Home / Browse projects / Mumbai Suburban, Maharashtra / NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD
NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD
By DIMPLE REALTORS PRIVATE LIMITED
RG-MH-07369 · RERA P51800054642 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 20.00 crore secured on the land, in favour of Aditya Birla Finance limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD is a Others project by DIMPLE REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054642 on 2 Feb 2024. Possession is promised by 31 Dec 2026. 15 of the 55 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameNEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD
- TypeOthers
- Location
- AT JUNCTION OF IC COLONY ROAD NO. 5 & 6
- BORIVALI (WEST)
- Eksar
- Borivali
- Mumbai Suburban
- 400103
- Pincode400103
- RERA no.P51800054642
- ReraGenie IDRG-MH-07369
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD | NA | 16 | 12 | 44 | 11 | 55 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD: 93% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed69
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD | NA | Rs 15 | Rs 15 |
| - | NA | Rs 5 | Rs 5 |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YMS Consultants Limited YOMESH |
| Engineer | Mr. Ganesh Vazirkar |
| Engineer | JAYESH N RAWAL |
| Chartered Accountant | MANISH PATEL COMPANY |
| Chartered Accountant | Chirag Surana |
| Partner | Role in project |
|---|---|
| - | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: New Siddharth Form 1 Architect certificate Qtr March 26.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: New Siddharth Form 2 Engineer Certificate Qtr Mar 26.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA certificate Qtr MArch 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: New Siddharth Form 1 Architect certificate Qtr Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: New Siddharth Form 1 Architect certificate Qtr Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: New Siddharth Form 2 Engineer Certificate Qtr Dec25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: New Siddharth Form 2 Engineer Certificate Qtr Dec25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: New Siddharth Form 3-CA certificate Qtr Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: New Siddharth Form 3-CA certificate Qtr Dec 25.pdf | 19 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5- Annual Report FY 24-25 New Siddharth.pdf | 28 Nov 2025 |
| Form 2A (FY 2023-2024)File: New Siddharth_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 11 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5- Annual Report FY 23-24 New Siddharth.pdf | 11 Nov 2025 |
| Form 2A (FY 2024-2025)File: New Siddharth_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: New Siddharth Form 1 Architect certificate Qtr Sept 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: New Siddharth Form 2 Engineer Certificate Qtr Sept 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: New Siddharth_Form 3 CA certificate_Qtr Sept 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: New Siddharth_Form 1_Architect certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 2File: New Siddharth_Form 2_Engineer Certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA certificate Qtr June 25.pdf | 20 Sep 2025 |
| Withdrawal Update Form 1File: New Siddharth_Form 1_Architect certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 1File: New Siddharth_Form 1_Architect certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: New Siddharth_Form 2_Engineer Certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: New Siddharth_Form 2_Engineer Certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA certificate Qtr June 25.pdf | 18 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Qtr June 24.pdf | 25 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Qtr June 24.pdf | 25 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr June 24.pdf | 25 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr June 24.pdf | 25 Aug 2025 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA ertificate.pdf | 25 Aug 2025 |
| Withdrawal Update Form 3File: New Siddharth Form 3 CA ertificate.pdf | 25 Aug 2025 |
| Form 1File: New Siddharth Form 1 Architect certificate Qtr Mar 25.pdf | 16 Aug 2025 |
| Form 2File: New Siddharth Form 2 Engineer certificate Qtr Mar 25.pdf | 16 Aug 2025 |
| Form 3File: New Siddharth Form 3 CA certificate Qtr Mar 25.pdf | 16 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory as of Mar 2025.pdf | 16 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Siddharth Form 1 Qtr Mar 25.pdf | 26 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Siddharth Form 3Qtr Mar 25.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Siddharth Form 2 Qtr Mar 25.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Siddharth Form 1.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Siddharth Form 3.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Siddharth Form 2.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: New Siddharth_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: New Siddharth_Form 2A_Engineer certificate for Quality Assurance_Mar 24.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Annual Report FY 23-24 New Siddharth.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Siddharth Form 1 Qtr Sep 24.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Siddharth Form 3 Qtr Sep 24.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Siddharth Form 2 Qtr Sep 24.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Siddharth Form 3 CA ertificate.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr June 24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr June 24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Siddharth Form 2.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Siddharth Form 3.pdf | 7 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC New Siddharth.pdf | 4 Apr 2024 |
| Building plan approvalFile: PLANS (19)_1-1.pdf | 17 Jan 2024 |
| Building plan approvalFile: PLANS (19)_2-2.pdf | 17 Jan 2024 |
| Building plan approvalFile: PLANS (19)_3-3.pdf | 17 Jan 2024 |
| Building plan approvalFile: PLANS (19)_4-4.pdf | 17 Jan 2024 |
| Building plan approvalFile: PLANS (19)_5-end.pdf | 17 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (19)_1-1.pdf | 17 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (19)_2-2.pdf | 17 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (19)_3-3.pdf | 17 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (19)_4-4.pdf | 17 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS (19)_5-end.pdf | 17 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200292124774_For_Asset_Based_Search_01_01_2024_21_32_05_657.pdf | 1 Jan 2024 |
| Declaration about Commencement CertificateFile: CC declaration 28-12-23.pdf | 30 Dec 2023 |
| Declaration in FORM BFile: Form B Promoter (1).pdf | 30 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form (1).pdf | 29 Dec 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (2) (2).pdf | 29 Dec 2023 |
| Proforma of Allotment letterFile: Draft Allotment Letter (3).pdf | 29 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation report on Allotment letter.pdf | 29 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report on Agreement for sale (1) (2).pdf | 29 Dec 2023 |
| Layout approvalFile: Amended IOD Plans.pdf | 26 Dec 2023 |
| Building plan approvalFile: Amended IOD.pdf | 26 Dec 2023 |
| PAN CardFile: 1 PAN Card (2).pdf | 26 Dec 2023 |
| Copy of the legal title reportFile: Title Report (4) (1).pdf | 26 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE FINANCE.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LEGAL.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE FINANCE.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LEGAL.pdf | 26 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Amended IOD Plans.pdf | 26 Dec 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Aspire | Village Kandivali Taluka Borivali MSD | 44 | Completed | Jun 2017 | Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY L on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI (WEST)6,700+ in Mumbai Suburban
MAYFAIR AANGAN
MAYFAIR HOUSING PRIVATE LIMITED
THE CASTLE
SOLIDAGO REALTY
103 West
M/s. RELCON ZP JE CONSTRUCTION LLP
HAPPY HOME CHSL
SUMUKH INFRA
Romell Ariana
ROMELL REAL ESTATE PRIVATE LIMITED
Kamla Borivali Lucky
Kamla Homes and Lifestyles Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: DIMPLE REALTORS PRIVATE LIMITED
DIMPLE REALTORS PRIVATE LIMITED has 5 registrations on MahaRERA, including 73 East and 19 North. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD?
The registered promoter entity is DIMPLE REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: YMS Consultants Limited YOMESH; Engineer: Mr. Ganesh Vazirkar; Engineer: JAYESH N RAWAL; Chartered Accountant: MANISH PATEL COMPANY; Chartered Accountant: Chirag Surana. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEW SIDDHARTH CO-OPERATIVE HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback