Home / Browse projects / Daman, Daman & Diu / Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E

Registration lapsed No litigation declared Residential / Group Housing project

Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E

By SUNIL KESHAV DESAI

RG-MH-00439 · RERA P49500000038 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
9 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E is a Residential / Group Housing project by SUNIL KESHAV DESAI in Daman, Daman & Diu, registered with MahaRERA as P49500000038 on 19 Aug 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 53 of the 62 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameNiketan Dreams Building 2 - Wing C,D and Building 3 Wing E
  • TypeResidential / Group Housing
  • Location
    • Dunetha Main Road
    • Dunetha
    • Others
    • Daman
    • 396210
  • Pincode396210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49500000038
  • ReraGenie IDRG-MH-00439

Builder

  • NameSUNIL KESHAV DESAI
  • Entity typeIndividual
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

16 months past promisethis monthRegisteredAug 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed105 files

Current status

85%53 of 62 units booked

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Niketan Dreams Building 2 Wing C, DNA4342042
Niketan Dreams Building 3 Wing ENA4320020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Niketan Dreams Building 2 Wing C, D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Niketan Dreams Building 3 Wing E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered23
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
Niketan Dreams Building 2 Wing C, D011
Niketan Dreams Building 3 Wing E23023

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025

Approvals and building plan

Sanctioning authorityPlanning and Development Authority Daman
Permissible FSI5137.0
Proposed, not sanctioned5,137 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDeep Compex, Teen batti, Nani Daman, Daman

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAkandha Nayan Panchal
EngineerRajeshkumar Jagadishchandra Tandel
Chartered AccountantRajesh Katariya
Chartered AccountantKakakria and Associates LLP
PartnerRole in project
SUNIL KESHAV DESAI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 final signed.pdf30 Sep 2025
Form 1File: ND Frorm 1 Architect 31-12-2022.pdf10 Jul 2025
Form 2File: ND Frorm 2 Engineer 31-12-2022.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Architect Form 1.pdf10 Jul 2025
Form 2File: Engineer Form 2.pdf10 Jul 2025
Form 3File: form3 niketan.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1Niketan Dreams.pdf10 Jul 2025
Form 2File: FORM 2Niketan Dreams.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: Form 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Form 1File: ND Form-1 Architect 31-03-205.pdf10 Jul 2025
Form 2File: ND Form-2 Engineer 31-03-205.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: ND Form-1 Architect 31-03-205.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: ND Form-2 Engineer 31-03-205.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Report.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Report.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf20 Apr 2024
Other - FinanceFile: Sold-Unsold Disclosure.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf14 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Scanned.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1Niketan Dreams.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2Niketan Dreams.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Architect Form 1.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Engineer Form 2.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: form3 niketan.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: ND Frorm 1 Architect 31-12-2022 (1).pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: ND Frorm 2 Engineer 31-12-2022.pdf2 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf2 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: Form 3.pdf10 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details.pdf10 Aug 2022
CERSAI detailsFile: CERSAI report.pdf21 Jul 2022
Details of encumbrancesFile: No Encumbrance.pdf16 Jul 2022
PAN CardFile: PAN.pdf2 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
NIKETAN DREAMS BUILDING 1P49500000018NANI DAMAN, DamanApr 2019CompletedDec 2024May 2021

How this compares with Daman

85%of this project is bookeddistrict median 32%
18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is among them

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Niketan Dreams Building 2 - Wing C,D and Bui on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dunetha59 in Daman

2 kmNiketan Dreams Building Completed 1Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SUNIL KESHAV DESAI

SUNIL KESHAV DESAI has 3 registrations on MahaRERA, including NIKETAN DREAMS BUILDING 1 and Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What does it mean that Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E?

The registered promoter entity is SUNIL KESHAV DESAI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E?

The professionals named in the filing: Architect: Akandha Nayan Panchal; Engineer: Rajeshkumar Jagadishchandra Tandel; Chartered Accountant: Rajesh Katariya; Chartered Accountant: Kakakria and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Niketan Dreams Building 2 - Wing C,D and Building 3 Wing E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Niketan Dreams Building 2 - Wing C,D and Bui to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.