ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / NIDHAAN CINEPLAZA

Completed No litigation declared Commercial project

NIDHAAN CINEPLAZA

By M/S. NIDHAAN BUILDCON PRIVATE LIMITED

RG-MH-34482 · RERA P51800014315 · Last updated on MahaRERA portal: 24 Jun 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2018Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

NIDHAAN CINEPLAZA is a Commercial project by M/S. NIDHAAN BUILDCON PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014315 on 20 Nov 2017. The registration is recorded completed; possession was promised by 30 Sep 2018.

At a glance

Project

  • NameNIDHAAN CINEPLAZA
  • TypeCommercial
  • Location
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014315
  • ReraGenie IDRG-MH-34482

Builder

  • NameM/S. NIDHAAN BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRAHUL MOHANLAL SHAH, JAGAT VASANT SHAH, NEHAL MULCHAND SAVLA, NAVIN MURJI SHAH

Key dates

this monthRegisteredNov 2017PromisedSep 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Nov 2017
  • Promised completion30 Sep 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed20 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIDHAAN CINEPLAZANA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

NIDHAAN CINEPLAZA: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area680 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1612.69
Proposed, not sanctioned1,613 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMEZZANINE FLOOR, 70 - 80 M G ROAD, FORT, MUMBAI 400001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN S SUKUDE OF NASA ARCHITECTURAL CONSULTANTS PVT LTD
EngineerVIBHAKAR SHAH OF SHREEJI CONSULTANT
PartnerRole in project
M/S. NIDHAAN BUILDCON PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000904Sep 2018 → Sep 2019

Reason as filed by the promoterThat the construction of the project building viz, Nidhaan Cineplaza has been completed well within the proposed date of completion i.e 30/09/2018. However as stated in the Encumbrance certificate dt. 13/11/2017, part of the plinth area of the project building is common with the abutting wing viz. Nidhaan Clover ‘A’. That two columns of the abutting wing Nidhaan Clover ‘A’ (other phase) are required to be constructed from the common plinth area with the project building and therefore the Occupancy Certificate of the project building is pending issuance on account of the impending construction

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Nidhaan Cine Plaza Encumbrance Certificate.pdf24 Jun 2023
OtherFile: Nidhaan Cineplaza area certifying letter.pdf22 Dec 2020
Certificates of CA (Form 5)File: NB-C.PDF17 Oct 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Oct 2019
Certificates of CA (Form 5)File: Form 5.pdf11 Dec 2018
Details of encumbrancesFile: Encumbrances NCCP.pdf15 Jun 2018
Layout approvalFile: IOD.pdf16 Nov 2017
Copy of Layout Approval (in case of layout)File: IOD.pdf16 Nov 2017
Certificates of CA (Form 3)File: Form 3.PDF16 Nov 2017
Building plan approvalFile: IOD.pdf15 Nov 2017
PAN CardFile: NBPL PAN.pdf15 Nov 2017
Copy of the legal title reportFile: Title Certificate.pdf15 Nov 2017
Details of encumbrancesFile: encumbrance certificate.pdf15 Nov 2017
Building Plan Approval (IOD)File: IOD.pdf15 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Nov 2017
Declaration in FORM BFile: Title documents.pdf15 Nov 2017
Declaration in FORM BFile: Form B final.pdf15 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf15 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf15 Nov 2017
Proforma of Allotment letterFile: declaration for agreement.pdf15 Nov 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIDHAAN CINEPLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmNIDHAAN CINEPLAZACompleted 90Lapsed / revoked 57Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: M/S. NIDHAAN BUILDCON PRIVATE LIMITED

M/S. NIDHAAN BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including NIDHAAN CINEPLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NIDHAAN CINEPLAZA is delayed beyond 30 Sep 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIDHAAN CINEPLAZA?

The registered promoter entity is M/S. NIDHAAN BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIDHAAN CINEPLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIDHAAN CINEPLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIDHAAN CINEPLAZA?

The professionals named in the filing: Architect: SACHIN S SUKUDE OF NASA ARCHITECTURAL CONSULTANTS PVT LTD; Engineer: VIBHAKAR SHAH OF SHREEJI CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIDHAAN CINEPLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIDHAAN CINEPLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIDHAAN CINEPLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.