Home / Browse projects / NEMAT -E- FAROOQUE HERITAGE

Registered No litigation declared Residential / Group Housing project

NEMAT -E- FAROOQUE HERITAGE

By FALAKDEVELOPER

RG-MH-85675 · RERA P51900013072 · Last updated on MahaRERA portal: 7 Mar 2025

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 90 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 90 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 90%
10Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

NEMAT -E- FAROOQUE HERITAGE is a Residential / Group Housing project by FALAKDEVELOPER in 400008, registered with MahaRERA as P51900013072 on 14 Sep 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 90 months from the original filing. 10 complaints are on record with the regulator.

At a glance

Project

  • NameNEMAT -E- FAROOQUE HERITAGE
  • TypeResidential / Group Housing
  • Location
    • .
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900013072
  • ReraGenie IDRG-MH-85675

Builder

  • NameFALAKDEVELOPER
  • Entity typePartnership
  • PartnerAJAZ AHMED ABDUL GANI BELIM

Key dates

this monthRegisteredSep 2017First promiseJun 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Sep 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEMAT -E- FAROOQUE HERITAGENA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

NEMAT -E- FAROOQUE HERITAGE: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)90%
Plinth90%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 7 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
PASSENGAR LIFTYes40%
LOBBYYes50%
CAR LIFTYes50%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area464 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI3705.5
Proposed, not sanctioned2,255 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchR and C Bldg, SIR JJ ROAD, MUMBAI 400 008

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAP DHARIA and Associates
EngineerAD SHINTRE CONSULTANT
Chartered AccountantBM CHAUHAN & CO
PartnerRole in project
FALAKDEVELOPER-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900016573Jun 2019 → Dec 2024

Reason as filed by the promoterDelay in Receiving authorization for re-validation of CC .

EXT51900009347Jun 2019 → Oct 2022

Reason as filed by the promoterDelay in Disbursement of Finance Procured due the Covid-19 Pandemic.

EXT51900027129Jun 2019 → Dec 2026

Reason as filed by the promoterProject delayed due to delay in regulatory approvals

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000056616Iqbal Husain SayedAqeel Khan17/10/2018
CC006000000057154Mr and Mrs. MukkadamM/S. FALAK DEVELOPERS11/12/2018
CC006000000194895Abu Saud Niyaz Ahad AzmiM/S FALAK DEVELOPERS11/11/2020
CC006000000210235Taher Abu Baker AdenwalaFalak Developers05/03/2022
CC006000000429167AQEEL KHAN1) Abu Baker Tar Mohammed Adenwala, 2) Mr. Daish Abubaker Adenwala 3) Mrs. Adenwala Salma Abu Baker09/02/2024
CC12501569Danish Abubaker AdenwalaFALAKDEVELOPER13/05/2025
CC12501806Taher Abu Baker AdenwalaFALAKDEVELOPER02/06/2025
CC12502951Taher Abu Baker AdenwalaFALAKDEVELOPER21/08/2025
CC12502973Minaz Abu Baker AdenwalaFALAKDEVELOPER23/08/2025
CC12602918SARFARAZ NAWAZ GADWALAFALAKDEVELOPER18/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Promoter.pdf7 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 31-12-24(Q3 24-25).pdf7 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf7 Mar 2025
CERSAI detailsFile: CERSAI_Declaration.pdf7 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Form A Bank Declaration.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Aqeel.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Aijaz.pdf7 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Confirmation on opening of RERA Designated Bank Accounts.pdf7 Mar 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_30-06-2024.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_30-09-2024.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_31-03-2024.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_31-12-2023.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_30-09-2023.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_30-06-2023.pdf10 Jan 2025
Certificates of CA (Form 3)File: Form_3_-_CA_certificate_31-03-20223 COMP.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: discolure of sold_0001.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf10 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 30-06-23.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 30-09-23.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 31-12-23.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 31-03-24.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 30-06-24.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 30-09-24.pdf9 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 As on 31-3-23 (Q4 22-23).pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form- 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf9 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf9 Jan 2025
Declaration in FORM BFile: Form B.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf13 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a 2020.pdf13 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2a 2021.pdf13 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2a 2022.pdf13 Jun 2023
Disclosure of sold/ booked inventoryFile: Rera disclouser sold Unsold.pdf13 Jun 2023
Certificates of CA (Form 3)File: form 3 rera (2).pdf13 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5_17-18.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5_18-19.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_19-20.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_20-21.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_21-22.pdf25 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Assosiation-society formation.pdf2 Jan 2023
Certificates of CA (Form 3)File: CA-Form-3-and-Annexure-1-1-3.pdf2 Sep 2017
Certificates of CA (Form 3)File: CA-Form-3-and-Annexure-1-4-4.pdf2 Sep 2017
Certificates of CA (Form 3)File: CA-Form-3-and-Annexure-1-5-7.pdf2 Sep 2017
Certificates of CA (Form 3)File: CA-Form-3-and-Annexure-1-8-8.pdf2 Sep 2017
Details of encumbrancesFile: NHF encumbrance.pdf30 Aug 2017
Declaration in FORM BFile: NFH formB.pdf30 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 NFH.pdf26 Aug 2017
Layout approvalFile: N F Heritage Plan.pdf25 Aug 2017
Building plan approvalFile: iod-1-3.pdf25 Aug 2017
Building plan approvalFile: iod-4-6.pdf25 Aug 2017
Building plan approvalFile: iod-7-9.pdf25 Aug 2017
Copy of the legal title reportFile: TITLE CERTIFICATE CS1350.pdf25 Aug 2017
Copy of the legal title reportFile: TITLE CERTIFICATE CS1351.pdf25 Aug 2017
Copy of Layout Approval (in case of layout)File: N F Heritage Plan.pdf25 Aug 2017
Building Plan Approval (IOD)File: iod-1-3.pdf25 Aug 2017
Building Plan Approval (IOD)File: iod-4-6.pdf25 Aug 2017
Building Plan Approval (IOD)File: iod-7-9.pdf25 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: CC 17 flrs.pdf25 Aug 2017
Proforma of Allotment letterFile: Sale Deed.pdf24 Aug 2017
Proforma of Allotment letterFile: Allotment letter.pdf24 Aug 2017
PAN CardFile: Falak Pan.pdf19 Aug 2017

Keep NEMAT -E- FAROOQUE HERITAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmNEMAT -E- FAROOQUE HERITCompleted 12Lapsed / revoked 19Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: FALAKDEVELOPER

FALAKDEVELOPER has 1 registration on MahaRERA, including NEMAT -E- FAROOQUE HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if NEMAT -E- FAROOQUE HERITAGE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEMAT -E- FAROOQUE HERITAGE?

The registered promoter entity is FALAKDEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEMAT -E- FAROOQUE HERITAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEMAT -E- FAROOQUE HERITAGE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEMAT -E- FAROOQUE HERITAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEMAT -E- FAROOQUE HERITAGE?

The professionals named in the filing: Architect: AP DHARIA and Associates; Engineer: AD SHINTRE CONSULTANT; Chartered Accountant: BM CHAUHAN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEMAT -E- FAROOQUE HERITAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEMAT -E- FAROOQUE HERITAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEMAT -E- FAROOQUE HERITAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.