Nirmiti Seasons

By Nirmiti Enterprises

RG-MH-19425 · RERA P51800077706 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 91%
130 of 157Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Nirmiti Seasons is a Others project by Nirmiti Enterprises in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077706 on 22 Oct 2024. Possession is promised by 31 Dec 2028. 27 of the 157 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameNirmiti Seasons
  • TypeOthers
  • Location
    • Mithagar road
    • Mulund east
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • RERA no.P51800077706
  • ReraGenie IDRG-MH-19425

Builder

  • NameNirmiti Enterprises
  • Entity typePartnership
  • PartnersDIGAMBER R SUKHEE, ALOK D SUKHEE

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed59 files

Current status

17%27 of 157 units booked
62.2%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nirmiti Seasons Wing BNA232391091
Nirmiti Seasons Wing ANA181862466

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 91%.

Nirmiti Seasons Wing B59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Nirmiti Seasons Wing A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes50%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed171

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots171
Closed/Covered171
BuildingClosed/CoveredTotal
Nirmiti Seasons Wing B100100
Nirmiti Seasons Wing A7171

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,688 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025
LandownerVillageDistrict
Mulund Shreedhar CHS LtdMulundMumbai Suburban
M.C.G.B Staff Malhar CHS LtdMulundMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY(SRA)
Permissible FSI9009.36
Proposed, not sanctioned4,738 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATNAM APARTMENTS, L.T. ROAD, MULUND (E), MUMBAI-400081, STATE- MAHARASHTRA
Estimated costRs 12.84 cr
Cost incurredRs 7.99 cr
Work done62.23%
BuildingWingEstimatedIncurred
Nirmiti Seasons Wing BNARs 6.42 crRs 4.05 cr
Nirmiti Seasons Wing ANARs 5.78 crRs 3.73 cr
-NARs 64.19 lakhRs 21.30 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Crest Axiom
EngineerMahimutra Consultants
EngineerSarang Namdev Jadhav
Chartered AccountantPritam Nevrekar and Associates
Chartered AccountantH P Jadeja & Associates
PartnerRole in project
Nirmiti Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 25-26 Nirmiti Seasons.pdf28 May 2026
Withdrawal Update Form 2File: Form 2 Q4 25-26 Nirmiti Seasons.pdf28 May 2026
Withdrawal Update Form 3File: Form 3 Q4 25-26 Nirmiti Seasons New.pdf28 May 2026
Withdrawal Update Form 1File: Form 1 Q3 25-26.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3 25-26 sign.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 25-26 Nirmiti signed new.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1 Q1 25-26 new.pdf6 Jan 2026
Withdrawal Update Form 1File: Form 1 Q2 25-26 new.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Q1 25-26 sign.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 Q2 25-26 sign.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 Q1 2025-26 new.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 Q2 2025-26 new.pdf6 Jan 2026
Withdrawal Update Form 1File: Form 1 Q3 24-25.pdf15 Dec 2025
Withdrawal Update Form 1File: Form 1 Q4 24-25.pdf15 Dec 2025
Withdrawal Update Form 2File: Form 2 Q3 24-25.pdf15 Dec 2025
Withdrawal Update Form 2File: Form 2 Q4 24-25.pdf15 Dec 2025
Withdrawal Update Form 3File: Form 3 Q3 Nirmiti Enterprises_compressed.pdf15 Dec 2025
Withdrawal Update Form 3File: Form 3 Q4 Nirmiti Enterprises_compressed.pdf15 Dec 2025
Details of encumbrances concerned to FinanceFile: Nirmit Encumbrance merged.pdf16 Oct 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter No Deviation 15 10 24.pdf16 Oct 2024
Details of encumbrances concerned to LegalFile: Nirmit Encumbrance merged.pdf16 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report 15 10 24_compressed.pdf16 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: SC284e C28424070813120 (1).pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 17 10 24_compressed.pdf14 Oct 2024
CERSAI detailsFile: 1 CERSAI details-1.pdf14 Oct 2024
Other - FinanceFile: NIRMITI FORMAT A.pdf14 Oct 2024
Declaration about Commencement CertificateFile: cc declaration-1.pdf10 Oct 2024
Other - TechnicalFile: 1 Other - Legal.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate.pdf11 Aug 2024
Copy of the legal title reportFile: Legal Title Report 06082024.pdf6 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DRSukhee Annexure A.pdf5 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Loan Nirmiti Seasons.pdf5 Aug 2024
Proforma of Allotment letterFile: Allotment Letter FINAL 14 10 24_compressed (1).pdf1 Aug 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged.pdf31 Jul 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged.pdf31 Jul 2024
Proforma of Agreement for saleFile: Agreement for Sale Nirmiti Seasons 17 10 24.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Annexure B.pdf13 Jul 2024
Building plan approvalFile: 8.pdf12 Jul 2024
Building plan approvalFile: 7.pdf12 Jul 2024
Building plan approvalFile: 6.pdf12 Jul 2024
Building plan approvalFile: 5.pdf12 Jul 2024
Building plan approvalFile: 4.pdf12 Jul 2024
Building plan approvalFile: 3.pdf12 Jul 2024
Building plan approvalFile: 2.pdf12 Jul 2024
Layout approvalFile: 1.pdf12 Jul 2024
PAN CardFile: PAN CARD NIRMITI ENTERPRISES.pdf12 Jul 2024
Copy of Layout Approval (in case of layout)File: 1.pdf12 Jul 2024
Declaration in FORM BFile: Nirmiti Affidavit.pdf12 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC upto plinth comp.pdf12 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC upto plinth comp.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf12 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf12 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: SC284e C28424070813121.pdf12 Jul 2024

How this compares with Mumbai Suburban

17%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nirmiti Seasons on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund east6,700+ in Mumbai Suburban

Builder: Nirmiti Enterprises

Nirmiti Enterprises has 1 registration on MahaRERA, including Nirmiti Seasons. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Nirmiti Seasons is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nirmiti Seasons?

The registered promoter entity is Nirmiti Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nirmiti Seasons?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nirmiti Seasons?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nirmiti Seasons?

The professionals named in the filing: Architect: Design Crest Axiom; Engineer: Mahimutra Consultants; Engineer: Sarang Namdev Jadhav; Chartered Accountant: Pritam Nevrekar and Associates; Chartered Accountant: H P Jadeja & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nirmiti Seasons?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nirmiti Seasons. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nirmiti Seasons to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.