ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / NEW NEELGAGAN CHS

Registered No litigation declared Residential / Group Housing project

NEW NEELGAGAN CHS

By SCGKCORP

RG-MH-05774 · RERA P51700053902 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 49 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedmoved 49 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
25 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NEW NEELGAGAN CHS is a Residential / Group Housing project by SCGKCORP in Thane, Maharashtra, registered with MahaRERA as P51700053902 on 8 Dec 2023. Possession is promised by 30 Jun 2030. The completion date has moved by 49 months from the original filing. 0 of the 25 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEW NEELGAGAN CHS
  • TypeResidential / Group Housing
  • Location
    • SHIVGANGA NAGAR
    • AMBERNATH
    • Ambarnath (R)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053902
  • ReraGenie IDRG-MH-05774

Builder

  • NameSCGKCORP
  • Entity typePartnership
  • PartnerNikhil Sunil Chaudhary

Key dates

this monthRegisteredDec 2023First promiseMay 2026Revised toJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2023
  • Promised completion30 Jun 2030
  • Revised completionRevised to 30 Jun 2030 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed79 files

Current status

0%0 of 25 units booked
66.4%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEW NEELGAGAN CHS PVT LTDNA0025025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

NEW NEELGAGAN CHS PVT LTD: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,283 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NEW NEELGAGAN CHSAmbarnath (R)Thane

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI1282.51
Proposed, not sanctioned1,283 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBERNATH EAST
Estimated costRs 2.69 cr
Cost incurredRs 1.79 cr
Work done66.41%
BuildingWingEstimatedIncurred
NEW NEELGAGAN CHS PVT LTDNARs 2.55 crRs 1.79 cr
-NARs 13.79 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectpramod kamble
Engineermanoj kalvikatte
Chartered Accountantajita thampan
PartnerRole in project
SCGKCORP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04062621239May 2026 → Jun 2030

Reason as filed by the promoterdue to certain technical glitches the completion date got delayed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q1 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: Q1 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: Q3 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: Q3 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: Q4 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: Q1 26-27.pdf11 Aug 2026
Withdrawal Update Form 2File: fORM 2 QTR 1.pdf11 Aug 2026
Withdrawal Update Form 2File: form 2 Qtr 2.pdf11 Aug 2026
Withdrawal Update Form 2File: form 2 Qtr 2.pdf11 Aug 2026
Withdrawal Update Form 2File: form 2 Qtr 2.pdf11 Aug 2026
Withdrawal Update Form 2File: form 2 qtr 4.pdf11 Aug 2026
Withdrawal Update Form 2File: form 2 qtr 1 26-27.pdf11 Aug 2026
Withdrawal Update Form 3File: Form - April 25 to june 25.pdf11 Aug 2026
Withdrawal Update Form 3File: Form - April 25 to june 25.pdf11 Aug 2026
Withdrawal Update Form 3File: form 3 Oct 25 to Dec 25.pdf11 Aug 2026
Withdrawal Update Form 3File: form 3 Oct 25 to Dec 25.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3-.pdf11 Aug 2026
Withdrawal Update Form 1File: Form 1 may 26.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 may 26.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf18 Jul 2026
Form 5 (FY 2024-2025)File: Keyur CHS FY 24-25.pdf8 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 Keyur March 26_.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Q1 25-26.pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Q3 25-26.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 q1 25-26.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf7 Jul 2026
Withdrawal Update Form 3File: Form - April 25 to june 25.pdf7 Jul 2026
Withdrawal Update Form 3File: form 3 Oct 25 to Dec 25.pdf7 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf7 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 2026.pdf7 Jul 2026
Form 5 (FY 2023-2024)File: form 3 Mar 24.pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf4 Jun 2026
Withdrawal Update Form 2File: Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Mar 26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3- Jan26 to Mar26.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf2 Jun 2026
Withdrawal Update Form 3File: form 3 (2).pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3 Mar 25.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 Mar 25.pdf30 Oct 2025
Withdrawal Update Form 1File: Form1.pdf16 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf16 Aug 2025
Withdrawal Update Form 3File: Form 3 New neelgagan.pdf16 Aug 2025
Copy of the legal title reportFile: LEGAL TITLE.pdf13 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexue A new.pdf13 Oct 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf22 Aug 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf22 Aug 2023
CERSAI detailsFile: Cersai UNdertaking.pdf22 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf3 Aug 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf26 Jul 2023
Declaration about Commencement CertificateFile: Format D.pdf23 Jun 2023
Declaration in FORM BFile: Form B affidavit Notary.pdf23 Jun 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT FOR ALLOTMENT.pdf1 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FOR AGREEMENT.pdf1 Jun 2023
Proforma of Allotment letterFile: Allotment Letter.pdf26 May 2023
Layout approvalFile: New plan (1).pdf16 May 2023
Building plan approvalFile: AMC plan permition letter.pdf16 May 2023
Copy of Layout Approval (in case of layout)File: New plan (1).pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: AMC plan permition letter.pdf16 May 2023
Commencement Certificates / NA Order for plotted developmentFile: New cc_compressed.pdf16 May 2023
Proforma of Agreement for saleFile: Model AFS.pdf16 May 2023
PAN CardFile: scgk corp pan.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 comp.pdf3 May 2023

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 49 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW NEELGAGAN CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH7,600+ in Thane

2 kmNEW NEELGAGAN CHSCompleted 104Lapsed / revoked 37Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: SCGKCORP

SCGKCORP has 1 registration on MahaRERA, including NEW NEELGAGAN CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NEW NEELGAGAN CHS is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW NEELGAGAN CHS?

The registered promoter entity is SCGKCORP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW NEELGAGAN CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW NEELGAGAN CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW NEELGAGAN CHS?

The professionals named in the filing: Architect: pramod kamble; Engineer: manoj kalvikatte; Chartered Accountant: ajita thampan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW NEELGAGAN CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW NEELGAGAN CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW NEELGAGAN CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.