Registration lapsed No litigation declared Others project

NISARG GREENS Phase - 2 E

By NND Ambernath LLP

RG-MH-67430 · RERA P51700031798 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 50%
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

NISARG GREENS Phase - 2 E is a Others project by NND Ambernath LLP in Thane, Maharashtra, registered with MahaRERA as P51700031798 on 12 Nov 2021. Possession was promised by 30 Jun 2025 and is now 16 months past that date.

At a glance

Project

  • NameNISARG GREENS Phase - 2 E
  • TypeOthers
  • Location
    • B Cabin Road
    • Ambernath East
    • Chavindra
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031798
  • ReraGenie IDRG-MH-67430

Builder

  • NameNND Ambernath LLP
  • Entity typeOthers
  • LLPINAAR-5592
  • GSTIN27AAOFM9742P1Z8
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Designated PartnersNitin Thakkar, Hemendra Vira, Mayur Satra, Girish Dedhia
  • PartnersNitin Thakkar, Hemendra Vira, Mayur Satra
  • Named personsMr. Girish V Dedhia, Nitin Thakkar, Hemendra Vira, Mayur Satra, Yogesh Thakkar
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

16 months past promisethis monthRegisteredNov 2021PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Nov 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNFLOWER B BLDG NO 11NA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

SUNFLOWER B BLDG NO 11: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered29
Open Space19

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,523 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4756.65
Proposed, not sanctioned4,757 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOne Indiabulls Centre, Tower 2B 3rd Floor, 841, Senapati Bapat Marg, Lower Parel west, Mumbai-400013

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHOMEWORK DESIGNS
EngineerMr Amritpal Singh Saund
Chartered AccountantMr Vishesh D Sangoi
PartnerRole in project
NND Ambernath LLP-

Litigation declared1

CaseCourtStatus
Reg Civil Suit No 264/2013Honble Civil Court Junior Division UlhasnagarPending for Hearing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Phase-2E_31-03-2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase-2E_31-03-2025.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Phase-2E_31-12-2024.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase-2E_31-12-2024.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Phase-2E_31-12-2024.pdf15 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 PHASE-2E_2023-24.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-2E Form-1_30-09-2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Phase-2E_31-03-2023.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate _Form 1_Phase-2E_30-09-2023.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Phase-2E_31-12-2023.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Phase-2E_31-03-2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Phase-2E_30-06-2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase-2E_31-03-2022.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase-2E_31-03-2023.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase-2E_31-03-2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-2E_ENG.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Phase-2D_31-03-2022.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Phase-2E_31-03-2023.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form3 Phase-2E_31-03-2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase-2E_CA.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PHASE 2 E.pdf28 Jun 2023
Details of encumbrancesFile: Encumbrance_Declaration_Phase 2 E.pdf16 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PHASE-2E-bldg11 30-09-2022.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PHASE-2E-bldg11 31-03-2022.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - 2E.pdf28 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: NND CC Clarification.pdf10 Nov 2021
Copy of the legal title reportFile: Title Report_BW.pdf2 Nov 2021
Proforma of Allotment letterFile: RERA Agreement Phase 2 E with Allotment Declaration.pdf14 Oct 2021
Declaration about Commencement CertificateFile: CC Declaration Phase 2 E.pdf12 Oct 2021
Layout approvalFile: Layout Plan Phase 2 E.pdf11 Oct 2021
Building plan approvalFile: Building Approval Plan 26-05-2014.pdf11 Oct 2021
Building plan approvalFile: Revised Combine Approval dated 08-06-2019_compressed.pdf11 Oct 2021
Building plan approvalFile: CC dated 16-02-2021.pdf11 Oct 2021
Details of encumbrancesFile: Encumbrance_Declaration_Phase 2 E.pdf11 Oct 2021
Copy of Layout Approval (in case of layout)File: Layout Plan Phase 2 E.pdf11 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Approval Plan 26-05-2014.pdf11 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Combine Approval dated 08-06-2019_compressed.pdf11 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: CC dated 16-02-2021.pdf11 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_02-02-2016.pdf11 Oct 2021
Declaration in FORM BFile: FORM B - Phase 2 E.pdf11 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase-2 E.pdf11 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate for Bldg No 11 Phase 2 E.pdf11 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Phase 2 E.pdf11 Oct 2021
PAN CardFile: Company PAN.pdf10 Oct 2021

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Nisarg PlazaP51700079674Morivali, Thane-Mar 2025OngoingDec 2025Not delivered
NISARG GREENS Phase - 2 FP51700031797Ambernath East, Thane-Nov 2021CompletedJun 2025Feb 2025
NISARG GREENS - Phase - 2 CP51700022586Morivali, Thane-Oct 2019CompletedOct 2024Oct 2024
NISARG GREENS - Phase - 2 BP51700022786Morivali, Thane-Oct 2019CompletedOct 2024Jan 2024
NISARG GREENS- Phase II AP51700008839Morivali, Thane-Aug 2017CompletedDec 2021Feb 2021
NISARG GREENS - Commercial Phase-IP51700016412Morivali, Thane-May 2018CompletedDec 2019May 2019
Hyde ParkSector-35G Kharghar-410210764-CompletedDec 2014Sep 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NISARG GREENS Phase - 2 E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambernath East7,600+ in Thane

2 kmNISARG GREENS Phase - 2 Completed 82Lapsed / revoked 39Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: NND Ambernath LLP

NND Ambernath LLP has 8 registrations on MahaRERA, including NISARG GREENS- Phase II A and NISARG GREENS - Commercial Phase-I. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that NISARG GREENS Phase - 2 E shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NISARG GREENS Phase - 2 E is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISARG GREENS Phase - 2 E?

The registered promoter entity is NND Ambernath LLP, an others as per the filing. Its LLPIN AAR-5592 and GSTIN 27AAOFM9742P1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISARG GREENS Phase - 2 E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NISARG GREENS Phase - 2 E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NISARG GREENS Phase - 2 E?

The professionals named in the filing: Architect: HOMEWORK DESIGNS; Engineer: Mr Amritpal Singh Saund; Chartered Accountant: Mr Vishesh D Sangoi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISARG GREENS Phase - 2 E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISARG GREENS Phase - 2 E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISARG GREENS Phase - 2 E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.