Nexus Westia
RG-MH-31968 · RERA P52100080184 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 15.00 crore secured on the land, in favour of ICICI Home Finance Company Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nexus Westia is a Others project by NEXUS PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100080184 on 6 May 2025. Possession is promised by 30 Jun 2027. 11 of the 83 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameNexus Westia
- TypeOthers
- Location
- Near Savta Mali Mandir Punawale Jambhe Road
- Punawale
- Mulshi
- Pune
- 411033
- Pincode411033
- RERA no.P52100080184
- ReraGenie IDRG-MH-31968
Builder
- NameNEXUS PROPERTIES
- Entity typePartnership
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 May 2025
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed64 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Nexus Westia | NA | 14 | 12 | 66 | 17 | 83 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 25%.
Nexus Westia: 11% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 25% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed202
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership58
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Shankar Baburao Darshale | Punawale | Pune |
| Prabhakar Shankar Darshale | Punawale | Pune |
| Vikram Shankar Darshale | Punawale | Pune |
| Navnath Sitaram Darshale | Punawale | Pune |
| Balasaheb Bajirao Darshale | Punawale | Pune |
| Suresh Ramchandra Darshale | Punawale | Pune |
| Pooja Anil Salunke | Kiwale | Pune |
| Sarika Vishal Mali | Chandkhed | Pune |
| Rohidas Bajirao Darshale | Punawale | Pune |
| Dipak Rajaram Darshale | Punawale | Pune |
| Dattatray Rajaram Darshale | Punawale | Pune |
| Chandrakant Nathu Darshale | Punawale | Pune |
| Rahul Chandrakant Darshale | Punawale | Pune |
| Mayur Chandrakant Darshale | Punawale | Pune |
| Rohan Suresh Darshale | Punawale | Pune |
| Roshan Suresh Darshale | Punawale | Pune |
| Ramchandra Nathu Darshale | Punawale | Pune |
| Nilesh Ramchandra Darshale | Punawale | Pune |
| Ajay Ramchandra Darshale | Punawale | Pune |
| Sachin Nivrutti Shinde | Chandkhed | Pune |
| Kusum Bajirao Darshale | Punawale | Pune |
| Ranjana Hiraman Jagtap | Punawale | Pune |
| Sangita Rohidas Darshale | Punawale | Pune |
| Prajakta Sachin Mate | Punawale | Pune |
| Chaya Balasaheb Darshale | Punawale | Pune |
| .Ankita Balasaheb Darshale | Punawale | Pune |
| Omkar Balasaheb Darshale | Punawale | Pune |
| Rajaram Baburao Darshale | Punawale | Pune |
| Subhadra Rajaram Darshale | Punawale | Pune |
| Manisha Deepak Darshale | Punawale | Pune |
| Meghnath Deepak Darshale | Punawale | Pune |
| Somanath Deepak Darshale | Punawale | Pune |
| Surekha Dattatrya Darshale | Punawale | Pune |
| Anuja Dattatrya Darshale | Punawale | Pune |
| Nanda Khandu Alhat | Punawale | Pune |
| Sunita Sanjay Raut | Punawale | Pune |
| Sitabai Shankar Darshale | Punawale | Pune |
| Vaishali Prabhakar Darshale | Punawale | Pune |
| Pratik Prabhakar Darshale | Punawale | Pune |
| Priyanka Prabhakar Darshale | Punawale | Pune |
| Pallavi Vikram Darshale | Punawale | Pune |
| Mangal Sunil Karne | Punawale | Pune |
| Ratnamala Ramchandra Jamdade | Punawale | Pune |
| Sitaram Baburao Darshale | Punawale | Pune |
| Kantabai Sitaram Darshale | Punawale | Pune |
| Prachi Navnath Darshale | Punawale | Pune |
| Surekha Gulab Bankar | Punawale | Pune |
| Akshay Surendra Pandhare | Punawale | Pune |
| Surendra Ramchandra Pandhare | Punawale | Pune |
| Jyoti Sanjay Kalamkar | Punawale | Pune |
| Manisha Manoj Fulvare | Punawale | Pune |
| Vidya Raju Bhujbal | Punawale | Pune |
| Reshma Ajit Mehtre | Punawale | Pune |
| Kisan Dashrath Darshale | Punawale | Pune |
| Arjun Dashrath Darshale | Punawale | Pune |
| Aarti Kashinath Darshale | Punawale | Pune |
| Prajwala Kashinath Darshale | Punawale | Pune |
| Prafulla Kashinath Darshale | Punawale | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Nexus Westia | NA | Rs 20.27 cr | Rs 23.61 lakh |
| - | NA | Rs 98.09 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kimaya Associates |
| Engineer | Ajinkya A Lahigude |
| Engineer | Nexus Properties |
| Chartered Accountant | M A Bagwan and Associates Chartered Accountants |
| Chartered Accountant | MS. S.S. Bora & C0 |
| Partner | Role in project |
|---|---|
| NEXUS PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: 1-6.pdf | 12 Jun 2026 |
| Building plan approvalFile: 2-6.pdf | 12 Jun 2026 |
| Building plan approvalFile: 3-6.pdf | 12 Jun 2026 |
| Building plan approvalFile: 4-6.pdf | 12 Jun 2026 |
| Building plan approvalFile: 5-6.pdf | 12 Jun 2026 |
| Building plan approvalFile: 6-6.pdf | 12 Jun 2026 |
| Form 2A (FY 2025-2026)File: 2A.pdf | 7 May 2026 |
