ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / NICE WORLD 2

Registered No litigation declared Residential / Group Housing project

NICE WORLD 2

By NICE BUILDERS

RG-MH-18568 · RERA P51700077433 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2034Possession promisedno revision filed
21 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 80%
29 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

NICE WORLD 2 is a Residential / Group Housing project by NICE BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700077433 on 16 Aug 2024. Possession is promised by 31 Dec 2034. 77 of the 106 units on this registration are recorded sold or booked, and 21 of 99 construction stages are filed complete.

At a glance

Project

  • NameNICE WORLD 2
  • TypeResidential / Group Housing
  • Location
    • SONKHAR
    • MUMBRA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077433
  • ReraGenie IDRG-MH-18568

Builder

  • NameNICE BUILDERS
  • Entity typePartnership
  • PartnersSHAMEEM ABDUL GANI KHAN, IRSHAD AHMED MUNIR KHAN, KAMAL AHMED SHAMSHUL HAQUE KHAN, NADEEM ALTAF AHMED SHAIKH, MOHAMMED HASAN MOHD YAQUB KHAN, MOHAMMAD ARIF MOHAMMAD HASAN KHAN, SAMEET NADEEM ALPRO, HABIB MOHAMMED UMAR KHAN, ABDUL SALAM MOHAMMED SAMI KHAN, MOHAMMED ZAHID ABDUL MAJEED MOTANI
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2024PromisedDec 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion31 Dec 2034
  • Revised completionNone
  • Buildings9 building records
  • Documents filed102 files

Current status

73%77 of 106 units booked
127.6%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 5NA7644044
BUILDING NO 6NA7644044
BUILDING NO 7NA3212012
BUNGALOW NO ANA33101
BUNGALOW NO BNA33101
BUNGALOW NO CNA33101
BUNGALOW NO DNA33101
BUNGALOW NO ENA33101
BUNGALOW NO FNA33101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 80%.

BUILDING NO 534%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 65%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO A38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO B38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO C38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO D38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO E38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO F38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed146

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots146
Closed/Covered140
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 552052
BUILDING NO 648048
BUILDING NO 734034
BUNGALOW NO A112
BUNGALOW NO B112
BUNGALOW NO C112
BUNGALOW NO D112
BUNGALOW NO E112
BUNGALOW NO F112

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,107 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI39937.44
Proposed, not sanctioned9,094 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURME PLAZA GROUND FLOOR OPP: MILLENNIUM HOSPITAL OLD MUMBAI PUNE ROAD KAUSA MUMBRA PIN 400612
Estimated costRs 25.99 cr
Cost incurredRs 33.16 cr
Work done127.59%
BuildingWingEstimatedIncurred
BUILDING NO 5NARs 4.53 crRs 5.78 cr
BUILDING NO 6NARs 4.53 crRs 5.78 cr
BUNGALOW NO ANARs 2.77 crRs 3.54 cr
BUNGALOW NO BNARs 2.77 crRs 3.54 cr
BUNGALOW NO CNARs 2.77 crRs 3.54 cr
BUNGALOW NO DNARs 2.77 crRs 3.54 cr
BUNGALOW NO ENARs 2.77 crRs 3.54 cr
BUNGALOW NO FNARs 2.77 crRs 3.54 cr
BUILDING NO 7NARs 28.97 lakhRs 36.96 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIGHT ANGLE
EngineerSS CONS
Chartered AccountantAS SUTERWALA & CO
Chartered AccountantSHABBAR & ASSOCIATES
Chartered AccountantBHURANI & ASSOCIATES
PartnerRole in project
NICE BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2034

