Home / Browse projects / Thane, Maharashtra / NEXUS PARK

Registered No litigation declared Residential / Group Housing project

NEXUS PARK

By NEXUS GROUP

RG-MH-28748 · RERA P51700027450 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
17 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 90%
130 of 274Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

NEXUS PARK is a Residential / Group Housing project by NEXUS GROUP in Thane, Maharashtra, registered with MahaRERA as P51700027450 on 10 Dec 2020. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 144 of the 274 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete.

At a glance

Project

  • NameNEXUS PARK
  • TypeResidential / Group Housing
  • Location
    • Diva Shil Road
    • Shilphata
    • Village Dawale
    • Dahisar
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700027450
  • ReraGenie IDRG-MH-28748

Builder

  • NameNEXUS GROUP
  • Entity typePartnership
  • PartnersSHRIGANESH WAMAN PATIL, KAILASH BHARAT BHAGAT, ATEEQUE AHMED BABULLAH SHAIKH, GANESH GAURU TAWRE
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2020First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Dec 2020
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings3 building records
  • Documents filed89 files

Current status

53%144 of 274 units booked
42.4%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEXUS PARK ANA272212213135
NEXUS PARK BNA24191110111
NEXUS PARK CNA12728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 90%.

NEXUS PARK A74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)40%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
NEXUS PARK B51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)40%
Plinth100%
Stilt Floor90%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NEXUS PARK C95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)40%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes15%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes15%
Water conservation /Rain water harvestingYes15%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20
BuildingClosed/CoveredTotal
NEXUS PARK A44
NEXUS PARK B99
NEXUS PARK C77

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,838 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Mar 2026
LandownerVillageDistrict
PANDHARINATH SITARAM PATILThane (M Corp.)Thane
HIRAMAN GAJANAN PATILThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI4904.61
Proposed, not sanctioned4,905 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDIVA DISTRICT THANE
Estimated costRs 49.27 cr
Cost incurredRs 20.87 cr
Work done42.37%
BuildingWingEstimatedIncurred
NEXUS PARK ANARs 22.80 crRs 12.90 cr
NEXUS PARK BNARs 18.39 crRs 5.52 cr
-NARs 5.62 cr-
NEXUS PARK CNARs 2.46 crRs 2.46 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER S LOTKE & ASSOCIATES
EngineerSSCONS CONSULTING STRUCTURAL ENGINEERS
EngineerPawar Pravin Yashavant
Chartered AccountantVIKAS N GUNJAL & ASSOCIATES
Chartered AccountantSHAIKH AND ASSOCIATES
Chartered AccountantCHOUDHARI & ASSOCIATES
PartnerRole in project
NEXUS GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23032620330Jun 2026 → Jun 2027

Reason as filed by the promoterDear Sir/Ma’am, We, Nexus Group, hereby declare the following with respect to the project “Nexus Park” bearing registration number P51700027450 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 90% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the Pending RCC Work, finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM-5 NEXUS GROUP MARCH-2026.pdf8 Jun 2026
Withdrawal Update Form 1File: FORM-1 NEXUS GROUP MARCH-2026.pdf7 Jun 2026
Withdrawal Update Form 2File: FORM-2-NEXUS GROUP MARCH-2026.pdf7 Jun 2026
Withdrawal Update Form 3File: FORM 3 - NEXUS PARK - MARCH-26 SIGNED_compressed.pdf7 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf10 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf10 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf10 Apr 2026
Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf10 Apr 2026
Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf10 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf10 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf10 Apr 2026
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf10 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf22 Mar 2026
Withdrawal Update Form 1File: FORM 1 -ARCHITECT CERTIFICATE UPTO 31032024.pdf18 Mar 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEER CERTIFICATE - 31032024.pdf18 Mar 2026
Withdrawal Update Form 3File: Form 3 new.pdf18 Mar 2026
Form 1File: FORM-1-NEXUS-310325.pdf2 Mar 2026
Form 2File: FORM-2-NEXUS-310325.pdf2 Mar 2026
Form 3File: FORM-3-NEXUS-310325.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2025.pdf2 Mar 2026
Form 1File: FORM- 1-NEXUS-30-06-2025.pdf2 Mar 2026
Form 2File: FORM 2-Nexus-30-06-2025.pdf2 Mar 2026
Form 3File: FORM-3-NEXUS-30-06-2025.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30062025.pdf2 Mar 2026
Form 1File: FORM-1-NEXUS-30-09-2025.pdf2 Mar 2026
Form 2File: FORM 2-Nexus-30-09-2025.pdf2 Mar 2026
Form 3File: FORM-3-NEXUS-SEPT-25.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30092025.pdf2 Mar 2026
Form 1File: FORM-1-NEXUS-31-12-2025.pdf2 Mar 2026
Form 2File: FORM 2-Nexus-31-12-2025.pdf2 Mar 2026
Form 3File: FORM-3-NEXUS-31-12-2025.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 311225.pdf2 Mar 2026
Form 5 (FY 2021-2022)File: FORM 5- Nexus Group_FYR 21-22.pdf2 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 -CA CERTIFICATE -Nexus Park - 2022-23.pdf2 Mar 2026
Form 5 (FY 2023-2024)File: FORM 5 - ANNUAL REPORT - 31032024.pdf2 Mar 2026
Form 5 (FY 2024-2025)File: NEXUS FORM-5.pdf2 Mar 2026
Layout approvalFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf19 Mar 2025
Layout approvalFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf19 Mar 2025
Building plan approvalFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf19 Mar 2025
Building plan approvalFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf19 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT AND BUILDING PLANS - DEC-22.pdf19 Mar 2025
Copy of Layout Approval (in case of layout)File: LAYOUT AND BUILDING PLANS - FEB -2025.pdf19 Mar 2025
Proforma of Allotment letterFile: Allotment[1].pdf19 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC -DEC-2022.pdf19 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Cert_RB_468156_407pdSxeSign-CC-FEB-2025.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf19 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf19 Mar 2025
Proforma of Agreement for saleFile: RERA_SALE_DRAFT_AGREEMENT_-NEW[1].pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Nexus Group Sept-24.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-NeXus Park-Dec-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Nexus Group Sept-24_compressed.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -NEXUS PARK- DEC-24 -13-02-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Nexus Group Sept-24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-NeXus Park-Dec-24.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -ARCHITECT CERTIFICATE UPTO 31032024.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER CERTIFICATE - 31032024.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - 31032024.pdf27 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - ANNUAL REPORT - 31032024.pdf27 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -CA CERTIFICATE -Nexus Park - 2022-23.pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECTS CERTIFICATE - 30-09-2023.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Cert -Nexus Park - 30092023.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -CA CERTIFICATE - 30092023_compressed.pdf10 Nov 2023
Proforma of Agreement for saleFile: SALE DRAFT AGREEMENT.pdf6 Jun 2023
Proforma of Allotment letterFile: Final Allotment Letter Draft.pdf6 Jun 2023
Foreclosure of the ProjectFile: SALE DRAFT AGREEMENT.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nexus Park - 31122022.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NEXUS PARK -31122022.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NEXUS PARK -31122022.pdf6 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NEXUS PARK - 31122022.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- Nexus Group_FYR 21-22.pdf6 Apr 2023
Declaration about Commencement CertificateFile: declaration about CC.pdf5 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: disclousre of sold unsold.pdf5 Jan 2022
CERSAI detailsFile: CERSAI REPORT NEXUS.pdf5 Jan 2022
Layout approvalFile: layout plan compressed.pdf23 Dec 2021
Copy of Layout Approval (in case of layout)File: layout plan compressed.pdf23 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencment certificate compressed.pdf23 Dec 2021
Copy of the legal title reportFile: Title Report-NEXUS GROUP_compressed.pdf8 Dec 2020
Layout approvalFile: Nexus-approved plan copy.pdf26 Nov 2020
Building plan approvalFile: Nexus-Building plan approve copy.pdf26 Nov 2020

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEXUS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Dawale7,600+ in Thane

2 kmNEXUS PARKCompleted 20Lapsed / revoked 3Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: NEXUS GROUP

NEXUS GROUP has 2 registrations on MahaRERA, including NEXUS PARK and Villa Varniraj. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NEXUS PARK is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEXUS PARK?

The registered promoter entity is NEXUS GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEXUS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEXUS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEXUS PARK?

The professionals named in the filing: Architect: SAMEER S LOTKE & ASSOCIATES; Engineer: SSCONS CONSULTING STRUCTURAL ENGINEERS; Engineer: Pawar Pravin Yashavant; Chartered Accountant: VIKAS N GUNJAL & ASSOCIATES; Chartered Accountant: SHAIKH AND ASSOCIATES; Chartered Accountant: CHOUDHARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEXUS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEXUS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEXUS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.