ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / NIRMAN COSMOPOLIS

Registered No litigation declared Others project

NIRMAN COSMOPOLIS

By Realcon Properties LLP

RG-MH-37569 · RERA P52100051380 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
29 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 99%
222 of 554Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 247 documents Report an error

NIRMAN COSMOPOLIS is a Others project by Realcon Properties LLP in Pune, Maharashtra, registered with MahaRERA as P52100051380 on 8 Jun 2023. Possession is promised by 31 Dec 2030. 332 of the 554 units on this registration are recorded sold or booked, and 29 of 55 construction stages are filed complete.

At a glance

Project

  • NameNIRMAN COSMOPOLIS
  • TypeOthers
  • Location
    • Sr. No. 29/1A and 29/1B
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051380
  • ReraGenie IDRG-MH-37569

Builder

  • NameRealcon Properties LLP
  • Entity typeOthers
  • GSTIN27ABBFR8627A1ZB
  • PartnersPratik Sunil Agarwal, Bhushan Rajiv Agarwal
  • Named personsJaideep Dhananjay Modak, Greens Tathwade LLP, Rajesh Krishnakumar Goyal
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings5 building records
  • Documents filed247 files

Current status

60%332 of 554 units booked
64.8%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA322611511126
Building BNA322611510125
Building CNA32261159124
Building DNA322611510125
Building ENA322648654

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 99%.

Building A47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
Building B54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
Building C65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.7%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.13%
Building D80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%
Building E72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1028

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,028
Closed/Covered1,028
BuildingClosed/CoveredTotal
Building A232232
Building B232232
Building C232232
Building D232232
Building E100100

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jun 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI82948.83
Proposed, not sanctioned81,204 sq m
Buildings approved6
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Maruti House Plot No Gp187 G Block Midc Pimpri Chinchwad Industrial Area Thermax Chowk
Estimated costRs 255.00 cr
Cost incurredRs 165.18 cr
Work done64.77%
BuildingWingEstimatedIncurred
Building DNARs 58.38 crRs 37.81 cr
Building BNARs 56.87 crRs 36.84 cr
Building CNARs 56.39 crRs 36.52 cr
Building ENARs 35.95 crRs 23.29 cr
-NARs 25.50 crRs 16.52 cr
Building ANARs 21.91 crRs 14.19 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTrupta Joshi
ArchitectV K ASSOCIATES
EngineerSunil Kalore
EngineerPRALHAD RAMCHANRA SURALKAR
Chartered AccountantNavdeep Jindal
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
Realcon Properties LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed247

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 247 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 (2).pdf3 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf3 Jul 2026
Withdrawal Update Form 3File: New Form 3.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 (1).pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 (2).pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 signed_compressed (3).pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 Sign.pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1_.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3_compressed (1).pdf13 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Cosmopolis signed.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2 A.pdf25 Aug 2025
Layout approvalFile: 01-29.pdf13 Aug 2025
Building plan approvalFile: 2-3.pdf13 Aug 2025
Building plan approvalFile: 4-6.pdf13 Aug 2025
Building plan approvalFile: 7-9.pdf13 Aug 2025
Building plan approvalFile: 10-12.pdf13 Aug 2025
Building plan approvalFile: 13-15.pdf13 Aug 2025
Building plan approvalFile: 16-18.pdf13 Aug 2025
Building plan approvalFile: 19-21.pdf13 Aug 2025
Building plan approvalFile: 22-24.pdf13 Aug 2025
Building plan approvalFile: 25-27.pdf13 Aug 2025
Building plan approvalFile: 28-29.pdf13 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf7 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf7 Jul 2025
Withdrawal Update Form 3File: Form 3 SIGNED_compressed.pdf7 Jul 2025
Form 1File: Form 1 NIRMAN COSMOPOLIS.pdf25 Jun 2025
Form 2File: Form 2 NIRMAN COSMOPOLIS.pdf25 Jun 2025
Form 3File: Form 3 NIRMAN COSMOPOLIS.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold NIRMAN COSMOPOLIS_24.pdf25 Jun 2025
Form 1File: Form 1_.pdf25 Jun 2025
Form 2File: Form 2.pdf25 Jun 2025
Form 3File: Form 3 Signed new_compressed.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory March_25_removed.pdf25 Jun 2025
Form 1File: Form 1 Signed_.pdf25 Jun 2025
Form 2File: Form 2 Signed_removed.pdf25 Jun 2025
Form 3File: Form 3 Signed_.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold Signed_.pdf25 Jun 2025
Form 1File: Form 1.pdf25 Jun 2025
Form 2File: Form 2_Sep 24.pdf25 Jun 2025
Form 3File: Form 3_11zon.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf3 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured and Unsecured Loan Letter.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed_.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Signed_.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report ( Nirman Cosmopolis ).pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A NIRMAN COSMOPOLIS.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A NIRMAN COSMOPOLIS.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report ( Nirman Cosmopolis ).pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf29 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Sold Unsold Inventory.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 NIRMAN COSMOPOLIS.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 NIRMAN COSMOPOLIS.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold NIRMAN COSMOPOLIS.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 NIRMAN COSMOPOLIS.pdf25 Apr 2024
Layout approvalFile: 01-31.pdf4 Apr 2024
Building plan approvalFile: 02-31.pdf4 Apr 2024
Building plan approvalFile: 03-31.pdf4 Apr 2024
Building plan approvalFile: 04-31.pdf4 Apr 2024
Building plan approvalFile: 05-31.pdf4 Apr 2024
Building plan approvalFile: 06-31.pdf4 Apr 2024
Building plan approvalFile: 07-31.pdf4 Apr 2024
Building plan approvalFile: 08-31.pdf4 Apr 2024
Building plan approvalFile: 09-31.pdf4 Apr 2024
Building plan approvalFile: 10-31.pdf4 Apr 2024
Building plan approvalFile: 11-31.pdf4 Apr 2024
Building plan approvalFile: 12-31.pdf4 Apr 2024
Building plan approvalFile: 13-31.pdf4 Apr 2024
Building plan approvalFile: 14-31.pdf4 Apr 2024

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAN COSMOPOLIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathwade13,700+ in Pune

2 kmNIRMAN COSMOPOLISCompleted 65Lapsed / revoked 27Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 166 registered projects within 2 km.

Builder: Realcon Properties LLP

Realcon Properties LLP has 2 registrations on MahaRERA, including NIRMAN COSMOPOLIS and The Enclave 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NIRMAN COSMOPOLIS is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAN COSMOPOLIS?

The registered promoter entity is Realcon Properties LLP, an others as per the filing. Its GSTIN 27ABBFR8627A1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAN COSMOPOLIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAN COSMOPOLIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAN COSMOPOLIS?

The professionals named in the filing: Architect: Trupta Joshi; Architect: V K ASSOCIATES; Engineer: Sunil Kalore; Engineer: PRALHAD RAMCHANRA SURALKAR; Chartered Accountant: Navdeep Jindal; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAN COSMOPOLIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAN COSMOPOLIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAN COSMOPOLIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.