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q4.pdf23 May 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q4.pdf23 May 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q4.pdf23 May 2026
Form 2A (FY 2024-2025)File: Quality Assurance FY 2024-25.pdf23 May 2026
Form 2A (FY 2025-2026)File: Quality Assurance Certificate FY 2025-26.pdf23 May 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q3.pdf13 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q3.pdf13 Mar 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q3.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q1.pdf14 Jan 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q2.pdf14 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q1.pdf14 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf14 Jan 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26-Q1.pdf14 Jan 2026
Withdrawal Update Form 3File: CA Certificate FY 25-26-Q2.pdf14 Jan 2026
Withdrawal Update Form 1File: Architect Certificate.pdf9 Jan 2026
Withdrawal Update Form 1File: Architect Certificate.pdf9 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q1.pdf9 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf9 Jan 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26-Q1.pdf9 Jan 2026
Withdrawal Update Form 3File: CA Certificate FY 25-26-Q2.pdf9 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Audit Report FY 2024-25.pdf17 Dec 2025
Form 1File: Architect Certificate.pdf17 Jun 2025
Form 2File: Engineer Certificate.pdf17 Jun 2025
Form 3File: CA Certificate.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf17 Jun 2025
Form 1File: Architect Certificate.pdf17 Jun 2025
Form 2File: Engineer Certificate.pdf17 Jun 2025
Form 3File: CA Certificate.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf17 Jun 2025
Form 1File: Architect Certificate.pdf17 Jun 2025
Form 2File: Engineer Certificate.pdf17 Jun 2025
Form 3File: CA Certificate.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q4.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory FY 24-25-Q4.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25-Q3.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q3.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q3.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory FY 24-25-Q3.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25-Q2.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q2.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit Declaration FY 17-18.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA Declaration FY 19-20.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Declaration FY 18-19.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Declaration FY 19-20.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Declaration FY 20-21.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Declaration FY 20-21.pdf28 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25-Q2.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit Declaration FY 21-22.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Declaration FY 21-22.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Declaration FY 22-23.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Declaration FY 22-23.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Declaration FY 23-24.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Declaration FY 23-24.pdf28 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Letter from bank.pdf13 Aug 2024
Other - TechnicalFile: Plan area highlight final.pdf12 Aug 2024
Other - TechnicalFile: Bank Declaration New Upload.pdf12 Aug 2024
Layout approvalFile: L-2.pdf27 Jul 2024
Building plan approvalFile: Bunglow Plan.pdf27 Jul 2024
PAN CardFile: Pan Card.pdf27 Jul 2024
Copy of Layout Approval (in case of layout)File: L-2.pdf27 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Bunglow Plan.pdf27 Jul 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf27 Jul 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf27 Jul 2024
Proforma of Allotment letterFile: Allotment Letter.pdf27 Jul 2024
Other - LegalFile: Agreement 1 - 1 to 36 Page Upload.pdf27 Jul 2024
Other - LegalFile: Agreement 1 - 37 to 71 Page Upload.pdf27 Jul 2024
Other - LegalFile: Agreement 2 - 1 to 38 Page Upload.pdf27 Jul 2024
Other - LegalFile: Agreement 2 - 39 to 78 Page Upload.pdf27 Jul 2024
Other - LegalFile: 7-12.pdf27 Jul 2024
Other - LegalFile: Area Declaration.pdf27 Jul 2024
Declaration in FORM BFile: Form B Declaration.pdf3 Jul 2024
Other - LegalFile: Partnership Deed.pdf3 Jul 2024
Other - TechnicalFile: Annexure A Declaration.pdf3 Jul 2024
Other - TechnicalFile: Agreement 1 - 1 to 36 Page Upload.pdf3 Jul 2024
Other - TechnicalFile: Agreement 1 - 37 to 71 Page Upload.pdf3 Jul 2024
Other - TechnicalFile: Agreement 2 - 1 to 38 Page Upload.pdf3 Jul 2024
Other - TechnicalFile: Agreement 2 - 39 to 78 Page Upload.pdf3 Jul 2024

How this compares with Thane

73%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NICE WORLD 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBRA7,600+ in Thane

2 kmNICE WORLD 2Completed 53Lapsed / revoked 29Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: NICE BUILDERS

NICE BUILDERS has 2 registrations on MahaRERA, including NICE WORLD 1 and NICE WORLD 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NICE WORLD 2 is delayed beyond 31 Dec 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NICE WORLD 2?

The registered promoter entity is NICE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NICE WORLD 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NICE WORLD 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NICE WORLD 2?

The professionals named in the filing: Architect: RIGHT ANGLE; Engineer: SS CONS; Chartered Accountant: AS SUTERWALA & CO; Chartered Accountant: SHABBAR & ASSOCIATES; Chartered Accountant: BHURANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NICE WORLD 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NICE WORLD 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NICE WORLD 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.