NEW GAYATRI DARSHAN CHS
RG-MH-28603 · RERA P51800027564 · Last updated on MahaRERA portal: 9 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 34 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEW GAYATRI DARSHAN CHS is a Residential / Group Housing project by SHIV SIDDHI ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027564 on 16 Dec 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 34 months from the original filing. 5 of the 50 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameNEW GAYATRI DARSHAN CHS
- TypeResidential / Group Housing
- Location
- MAHATMA PHULE ROAD
- MULUND EAST
- Kurla
- Mumbai Suburban
- 400081
- Pincode400081
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800027564
- ReraGenie IDRG-MH-28603
Builder
- NameSHIV SIDDHI ENTERPRISES
- Entity typePartnership
- PartnersSHYAMSUNDAR RATANLAL JANGAM, Ghanshyam Awadhraj Yadav
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Dec 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 28 Feb 2025)
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 9 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEW GAYATRI DARSHAN CHS LTD | NA | 23 | 21 | 50 | 0 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 61%.
NEW GAYATRI DARSHAN CHS LTD: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 61% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 22% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 26% |
Progress on shared amenities15
As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHRI GAYATRI DARSHAN CHS LTD | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pardhy & Associates |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| SHIV SIDDHI ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 31-12-2027 to complete the project and fulf
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Oct 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 New Gayatri Darshan CHS FY 2024-25.pdf | 9 Jun 2026 |
| Form 1File: Form 1 - New Gayatri Darshan CHS as on Dec 2025.pdf | 29 May 2026 |
| Form 2File: Form 2 - New Gayatri Darshan CHS as on Dec 2025.pdf | 29 May 2026 |
| Form 3File: Form 3 - New Gayatri Darshan CHS as on Dec 2025.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - New Gayatri Darshan CHS as on Dec 2025.pdf | 29 May 2026 |
| Form 1File: Form 1 - New Gayatri Darshan CHS as on March 2026.pdf | 29 May 2026 |
| Form 2File: Form 2 - New Gayatri Darshan CHS as on March 2026.pdf | 29 May 2026 |
| Form 3File: Form 3 - New Gayatri Darshan CHS as on March 2026.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - New Gayatri Darshan CHS as on March 2026.pdf | 29 May 2026 |
| Form 1File: Form 1 - New Gayatri Darshan CHS as on Sept 2025.pdf | 21 Feb 2026 |
| Form 2File: Form 2 - New Gayatri Darshan CHS as on Sept 2025.pdf | 21 Feb 2026 |
| Form 3File: Form 3 - New Gayatri Darshan CHS as on Sept 2025.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gayatri Darshan CHS as on Sep 2025.pdf | 21 Feb 2026 |
| Form 1File: Form 1 - New Gayatri Darshan CHS as on June 2025.pdf | 23 Dec 2025 |
| Form 2File: Form 2 - New Gayatri Darshan CHS as on June 2025.pdf | 23 Dec 2025 |
| Form 3File: Form 3 - New Gayatri Darshan CHS as on June 2025.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - New Gayatri Darshan CHS as on June 2025.pdf | 23 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1 till 300625 Signed.pdf | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL SIGNED Form 3_Table F_March 2025.pdf | 12 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 2025_Signed.pdf | 12 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Gayatri Darshan CHS as on 31-03-2025.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Gayatri Darshan CHS as on March 2025.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DocScanner Mar 17, 2025 12-36.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: DocScanner Mar 17, 2025 18-18.pdf | 17 Mar 2025 |
| Other - TechnicalFile: PERT Chart.pdf | 15 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon (3).pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 14 Feb 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 14 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Annexure A.pdf | 14 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 14 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 14 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5 2022 -23.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 23 -24.pdf | 14 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 September 2024.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2024.pdf | 12 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - New Gayatri Darshan CHS FY 2023-24.pdf | 12 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 New Gayatri Darshan CHS FY 2022-23.pdf | 28 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 New Gayatri Darshan CHS FY 2023-24.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Gayatri Darshan CHS Sep-2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Gayatri Darshan CHS Dec-2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Gayatri Darshan CHS Dec 2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Gayatri Darshan CHS Sep-2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - NEW GAYATRI DARSHAN CHS as on March 2023.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - NEW GAYATRI DARSHAN CHS as on June 2023.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - NEW GAYATRI DARSHAN CHS as on Sep 2023.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - NEW GAYATRI DARSHAN CHS as on Dec 2023.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - NEW GAYATRI DARSHAN CHS as on March 2024.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSE - Form 1 Arch cft Jun _2023.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 till 30-09-23.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 till 31-12-23.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 till 31-03-24.pdf | 30 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC signed.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate_FY2020-2021.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate_FY2021-2022.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects_till 28022023.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Structural Engineer_FY2020-2021_Sign.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Structural Engineer_FY2021-2022_Sign.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Sign.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Sign.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSE - Form 3 FY 2020-2021.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSE Form 3 - FY 2021-2022.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSE Form 3 - Till Feb 2023.pdf | 28 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Mar - 2021.pdf | 24 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Jun - 2021.pdf | 24 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Sep - 2021.pdf | 24 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Dec - 2021.pdf | 24 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Mar - 2022.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 SSE FY 2020-2021.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 SSE FY 2021-2022.pdf | 24 Feb 2023 |
| CERSAI detailsFile: SSE CERSAI_Search_Report_200247770595_For_Asset_Based_Search_21_09_2022_16_30_36_727 (1).p | 23 Dec 2022 |
| Declaration about Commencement CertificateFile: Declaration of CC - SSE.pdf | 22 Oct 2022 |
| OtherFile: Declaration About CC_SSE.pdf | 5 Jul 2021 |
| Layout approvalFile: SSE_IOD ISSUE DRG signed_Layout Approval Plan-1-2.pdf | 6 Oct 2020 |
| Building plan approvalFile: SSE_IOD ISSUE DRG signed_Layout Approval Plan-1-2.pdf | 6 Oct 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEW GAYATRI DARSHAN CHS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 173 registered projects within 2 km.
Ekvira and Saishakti
Magnaacasa Infrastructures and Realtors Pr
SENROOFS PHASE - III
PIONEER HOUSING
THE ALTEZZA
M/s. VIPL Varasiddhi Infra Project LLP
SUPREMO PHASE I SALVIA D WING
K V BUILDHOME LLP
SUPREMO PHASE II, WING C known as SAKURA
K V BUILDHOME LLP
Aveza Phase 2
Tata Housing Development Company Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SHIV SIDDHI ENTERPRISES
SHIV SIDDHI ENTERPRISES has 1 registration on MahaRERA, including NEW GAYATRI DARSHAN CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NEW GAYATRI DARSHAN CHS is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEW GAYATRI DARSHAN CHS?
The registered promoter entity is SHIV SIDDHI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEW GAYATRI DARSHAN CHS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEW GAYATRI DARSHAN CHS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEW GAYATRI DARSHAN CHS?
The professionals named in the filing: Architect: Pardhy & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEW GAYATRI DARSHAN CHS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.