NIRMITEE HEIGHTS

By PRAVIN KESHAV BADHEKAR

RG-MH-37366 · RERA P52100077284 · Last updated on MahaRERA portal: 13 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 22%
10 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

NIRMITEE HEIGHTS is a Others project by PRAVIN KESHAV BADHEKAR in Pune, Maharashtra, registered with MahaRERA as P52100077284 on 6 Aug 2024. Possession is promised by 31 Dec 2027. 0 of the 10 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameNIRMITEE HEIGHTS
  • TypeOthers
  • Location
    • PAUD ROAD
    • SHIVTIRTH NAGAR
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077284
  • ReraGenie IDRG-MH-37366

Builder

  • NamePRAVIN KESHAV BADHEKAR
  • Entity typeIndividual
  • GSTIN27AEPPB8899F1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations14 more →
  • Completed2 of 15
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

0%0 of 10 units booked
31.7%Work done, per cost certificate

Figures as on 13 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIRMITEE HEIGHTSNA523710

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 22%.

NIRMITEE HEIGHTS: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure22%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,384 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Nov 2025
LandownerVillageDistrict
NIRMITEE HEIGHTS CO-OP HSG SOCKothrudPune
BADHEKAR DEVELOPERSKothrudPune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI5536.96
Proposed, not sanctioned511 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGUJRAT COLONY, DP ROAD, KOTHRUD, PUNE-411038
Estimated costRs 17.58 cr
Cost incurredRs 5.56 cr
Work done31.66%
BuildingWingEstimatedIncurred
NIRMITEE HEIGHTSNARs 16.13 crRs 5.49 cr
-NARs 1.45 crRs 7.87 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBABASAHEB DHAVALEPATIL & ASSOCIATES
EngineerG A BHILARE CONSULTANTS PVT. LTD.
EngineerDipali Amit Kulkarni
Chartered AccountantSHRIKANT MANTRI AND CO
Chartered AccountantDinesh Gandhi
Chartered AccountantSHRIKANT MANTRI AND CO.
PartnerRole in project
BADHEKAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect certificate Nirmitee heights Sep-25.pdf13 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Nirmitee heights site Dec-25..pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate Nirmitee heights Sept-25.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate Nirmitee heights Dec-25.pdf13 Apr 2026
Withdrawal Update Form 3File: RERA Form 3 Nirmitee Heights up to Sep-25 Scan.pdf13 Apr 2026
Withdrawal Update Form 3File: RERA Form 3 Nirmitee Heights up to Dec-25 Scan.pdf13 Apr 2026
Building plan approvalFile: 1-10.pdf11 Apr 2026
Building plan approvalFile: 2-10.pdf11 Apr 2026
Building plan approvalFile: 3-10.pdf11 Apr 2026
Building plan approvalFile: 4-10.pdf11 Apr 2026
Building plan approvalFile: 5-10.pdf11 Apr 2026
Building plan approvalFile: 6-10.pdf11 Apr 2026
Building plan approvalFile: 7-10.pdf11 Apr 2026
Building plan approvalFile: 8-10.pdf11 Apr 2026
Building plan approvalFile: 9-10.pdf11 Apr 2026
Building plan approvalFile: 10-10.pdf11 Apr 2026
Commencement certificateFile: NEERAJ - NIRMITEE HEIGHTS CC.pdf11 Apr 2026
Withdrawal Update Form 1File: Architect certificate Nirmitee heights June-25..pdf11 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers certificate Nirmitee heights Jun-25..pdf11 Apr 2026
Withdrawal Update Form 3File: RERA Form 3 Nirmitee Heights up to Jun-25 Scan.pdf11 Apr 2026
Form 5 (FY 2024-2025)File: Nirmitee FY 24-25 RERA 5 Scan.pdf26 Mar 2026
Form 2A (FY 2025-2026)File: Form 2A Nirmitee Heights 25-26.pdf22 Jan 2026
Form 1File: Architect certificate Nirmitee heights Mar-25..pdf24 Nov 2025
Form 2File: Architect certificate Nirmitee heights Mar-25..pdf24 Nov 2025
Form 3File: Architect certificate Nirmitee heights Mar-25..pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect certificate Nirmitee heights Mar-25..pdf24 Nov 2025
Form 1File: Architect’s Certificate - Nirmitee Dec 2024.pdf24 Nov 2025
Form 2File: Engineer’s Certificate - Nirmitee Dec 2024.pdf24 Nov 2025
Form 3File: CA Certificate - Nirmitee Dec 2024.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Nirmitee Dec 2024.pdf24 Nov 2025
Form 1File: Architect certificate Nirmitee heights Sept -24....pdf24 Nov 2025
Form 2File: Architect certificate Nirmitee heights Sept -24..pdf24 Nov 2025
Form 3File: Architect certificate Nirmitee heights Sept -24....pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect certificate Nirmitee heights Sept -24..pdf24 Nov 2025
Form 2A (FY 2024-2025)File: Form 2 A Nirmitee heights 24-25..pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Nirmiti Heights up to Dec-24 Scan.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Nirmitee Heights Dec-24.pdf26 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in REO-Pitale.pdf26 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in REO-Span Promoters.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QAC Nirmitee site 23-24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Nirmitee heights Dec-24.pdf18 Feb 2025
Building plan approvalFile: NEERAJ NIRMITEE BLD PERMISSION 1_5.pdf31 Jul 2024
Building plan approvalFile: NEERAJ NIRMITEE BLD PERMISSION 2_5.pdf31 Jul 2024
Building plan approvalFile: NEERAJ NIRMITEE BLD PERMISSION 3_5.pdf31 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: NEERAJ NIRMITEE BLD PERMISSION 1_5.pdf31 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: NEERAJ NIRMITEE BLD PERMISSION 2_5.pdf31 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: NEERAJ NIRMITEE BLD PERMISSION 3_5.pdf31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate Bank Account Nirmitee 180724.pdf30 Jul 2024
Other - LegalFile: Revised Form B Nirmitee Heights 180724.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nirmitee Revised RERA Form - 3 New 160724_compressed.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Nirmitee 040724.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth (1200-2022).pdf18 Jun 2024
Other - LegalFile: Booking Agreement to Sell 2023 Nirmitee.pdf9 Jun 2024
CERSAI detailsFile: Undertaking for No CERSAI Nirmitee Heights.pdf25 Apr 2024
Other - LegalFile: Undertaking for OPOR Nirmitee Heights.pdf25 Apr 2024
Copy of the legal title reportFile: Nirmitee Title Search for RERA-20_02_24.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Nirmitee.pdf17 Feb 2024
Other - TechnicalFile: Declaration about Sanctioned Floors.pdf11 Feb 2024
Proforma of Agreement for saleFile: Booking Agreement to Sell 2023 Nirmitee.pdf11 Jan 2024
Layout approvalFile: NEERAJ NIRMITEE AMALGAMTION.pdf10 Jan 2024
Building plan approvalFile: NEERAJ NIRMITEE BLD PERMISSION 4_5.pdf10 Jan 2024
Building plan approvalFile: NEERAJ NIRMITEE BLD PERMISSION 5_5.pdf10 Jan 2024
PAN CardFile: Pan card scan copy.pdf10 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Finance.pdf10 Jan 2024
Details of encumbrances concerned to FinanceFile: Nirmiti no encumb legal.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Finance.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: Nirmiti no encumb legal.pdf10 Jan 2024
Copy of Layout Approval (in case of layout)File: NEERAJ NIRMITEE AMALGAMTION.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEERAJ NIRMITEE BLD PERMISSION 4_5.pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: NEERAJ NIRMITEE BLD PERMISSION 5_5.pdf10 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NEERAJ AND NIRMITEE BLD PERM CC.pdf10 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NEERAJ AND NIRMITEE AMALGAMATION CC.pdf10 Jan 2024
Declaration about Commencement CertificateFile: Nirmiti declaration about cc.pdf10 Jan 2024
Declaration in FORM BFile: Revised Form B Nirmitee Heights 180724.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations.pdf10 Jan 2024
Proforma of Allotment letterFile: Nirmiti Allotment letter.pdf10 Jan 2024
Deviation Report with respect to Allotment letterFile: Nirmiti no deviation al.pdf10 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Nirmiti no deviation Afs.pdf10 Jan 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAMRUDDHI RESIDENCYP52100006236Warje, Pune15Aug 2017CompletedFeb 2023Registered original: Jul 2019Late, Feb 2024
VINAYAK15P52100007478Rambaug Colony, Pune14Aug 2017CompletedNov 2021Dec 2019

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMITEE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVTIRTH NAGAR13,700+ in Pune

2 kmNIRMITEE HEIGHTSCompleted 94Lapsed / revoked 51Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 299 registered projects within 2 km.

Builder: PRAVIN KESHAV BADHEKAR

PRAVIN KESHAV BADHEKAR has 15 registrations on MahaRERA, including SAMRUDDHI RESIDENCY and VINAYAK15. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NIRMITEE HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMITEE HEIGHTS?

The registered promoter entity is PRAVIN KESHAV BADHEKAR, an individual as per the filing. Its GSTIN 27AEPPB8899F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMITEE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMITEE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMITEE HEIGHTS?

The professionals named in the filing: Architect: BABASAHEB DHAVALEPATIL & ASSOCIATES; Engineer: G A BHILARE CONSULTANTS PVT. LTD.; Engineer: Dipali Amit Kulkarni; Chartered Accountant: SHRIKANT MANTRI AND CO; Chartered Accountant: Dinesh Gandhi; Chartered Accountant: SHRIKANT MANTRI AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMITEE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMITEE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMITEE HEIGHTS to a free account