Home / Browse projects / Thane, Maharashtra / NIRMAN SIGNATURE

Completed No litigation declared Others project

NIRMAN SIGNATURE

By SHREE SHA DEVELOPERS

RG-MH-00048 · RERA P51700050640 · Last updated on MahaRERA portal: 27 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
24 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NIRMAN SIGNATURE is a Others project by SHREE SHA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700050640 on 21 Apr 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 51 of the 75 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameNIRMAN SIGNATURE
  • TypeOthers
  • Location
    • Boradpada Road
    • Badlapur (W)
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050640
  • ReraGenie IDRG-MH-00048

Builder

  • NameSHREE SHA DEVELOPERS
  • Entity typePartnership
  • PartnerSAGAR DIGAMBER SHETE

Key dates

this monthRegisteredApr 2023PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Current status

68%51 of 75 units booked
69.5%Work done, per cost certificate

Figures as on 27 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nirman SignatureNA1111471259
Rain BaseraNA5561016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Nirman Signature82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Rain Basera82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered9
Open Space92
BuildingClosed/CoveredOpen SpaceTotal
Nirman Signature26769
Rain Basera72532

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,140 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Mar 2026
LandownerVillageDistrict
KARUNA SHANKAR HUBLAL RAIDASBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityBadlapur
Permissible FSI3388.3
Proposed, not sanctioned3,388 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 51 VED BUNGLOW NEAR OLD TALATHI OFFICE KULGAON BADLAPUR EAST
Estimated costRs 24.55 cr
Cost incurredRs 17.05 cr
Work done69.45%
BuildingWingEstimatedIncurred
Nirman SignatureNARs 12.15 crRs 8.50 cr
Rain BaseraNARs 12.15 crRs 8.50 cr
-NARs 25.00 lakhRs 5.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPramod V Patil
EngineerShanti Consultants
Chartered AccountantAshwini k Prabhu & Associates
Chartered AccountantMukesh Jain
PartnerRole in project
SHREE SHA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Dec.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec.pdf27 Mar 2026
Occupational CertificateFile: OC.pdf27 Mar 2026
Withdrawal Update Form 1File: Form 1 June 2025.pdf26 Mar 2026
Withdrawal Update Form 1File: Shreesha Developers Form 1.pdf26 Mar 2026
Withdrawal Update Form 2File: Form 2 june 2025.pdf26 Mar 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf26 Mar 2026
Withdrawal Update Form 3File: Form 3 June 25.pdf26 Mar 2026
Withdrawal Update Form 3File: Form 3 Sep 25.pdf26 Mar 2026
Withdrawal Update Form 1File: Form 1 June 2025.pdf14 Nov 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2 june 2025.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2 june 2025.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 June25.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 June25.pdf14 Nov 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf9 Oct 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf9 Oct 2025
Withdrawal Update Form 2File: Form 2 june 2025.pdf9 Oct 2025
Withdrawal Update Form 2File: Form 2 june 2025.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 June25.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 June25.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: Shree sha Form 5 March 25.pdf22 Jul 2025
Withdrawal Update Form 1File: Form 1 March 2025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 March 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 March 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 March 2025.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 March 2025.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 March 2025.pdf21 Jul 2025
Form 1File: Form 1 March 2025.pdf19 Jul 2025
Form 2File: Form 2 March 2025.pdf19 Jul 2025
Form 3File: Form 3 March 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 March 2025.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 2024_compressed.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree sha form 1 June 24.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree sha form 1 Sep 24.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shree sha June 24.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shree sha Sep 24.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 shree sha June 24.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 shree sha Sep 24.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: shree sha form 5 23-24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shree Sha Mar 24.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree Sha Mar 24.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24 Shree Sha.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree sha form 3 Dec 23_compressed.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree sha form 1 June 23.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree sha form 1 sep 23.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shreesha form 2 June 23.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shree sha form 2 sep 23.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: shree sha sold unsold.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shree sha form 3 Jun 23_compressed.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shreesha form 3 sep 23_compressed.pdf14 Oct 2023
Building plan approvalFile: Building Plan_11zon_11zon.pdf17 Apr 2023
Layout approvalFile: Layout Plan_11zon.pdf17 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Plan_11zon.pdf17 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_11zon_11zon.pdf17 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of int Bhavanji Patel.pdf11 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of int sagar shete (1).pdf11 Apr 2023
Proforma of Allotment letterFile: Allotment Letter_merged.pdf1 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for Sale agreement_11zon.pdf21 Mar 2023
Declaration in FORM BFile: Form B affidavit shree sha_compressed.pdf18 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shree sha_11zon.pdf18 Mar 2023
Deviation Report with respect to Allotment letterFile: deviation report - allotment letter.pdf18 Mar 2023
Details of encumbrances concerned to FinanceFile: non encumbrance certificate shree sha .pdf15 Mar 2023
Details of encumbrances concerned to LegalFile: non encumbrance certificate shree sha .pdf15 Mar 2023
Declaration about Commencement CertificateFile: declaration about commencement shree sha .pdf15 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shree sha engineer certificate .pdf15 Mar 2023
CERSAI detailsFile: undertaking shree sha .pdf15 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account shree sha .pdf15 Mar 2023
Copy of the legal title reportFile: Title.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf9 Mar 2023
Proforma of Agreement for saleFile: FlatSale - ShreeShaDevelopers(sagarShete) (RERA) - Draft02.pdf4 Mar 2023
PAN CardFile: pan shree sha dev .pdf3 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate _compressed.pdf3 Mar 2023

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAN SIGNATURE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur (W)7,600+ in Thane

2 kmNIRMAN SIGNATURECompleted 174Lapsed / revoked 64Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: SHREE SHA DEVELOPERS

SHREE SHA DEVELOPERS has 1 registration on MahaRERA, including NIRMAN SIGNATURE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NIRMAN SIGNATURE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAN SIGNATURE?

The registered promoter entity is SHREE SHA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAN SIGNATURE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAN SIGNATURE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAN SIGNATURE?

The professionals named in the filing: Architect: Pramod V Patil; Engineer: Shanti Consultants; Chartered Accountant: Ashwini k Prabhu & Associates; Chartered Accountant: Mukesh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAN SIGNATURE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAN SIGNATURE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAN SIGNATURE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.