Completed No litigation declared Residential / Group Housing project

Nilay

By ANGAL & CO

RG-MH-39860 · RERA P52100052245 · Last updated on MahaRERA portal: 5 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Installation of Lifts, 75%
4 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Nilay is a Residential / Group Housing project by ANGAL & CO in Pune, Maharashtra, registered with MahaRERA as P52100052245 on 2 Aug 2023. The registration is recorded completed; possession was promised by 5 Jun 2026. 10 of the 14 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameNilay
  • TypeResidential / Group Housing
  • Location
    • Late Suryakant Pandit Path
    • Shivajinagar (Bhamburda)
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052245
  • ReraGenie IDRG-MH-39860

Builder

  • NameANGAL & CO
  • Entity typePartnership
  • PartnersSOHAN DILIP ANGAL, DILIP SUBHASH ANGAL, SONIA VIKRAM OGALE
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2023PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Aug 2023
  • Promised completion5 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

71%10 of 14 units booked

Figures as on 5 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NilayNA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 75%.

Nilay: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 5 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered19
Open Space6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area512 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2024

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2047.53
Proposed, not sanctioned2,048 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS No 885 1 FP No 241 1 Bhandarkar Institute Road Deccan Gymkhana Pune 411 004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Collaborative
EngineerBapat Engineers & Valuers Pvt. Ltd.
Chartered AccountantGosavi Yardi & Co.
Chartered AccountantMukund Ingalgaonkar & Associates
PartnerRole in project
ANGAL & CO-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: PMC email to RERA for OC 2 Final.pdf5 Aug 2025
Occupational CertificateFile: Full Occupancy Certificate For Nilay.pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nilay.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nilay.pdf15 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Nilay Form 2A 24-25.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 For Nilay (2).pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Flat For Nilay.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 For Nilay 010125.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Nilay 010125.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 For Nilay 010125.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Unsold Inventory For Nilay 7Jan2025.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 For Nilay (1).pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate 1-Oct-2024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate Nilay.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure - B Form 2 For Nilay.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Unsold Inventory For Nilay 30Sep2024.pdf21 Oct 2024
Form 1File: 2 Architect’s Certificate sep 2023.pdf26 Sep 2024
Form 2File: 2 Engineer’s Certificate sep 2023.pdf26 Sep 2024
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory sep 2023.pdf26 Sep 2024
Disclosure of sold/ booked inventoryFile: sold unsold (2).pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Nilay.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 For Nilay (2).pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 For Nilay.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 For Nilay 01042024.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Nilay Form-2A 01042024.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D Form 3 (1).pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 01042024.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Nilay.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B - Form 2 01012024.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory 01012024.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D - Form 3.pdf9 Jan 2024
Building plan approvalFile: Nilay PMC.pdf20 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Nilay PMC.pdf20 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 091123.pdf20 Nov 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate For Nilay 091123.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nilay.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nilay - Form 3_compressed.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate 01-10-23.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: Nilay Sold And Unsold Inventory.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nilay - Form 3 210723.pdf21 Jul 2023
Proforma of Agreement for saleFile: Nilay - RERA Flat Sale Agreement - 210723.pdf21 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Nilay - Deviation Certificate (AtS).pdf21 Jul 2023
Declaration in FORM BFile: Nilay Form B (Affidavit cum Declaration).pdf13 Jul 2023
Layout approvalFile: Nilay PMC 050623.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: Nilay PMC 050623.pdf6 Jul 2023
Deviation Report with respect to Allotment letterFile: Nilay - Deviation Certificate (Allotment).pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nilay Form 2 250623.pdf3 Jul 2023
Copy of the legal title reportFile: Nilay Title Opinion (Format A) - reduced.pdf29 Jun 2023
Details of encumbrances concerned to FinanceFile: Nilay - No Encumbrance Certificate.pdf29 Jun 2023
Details of encumbrances concerned to LegalFile: Nilay - No Encumbrance Certificate.pdf29 Jun 2023
Proforma of Allotment letterFile: Nilay - ANNEXURE 1 (Allotment Letter) - Final.pdf29 Jun 2023
Building plan approvalFile: Nilay PMC 050623.pdf27 Jun 2023
PAN CardFile: Angal and Co PAN.pdf27 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Nilay PMC 050623.pdf27 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Nilay - Commencement 050623.pdf27 Jun 2023
Declaration about Commencement CertificateFile: Nilay - Format D - Declaration about Commencement.pdf27 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nilay Form 1.pdf27 Jun 2023
CERSAI detailsFile: Nilay - CERSAI Declaration.pdf27 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilay - Annexture A (Disclosure of Interest).pdf27 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Nilay - Format A - Separate Bank Account.pdf27 Jun 2023

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NakshatraS No 5 by 81 plus 82 Pashan90CompletedSep 2024Nov 2022
IreneFP No 116 117 121by6 Lane No 13 Prabhat Road9CompletedDec 2020Oct 2019
RatnaPadmaCTS No 301 FP No 63 Shilavihar Colony Erandvane11CompletedJun 2018Feb 2018
TATHASTUOFF LANE NO 14 PRABHAT ROAD ERANDWANE PUNE 41100411CompletedDec 2016Oct 2016
ADORABEHIND MITCON COLLEGE BALEWADI PUNE 41104517CompletedDec 2015Late, Jun 2016
SHAKUNTALModel Colony Shivajinagar Pune 4110166CompletedJun 2014Late, Sep 2014
FLORENZAHARE KRISHNA MANDIR ROAD MODEL COLONY SHIVAJINAGAR PUNE 41101610CompletedDec 2013Nov 2013
BOUGAN VILASBEHIND MITCON COLLEGE BALEWADI PUNE 4110452CompletedJun 2013Mar 2013

How this compares with Pune

71%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nilay on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivajinagar (Bhamburda)13,700+ in Pune

2 kmNilayCompleted 5Lapsed / revoked 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: ANGAL & CO

ANGAL & CO has 5 registrations on MahaRERA, including RATNAPADMA and Irene. Its filings disclose 8 earlier MahaRERA projects: declares 6 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nilay is delayed beyond 5 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nilay?

The registered promoter entity is ANGAL & CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nilay?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nilay?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nilay?

The professionals named in the filing: Architect: Studio Collaborative; Engineer: Bapat Engineers & Valuers Pvt. Ltd.; Chartered Accountant: Gosavi Yardi & Co.; Chartered Accountant: Mukund Ingalgaonkar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nilay?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nilay. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nilay to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.