Home / Browse projects / Pune, Maharashtra / Nirman Aura Wing A

Completed No litigation declared Residential / Group Housing project

Nirman Aura Wing A

By GALAXY HILL PARADISE LLP

RG-MH-15381 · RERA P52100023728 · Last updated on MahaRERA portal: 27 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

Nirman Aura Wing A is a Residential / Group Housing project by GALAXY HILL PARADISE LLP in Pune, Maharashtra, registered with MahaRERA as P52100023728 on 2 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNirman Aura Wing A
  • TypeResidential / Group Housing
  • Location
    • KARVE ROAD
    • ERANDWANE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • RERA no.P52100023728
  • ReraGenie IDRG-MH-15381

Builder

  • NameGALAXY HILL PARADISE LLP
  • Entity typeOthers
  • Named personsULTIMATE PARADISE LLP, PHOENIX CONTRACTOR & BUILDER LLP
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Wing A: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed305

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots305
Closed/Covered191
Open Space114

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,318 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8530.7
Proposed, not sanctioned6,662 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KULKARNI
EngineerPraful Rode
Chartered AccountantVinay Chordia
PartnerRole in project
GALAXY HILL PARADISE LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500228Ram GawaliGALAXY HILL PARADISE LLP27/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Oct 2024

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 aura 30 jun 2024.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Galaxy Hill P Rera-Annual Reports statement A Bldg.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AURA 30 SEPT 2024.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf27 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf21 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certifica Wing - A.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Nirman Aura A Building.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q1.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q2.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q3.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q4.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 aura 31-12-23.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 aura 30 sept 2023_compressed.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Galaxy Hill Form 5.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 30-06-2023.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 aura 30 june 2023.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aura form 3 30 june 23_compressed.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 31 March 2020.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 30 June 2020.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 30 Sept 2020.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 31 Dec 2020.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 31 March 2021.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 30 June 2021.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 31 March 2022.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 30 Sept 2022.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 31 Dec 2022.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 31 March 2023_compressed.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 31 march 2023.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form-3-31 march 2020.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - 30 june 2020.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form-03-30 sept 2020.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 03 - 31 dec 2020_compressed.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 -31 mar 2021.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3-30 sept 2021.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 From 3 - 31 dec 2020.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form-03-31 dec 2021_compressed.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form-3-31 march 2022.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3-30 sept 2022.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 form 3 aura 31 march 23_compressed.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 march 2020_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 june 2020_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 sept 2020 (2)_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 dec 2020 (2)_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 march 2021_compressed.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 march 2022.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 june 2022.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 dec 2022 (2).pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 march 2023.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a 31 mar 2020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a 30 jun 2020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a 30 sept 2020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a 31 dec 2020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a 31 mar 2021.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31 MAR 2022.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 30 JUNE 2022.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 30 SEP 2022.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31 DEC 2022.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AURA_compressed.pdf15 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Galaxy Hill P Rera-Annual Reports A Final.pdf1 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 aura a 2022.pdf24 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Aug 2022
CERSAI detailsFile: Nirman Aura.pdf7 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 aura A.pdf25 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 2022 (2)_compressed.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 aura 2022_compressed.pdf13 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (2).pdf8 Jan 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Nirman Aura Wing BP52100014502Ambegaon Budruk, PuneDec 2017Certificate SignedDec 2022Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nirman Aura Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDWANE13,700+ in Pune

Builder: GALAXY HILL PARADISE LLP

GALAXY HILL PARADISE LLP has 2 registrations on MahaRERA, including Nirman Aura Wing B and Nirman Aura Wing A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nirman Aura Wing A is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nirman Aura Wing A?

The registered promoter entity is GALAXY HILL PARADISE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nirman Aura Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nirman Aura Wing A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nirman Aura Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nirman Aura Wing A?

The professionals named in the filing: Architect: PRAKASH KULKARNI; Engineer: Praful Rode; Chartered Accountant: Vinay Chordia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nirman Aura Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nirman Aura Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nirman Aura Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.