NEXUS PARK
By NEXUS GROUP
RG-MH-28748 · RERA P51700027450 · Last updated on MahaRERA portal: 8 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEXUS PARK is a Residential / Group Housing project by NEXUS GROUP in Thane, Maharashtra, registered with MahaRERA as P51700027450 on 10 Dec 2020. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 144 of the 274 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete.
At a glance
Project
- NameNEXUS PARK
- TypeResidential / Group Housing
- Location
- Diva Shil Road
- Shilphata
- Village Dawale
- Dahisar
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700027450
- ReraGenie IDRG-MH-28748
Builder
- NameNEXUS GROUP
- Entity typePartnership
- PartnersSHRIGANESH WAMAN PATIL, KAILASH BHARAT BHAGAT, ATEEQUE AHMED BABULLAH SHAIKH, GANESH GAURU TAWRE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Dec 2020
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
- Buildings3 building records
- Documents filed89 files
Current status
Figures as on 8 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEXUS PARK A | NA | 27 | 22 | 122 | 13 | 135 |
| NEXUS PARK B | NA | 24 | 19 | 111 | 0 | 111 |
| NEXUS PARK C | NA | 12 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 90%.
NEXUS PARK A74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 40% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
NEXUS PARK B51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 40% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NEXUS PARK C95%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 40% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | Yes | 15% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 75% |
| Solid Waste Management And Disposal | Yes | 15% |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 15% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| NEXUS PARK A | 4 | 4 |
| NEXUS PARK B | 9 | 9 |
| NEXUS PARK C | 7 | 7 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PANDHARINATH SITARAM PATIL | Thane (M Corp.) | Thane |
| HIRAMAN GAJANAN PATIL | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NEXUS PARK A | NA | Rs 22.80 cr | Rs 12.90 cr |
| NEXUS PARK B | NA | Rs 18.39 cr | Rs 5.52 cr |
| - | NA | Rs 5.62 cr | - |
| NEXUS PARK C | NA | Rs 2.46 cr | Rs 2.46 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER S LOTKE & ASSOCIATES |
| Engineer | SSCONS CONSULTING STRUCTURAL ENGINEERS |
| Engineer | Pawar Pravin Yashavant |
| Chartered Accountant | VIKAS N GUNJAL & ASSOCIATES |
| Chartered Accountant | SHAIKH AND ASSOCIATES |
| Chartered Accountant | CHOUDHARI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| NEXUS GROUP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir/Ma’am, We, Nexus Group, hereby declare the following with respect to the project “Nexus Park” bearing registration number P51700027450 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 90% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the Pending RCC Work, finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: FORM-5 NEXUS GROUP MARCH-2026.pdf | 8 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 NEXUS GROUP MARCH-2026.pdf | 7 Jun 2026 |
| Withdrawal Update Form 2File: FORM-2-NEXUS GROUP MARCH-2026.pdf | 7 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - NEXUS PARK - MARCH-26 SIGNED_compressed.pdf | 7 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 10 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026.pdf | 10 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026.pdf | 10 Apr 2026 |
| Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf | 10 Apr 2026 |
| Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf | 10 Apr 2026 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 10 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 10 Apr 2026 |
| Form 5 (FY 2020-2021)File: Form 5 20-21.pdf | 10 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 22 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 -ARCHITECT CERTIFICATE UPTO 31032024.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 - ENGINEER CERTIFICATE - 31032024.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 new.pdf | 18 Mar 2026 |
| Form 1File: FORM-1-NEXUS-310325.pdf | 2 Mar 2026 |
| Form 2File: FORM-2-NEXUS-310325.pdf | 2 Mar 2026 |
| Form 3File: FORM-3-NEXUS-310325.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2025.pdf | 2 Mar 2026 |
| Form 1File: FORM- 1-NEXUS-30-06-2025.pdf | 2 Mar 2026 |
| Form 2File: FORM 2-Nexus-30-06-2025.pdf | 2 Mar 2026 |
| Form 3File: FORM-3-NEXUS-30-06-2025.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30062025.pdf | 2 Mar 2026 |
| Form 1File: FORM-1-NEXUS-30-09-2025.pdf | 2 Mar 2026 |
| Form 2File: FORM 2-Nexus-30-09-2025.pdf | 2 Mar 2026 |
| Form 3File: FORM-3-NEXUS-SEPT-25.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30092025.pdf | 2 Mar 2026 |
| Form 1File: FORM-1-NEXUS-31-12-2025.pdf | 2 Mar 2026 |
| Form 2File: FORM 2-Nexus-31-12-2025.pdf | 2 Mar 2026 |
| Form 3File: FORM-3-NEXUS-31-12-2025.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 311225.pdf | 2 Mar 2026 |
| Form 5 (FY 2021-2022)File: FORM 5- Nexus Group_FYR 21-22.pdf | 2 Mar 2026 |
| Form 5 (FY 2022-2023)File: Form 5 -CA CERTIFICATE -Nexus Park - 2022-23.pdf | 2 Mar 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 - ANNUAL REPORT - 31032024.pdf | 2 Mar 2026 |
| Form 5 (FY 2024-2025)File: NEXUS FORM-5.pdf | 2 Mar 2026 |
| Layout approvalFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf | 19 Mar 2025 |
| Layout approvalFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf | 19 Mar 2025 |
| Building plan approvalFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf | 19 Mar 2025 |
| Building plan approvalFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf | 19 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: LAYOUT AND BUILDING PLANS - DEC-22.pdf | 19 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: LAYOUT AND BUILDING PLANS - FEB -2025.pdf | 19 Mar 2025 |
| Proforma of Allotment letterFile: Allotment[1].pdf | 19 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC -DEC-2022.pdf | 19 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert_RB_468156_407pdSxeSign-CC-FEB-2025.pdf | 19 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT AND BUILDING PLANS - DEC-22.pdf | 19 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT AND BUILDING PLANS - FEB -2025.pdf | 19 Mar 2025 |
| Proforma of Agreement for saleFile: RERA_SALE_DRAFT_AGREEMENT_-NEW[1].pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Nexus Group Sept-24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-NeXus Park-Dec-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Nexus Group Sept-24_compressed.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -NEXUS PARK- DEC-24 -13-02-25.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Nexus Group Sept-24.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-NeXus Park-Dec-24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -ARCHITECT CERTIFICATE UPTO 31032024.pdf | 27 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER CERTIFICATE - 31032024.pdf | 27 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - 31032024.pdf | 27 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - ANNUAL REPORT - 31032024.pdf | 27 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -CA CERTIFICATE -Nexus Park - 2022-23.pdf | 11 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECTS CERTIFICATE - 30-09-2023.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Cert -Nexus Park - 30092023.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -CA CERTIFICATE - 30092023_compressed.pdf | 10 Nov 2023 |
| Proforma of Agreement for saleFile: SALE DRAFT AGREEMENT.pdf | 6 Jun 2023 |
| Proforma of Allotment letterFile: Final Allotment Letter Draft.pdf | 6 Jun 2023 |
| Foreclosure of the ProjectFile: SALE DRAFT AGREEMENT.pdf | 6 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nexus Park - 31122022.pdf | 7 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NEXUS PARK -31122022.pdf | 6 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NEXUS PARK -31122022.pdf | 6 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NEXUS PARK - 31122022.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- Nexus Group_FYR 21-22.pdf | 6 Apr 2023 |
| Declaration about Commencement CertificateFile: declaration about CC.pdf | 5 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a.pdf | 5 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: disclousre of sold unsold.pdf | 5 Jan 2022 |
| CERSAI detailsFile: CERSAI REPORT NEXUS.pdf | 5 Jan 2022 |
| Layout approvalFile: layout plan compressed.pdf | 23 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: layout plan compressed.pdf | 23 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencment certificate compressed.pdf | 23 Dec 2021 |
| Copy of the legal title reportFile: Title Report-NEXUS GROUP_compressed.pdf | 8 Dec 2020 |
| Layout approvalFile: Nexus-approved plan copy.pdf | 26 Nov 2020 |
| Building plan approvalFile: Nexus-Building plan approve copy.pdf | 26 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEXUS PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Dawale7,600+ in Thane
Filed coordinates, straight-line distance. 39 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: NEXUS GROUP
NEXUS GROUP has 2 registrations on MahaRERA, including NEXUS PARK and Villa Varniraj. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NEXUS PARK is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEXUS PARK?
The registered promoter entity is NEXUS GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEXUS PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEXUS PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEXUS PARK?
The professionals named in the filing: Architect: SAMEER S LOTKE & ASSOCIATES; Engineer: SSCONS CONSULTING STRUCTURAL ENGINEERS; Engineer: Pawar Pravin Yashavant; Chartered Accountant: VIKAS N GUNJAL & ASSOCIATES; Chartered Accountant: SHAIKH AND ASSOCIATES; Chartered Accountant: CHOUDHARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEXUS PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback