and building plan

Permissible FSI3000.0
Proposed, not sanctioned2,458 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAYUR COLONY KOTHRUD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShinde Joshi & Associates
EngineerSTRUDCOM CONSULTANTS PVT LTD
EngineerNiranjan Jog
PartnerRole in project
M/S ARCHWAY ESTATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001484Dec 2018 → Dec 2021

Reason as filed by the promoterThe firm has applied for TDR utilization with the competent authority. However the sanction from competent authority is still awaited. We enclose herewith the copy of challan paid to Pune municipal Corporation for TDR utilization

EXT52100005031Dec 2018 → Dec 2021

Reason as filed by the promoterPromoter has received ULC Order dated 11/2019 vide.oder no. ULC/No.-3/K-20/P-224/SR/14/2019/480. Promoter has paid an amount of Rs 2,36,471 vide challan no. 0093 through State Bank of India on 07/12/2019.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000096157Mr. Haresh Parshuram VartakM/s Archway Estates Through its Partner, Mr. Dileep Deshpande, Rajendra Madkar, Prasanna Patwardhan20/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Nov 2022

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nishigandha Society Certificate.pdf5 Jan 2023
Status of ConveyanceFile: PRCard NISHIGANDHA PARK.pdf5 Jan 2023
Other - LegalFile: PRCard NISHIGANDHA PARK.pdf5 Jan 2023
Other - LegalFile: Nishigandha Coveance Deed-1-30.pdf5 Jan 2023
Other - LegalFile: Nishigandha Coveance Deed-31-63.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A Nishigandha.pdf8 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nishigandha Completion.pdf8 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Nishigandha Form 4.pdf8 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nishigandha form 2A Quality Assurance.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nishigandha arch certificate.pdf7 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg nishigandha upto31122021.pdf7 Feb 2022
Certificates of CA (Form 3)File: Form 3.pdf7 Feb 2022
Building plan approvalFile: Sanction Sheet 1_compressed.pdf1 Feb 2022
Building plan approvalFile: Sanction Sheet 4_compressed.pdf1 Feb 2022
Building Plan Approval (IOD)File: Sanction Sheet 1_compressed.pdf1 Feb 2022
Building Plan Approval (IOD)File: Sanction Sheet 4_compressed.pdf1 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Form 5 - Bipin Bora Signed.pdf26 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 NISHIGANDHA PARK PHASE 1_compressed.pdf26 Oct 2021
Certificates of CA (Form 3)File: Archway Estate 07_10_Signed.pdf18 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nishigandha Arch certificate_compressed.pdf9 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate upto 30_09_2021_compressed.pdf9 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_compressed.pdf8 Oct 2021
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Document 45_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A September_compressed.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed (1).pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Niranjan Jog certificate_compressed.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Document 38_compressed.pdf13 Aug 2021
Certificates of CA (Form 3)File: Form 3_Archway Estate_Nishigandha_Phase I_Signed.pdf13 Aug 2021
Building plan approvalFile: Building _-003.pdf29 Jul 2021
Building plan approvalFile: Building_002.pdf29 Jul 2021
Building plan approvalFile: Building 001.pdf29 Jul 2021
Building plan approvalFile: Building 004.pdf29 Jul 2021
Building Plan Approval (IOD)File: Building 004.pdf29 Jul 2021
Building Plan Approval (IOD)File: Building _-003.pdf29 Jul 2021
Building Plan Approval (IOD)File: Building_002.pdf29 Jul 2021
Building Plan Approval (IOD)File: Building 001.pdf29 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate 23721.pdf29 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate- nishigandha.PDF29 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed (1).pdf29 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shinde joshi Architect Certificate_compressed.pdf30 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Niranjan Jog Eng Certificate.pdf30 Jan 2020
Certificates of CA (Form 3)File: Archway Estate Form-3.pdf29 Jan 2020
Certificates of CA (Form 5)File: archway estate pvtltd form 5.pdf11 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT.pdf31 Jul 2017
Certificates of CA (Form 3)File: archway estates form 3.pdf31 Jul 2017
Layout approvalFile: LAYOUT.pdf30 Jul 2017
Building plan approvalFile: LAYOUT.pdf30 Jul 2017
PAN CardFile: PAN.pdf30 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf30 Jul 2017
Details of encumbrancesFile: declaration encumbrances.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf30 Jul 2017
Building Plan Approval (IOD)File: LAYOUT.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMM CERT.pdf30 Jul 2017
Declaration in FORM BFile: form b - promoter.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT (2).pdf30 Jul 2017
Proforma of Allotment letterFile: Nishigandha-RERA draft.pdf30 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SURUCHI B SOCIETYERANDAWNE PUNE10CompletedFeb 2016Late, Apr 2016
AMRAPALI SOCIETYERANDAWNE PUNE14CompletedJul 2015Late, Sep 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NISHIGANDHA PARK PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

2 kmNISHIGANDHA PARK PHASE 1Completed 91Lapsed / revoked 43Other 199Dot size: filed unitsN

Filed coordinates, straight-line distance. 333 registered projects within 2 km.

Builder: M/S ARCHWAY ESTATES

M/S ARCHWAY ESTATES has 1 registration on MahaRERA, including NISHIGANDHA PARK PHASE 1. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NISHIGANDHA PARK PHASE 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISHIGANDHA PARK PHASE 1?

The registered promoter entity is M/S ARCHWAY ESTATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISHIGANDHA PARK PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NISHIGANDHA PARK PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NISHIGANDHA PARK PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NISHIGANDHA PARK PHASE 1?

The professionals named in the filing: Architect: Shinde Joshi & Associates; Engineer: STRUDCOM CONSULTANTS PVT LTD; Engineer: Niranjan Jog. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISHIGANDHA PARK PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISHIGANDHA PARK PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISHIGANDHA PARK PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.