| Form 5 (FY 2025-2026)File: Nexus Westia Form 5.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: F1.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: F2.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: F3.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: 3) Architect Certificate - Form - 1 Date - 01-10-2025 (SEP 2025).pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: 4) Architect Certificate - Form - 1 Date.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: 3) Engineer Certificate - Form 2 Date 30-09-2025.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: 4) Engineer Certificate - Form 2 Date.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: 4 CA Certificate Form - 3 Date_compressed.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: 5 CA Certificate Form - 3 Date_compressed.pdf | 11 Feb 2026 |
| Form 1File: 2) Architect Certificate - Form - 1 Date - 10-06-2025 (JUNE 2025).pdf | 20 Sep 2025 |
| Form 2File: 2) Engineer Certificate - Form 2 Date 30-06-2025.pdf | 20 Sep 2025 |
| Form 3File: CA Certificate Form - 3 Date 28-08-2025 (JUNE 25) ( Q1)_.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 SOLD UNSOLD NEXUS PROPERTIES (1-4-2025 to 30-06-2025) Q1.pdf | 20 Sep 2025 |
| Other - FinanceFile: NO SALE DECLARATION.pdf | 25 Apr 2025 |
| Copy of the legal title reportFile: ilovepdf_merged.pdf | 22 Apr 2025 |
| Copy of the legal title reportFile: NEXUS WESTIA - SEARCH REPORT-10-13.pdf | 22 Apr 2025 |
| Copy of the legal title reportFile: NEXUS WESTIA - SEARCH REPORT-7-9.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA.pdf | 18 Apr 2025 |
| Other - FinanceFile: Clarification Letter - Land Cost.pdf | 18 Apr 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - NEW.pdf | 24 Mar 2025 |
| Other - LegalFile: Clarification Regarding Co- Promoters Details In The Registration Application.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Annexture A (Order 50-2024).pdf | 24 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letter - Format B - 13 03 25.pdf | 13 Mar 2025 |
| Other - TechnicalFile: Annexture A One pot one registration.pdf | 14 Feb 2025 |
| Other - FinanceFile: DECLARARTION - SANCTION AND UNSANCTION UNITS.pdf | 12 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal Finance UPDATE_merged.pdf | 10 Feb 2025 |
| Declaration in FORM BFile: Nexus Properties Form B.pdf | 10 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC PCMC 27 12 2024 updated.pdf | 10 Feb 2025 |
| Declaration about Commencement CertificateFile: Declaration - About Commencement Certificate - Format D UPDATED.pdf | 10 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal Finance UPDATE_merged.pdf | 10 Feb 2025 |
| Proforma of Agreement for saleFile: AFS - upload ready.pdf | 10 Feb 2025 |
| CERSAI detailsFile: Declaration - No Security Interest Related With Project.pdf | 8 Feb 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200339172228.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 4 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: DEVIATION AL - upload ready.pdf | 4 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION AFS - upload ready.pdf | 4 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure For Secured - Unsecured Finance Availed For Project.pdf | 4 Feb 2025 |
| Layout approvalFile: 1.pdf | 8 Jan 2025 |
| Building plan approvalFile: 2.pdf | 8 Jan 2025 |
| Building plan approvalFile: 3.pdf | 8 Jan 2025 |
| Building plan approvalFile: 4.pdf | 8 Jan 2025 |
| Building plan approvalFile: 5.pdf | 8 Jan 2025 |
| PAN CardFile: NEXUS PROPERTIES - PAN CARD.pdf | 8 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 8 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 8 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 8 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 8 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Satishkumar Patel Annexure A.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Nareshkumar Patel Annexure A.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jigneshkumar Makani Annexure A.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Kaushalkumar Patel Annexure A.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Satish Sonawane Annexure A.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Hanumant Gaikwad Annexure A.pdf | 8 Jan 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Nexus Westia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Punawale13,700+ in Pune
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: NEXUS PROPERTIES
Nexus Properties has 2 registrations on MahaRERA, including ULTRA RESIDENCY and Nexus Westia. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Nexus Westia is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nexus Westia?
The registered promoter entity is NEXUS PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nexus Westia?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nexus Westia?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nexus Westia?
The professionals named in the filing: Architect: Kimaya Associates; Engineer: Ajinkya A Lahigude; Engineer: Nexus Properties; Chartered Accountant: M A Bagwan and Associates Chartered Accountants; Chartered Accountant: MS. S.S. Bora & C0. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nexus Westia?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback