Home / Browse projects / Pune, Maharashtra / NEWTON HOMES TATHAWADE PHASE II

Registered No litigation declared Residential / Group Housing project

NEWTON HOMES TATHAWADE PHASE II

By Ravima Developer

RG-MH-86390 · RERA P52100052803 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Encumbrance declared on the project land

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
13 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
68 of 146Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

NEWTON HOMES TATHAWADE PHASE II is a Residential / Group Housing project by Ravima Developer in Pune, Maharashtra, registered with MahaRERA as P52100052803 on 5 Oct 2023. Possession is promised by 30 Dec 2028. 78 of the 146 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NameNEWTON HOMES TATHAWADE PHASE II
  • TypeResidential / Group Housing
  • Location
    • Pune Mumbai Road
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100052803
  • ReraGenie IDRG-MH-86390

Builder

  • NameRavima Developer
  • Entity typePartnership
  • GSTIN27AASFR5116L1ZN
  • PartnerSarvesh Ravindra Gadiya
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Current status

53%78 of 146 units booked
57.9%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WingNA141295095
A WingNA9751051

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

B Wing70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A Wing61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
Realtyworld InfraconBhamboliPune
Realityworld InfraconBhamboliPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI20432.1
Proposed, not sanctioned13,350 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShankarseth Road Pune
Estimated costRs 52.11 cr
Cost incurredRs 30.16 cr
Work done57.87%
BuildingWingEstimatedIncurred
A WingNARs 24.09 crRs 13.60 cr
B WingNARs 22.70 crRs 13.60 cr
-NARs 5.32 crRs 2.96 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerSanjay Seth
EngineerRajendra Patil
Chartered AccountantChandorkar and Limaye
Chartered AccountantA R Baheti And Associates
Chartered AccountantA R Baheti and Co.
PartnerRole in project
Ravima Developer-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: A.pdf14 Jul 2026
Building plan approvalFile: A1.pdf14 Jul 2026
Layout approvalFile: Layout.pdf14 Jul 2026
Commencement certificateFile: CC.pdf14 Jul 2026
Building plan approvalFile: B.pdf14 Jul 2026
Building plan approvalFile: B1.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 Q4 2025-26.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 2025-26.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 2025-26.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 2025-26.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3 2025-26.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3 2025-26.pdf15 Jan 2026
Layout approvalFile: Layout.pdf30 Oct 2025
Building plan approvalFile: A.pdf30 Oct 2025
Building plan approvalFile: B.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Q2 2025-26.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2 2025-26.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2 2025-26.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 Q1.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf5 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf5 Aug 2025
Withdrawal Update Form 1File: Form 1 Q1.pdf2 Aug 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf2 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2024-25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2024-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2024-25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2024-25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Q4 2024-25.pdf19 Apr 2025
Layout approvalFile: Layout.pdf25 Mar 2025
Building plan approvalFile: A Wing.pdf25 Mar 2025
Building plan approvalFile: A Wing 1.pdf25 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf25 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: A Wing.pdf25 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: A Wing 1.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3-2024-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-2024-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase II-Q3 24-25.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Q3-2024-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase II-Q2 24-25.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Form 2A- Phase II-2023-24.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2024-25.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase II-Q1 24-25.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Q1 2024-25.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2024-25.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 2023-24.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2023-24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Q4 2023-24.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2023-24.pdf18 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 Q4 2023-24.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3- NHT.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3-NHT 2.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Q3-NHT 2.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-NHT 2.pdf17 Jan 2024
Layout approvalFile: Layout.pdf7 Oct 2023
Building plan approvalFile: A Wing.pdf7 Oct 2023
Building plan approvalFile: B Wing.pdf7 Oct 2023
Building plan approvalFile: B Wing 1.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: A Wing.pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: B Wing.pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: B Wing 1.pdf7 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Oct 2023
Other - TechnicalFile: Plinth Certificate.pdf26 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: PCMC Confirmation for CC.pdf25 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate.pdf25 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA.pdf25 Sep 2023
CERSAI detailsFile: CERSAI.pdf14 Sep 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf8 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Devation 1.pdf8 Sep 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Newton Homes Hadapsar Phase IIBehind Marvel Bounty Malwadi Hadapsar1CompletedApr 2024Sep 2022
THE WORK CLUB PHASE INear Finolex Chauk Pimpri Pune1CompletedApr 2023Oct 2022
NEWTON HOMES HADAPSAR PHAS E IBehind Marvel Bounty Malwadi Hadapsar1CompletedApr 2023Mar 2022
Greenaria Building BBehind Magarpatta Hadapsar1CompletedOct 2022Mar 2022

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEWTON HOMES TATHAWADE PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathawade13,700+ in Pune

Builder: Ravima Developer

Ravima Developer has 7 registrations on MahaRERA, including THE WORK CLUB PHASE I and THE WORK CLUB PHASE II. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NEWTON HOMES TATHAWADE PHASE II is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEWTON HOMES TATHAWADE PHASE II?

The registered promoter entity is Ravima Developer, a partnership as per the filing. Its GSTIN 27AASFR5116L1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEWTON HOMES TATHAWADE PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEWTON HOMES TATHAWADE PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEWTON HOMES TATHAWADE PHASE II?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Sanjay Seth; Engineer: Rajendra Patil; Chartered Accountant: Chandorkar and Limaye; Chartered Accountant: A R Baheti And Associates; Chartered Accountant: A R Baheti and Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEWTON HOMES TATHAWADE PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEWTON HOMES TATHAWADE PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEWTON HOMES TATHAWADE PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.