Home / Browse projects / Thane, Maharashtra / New Suyash CHS
New Suyash CHS
By Ganesh Chandrakant Malvankar
RG-MH-80434 · RERA P51700052617 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
New Suyash CHS is a Residential / Group Housing project by Ganesh Chandrakant Malvankar in Thane, Maharashtra, registered with MahaRERA as P51700052617 on 11 Sep 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 18 months from the original filing. 13 of the 43 units on this registration are recorded sold or booked, and 6 of 9 construction stages are filed complete.
At a glance
Project
- NameNew Suyash CHS
- TypeResidential / Group Housing
- Location
- M G Road
- Naupada
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700052617
- ReraGenie IDRG-MH-80434
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Sep 2023
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed105 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| New Suyash CHS | NA | 9 | 8 | 43 | 0 | 43 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 9 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
New Suyash CHS: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| New Suyash Co-operative Housing Society Limited | Thane (M Corp.) | Thane |
| Madhav Dattatraya Johari | Thane (M Corp.) | Thane |
| Shrinivas Dattatraya Johari | Thane (M Corp.) | Thane |
| Smita Ravi Patil | - | Belgaum |
| Hema Suresh Johari | - | Belgaum |
| Madhuri Arun Shejwalker | Thane (M Corp.) | Thane |
| Vidya Santosh Deshpande | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| New Suyash CHS | NA | Rs 6.04 cr | Rs 5.19 cr |
| - | NA | Rs 67.08 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DA ARCH TECH LLP |
| Engineer | Brixwell Engineering |
| Engineer | Vishal Raghwani |
| Chartered Accountant | VUDN & Associates LLP |
| Chartered Accountant | Jainam Doshi & Associates |
| Chartered Accountant | M N T AND ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| Ganesh Chandrakant Malvankar | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir/Ma’am, I, Ganesh Chandrakant Malvankar, hereby declare the following with respect to the project “New Suyash CHS” bearing registration number P51700052617 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for t
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed105
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 24 Apr 2026 |
| Layout approvalFile: Plans-1.pdf | 20 Mar 2026 |
| Building plan approvalFile: Plans-1.pdf | 20 Mar 2026 |
| Building plan approvalFile: Plans-2.pdf | 20 Mar 2026 |
| Building plan approvalFile: Plans-3.pdf | 20 Mar 2026 |
| Building plan approvalFile: Plans-4.pdf | 20 Mar 2026 |
| Building plan approvalFile: Plans-5.pdf | 20 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 December 2025.pdf | 20 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 December 2025.pdf | 20 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 December 2025.pdf | 20 Mar 2026 |
| Form 1File: Form 1 September 2023.pdf | 11 Mar 2026 |
| Form 2File: Form 2 September 2023.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash September 2023.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2023.pdf | 11 Mar 2026 |
| Form 1File: Form 1 December 2023.pdf | 11 Mar 2026 |
| Form 2File: Form 2 December 2023.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash Dec 2023.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2023.pdf | 11 Mar 2026 |
| Form 1File: Form 1 March 2024.pdf | 11 Mar 2026 |
| Form 2File: Form 2 March 2024.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash Mar 2024.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2024.pdf | 11 Mar 2026 |
| Form 1File: Form 1 June 2024.pdf | 11 Mar 2026 |
| Form 2File: Form 2 June 2024.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash June 2024.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2024.pdf | 11 Mar 2026 |
| Form 1File: Form 1 September 2024.pdf | 11 Mar 2026 |
| Form 2File: Form 2 September 2024.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash Sept 2024.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2024.pdf | 11 Mar 2026 |
| Form 1File: Form 1 December 2024.pdf | 11 Mar 2026 |
| Form 2File: Form 2 December 2024.pdf | 11 Mar 2026 |
| Form 3File: Form 3_New Suyash Dec 2024.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2024.pdf | 11 Mar 2026 |
| Form 1File: Form 1 March 2025.pdf | 11 Mar 2026 |
| Form 2File: Form 2 March 2025.pdf | 11 Mar 2026 |
| Form 3File: Form 3 March 2025.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 June 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 September 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 December 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 June 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 June 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 September 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 December 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 June 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: CA Certificate_merged.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 September 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 December 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 June 2025.pdf | 11 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf | 11 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 11 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5_FY2023-24_Yogi Creation.pdf | 11 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5_FY2024-25_Yogi Creation.pdf | 11 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MArch 2024.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 September 2024.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2024.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2023.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_New Suyash Dec 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_New Suyash Sept 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_New Suyash June 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_New Suyash Mar 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_New Suyash Dec 2023.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 December 2023.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 December 2024.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 27 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A 23-4.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Yogi.pdf | 27 Feb 2025 |
| Other - TechnicalFile: Format D.pdf | 16 Aug 2023 |
| Other - LegalFile: DIN.pdf | 11 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf | 10 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf | 10 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf | 10 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf | 10 Aug 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Broadway Annex | 89B Tika no 22 Gokale Road Naupada Thane 400601 | 12 | Completed | Jun 2024 | Jun 2023 |
| Anusaya CHS | opp mangla high sachdeo thane east | 23 | Completed | Mar 2023 | Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 105 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep New Suyash CHS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Naupada7,600+ in Thane
Filed coordinates, straight-line distance. 282 registered projects within 2 km.
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: Ganesh Chandrakant Malvankar
Ganesh Chandrakant Malvankar has 3 registrations on MahaRERA, including Anusaya CHS and Broadway Annex. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if New Suyash CHS is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of New Suyash CHS?
The registered promoter entity is Ganesh Chandrakant Malvankar, an individual as per the filing. Its GSTIN 27AKLPM7499J1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in New Suyash CHS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for New Suyash CHS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at New Suyash CHS?
The professionals named in the filing: Architect: DA ARCH TECH LLP; Engineer: Brixwell Engineering; Engineer: Vishal Raghwani; Chartered Accountant: VUDN & Associates LLP; Chartered Accountant: Jainam Doshi & Associates; Chartered Accountant: M N T AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in New Suyash CHS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback