Registration lapsed No litigation declared Residential / Group Housing project

NEELMANI 9

By SACHIN DINKARRAO MEHAR

RG-MH-30497 · RERA P50500049746 · Last updated on MahaRERA portal: 12 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

NEELMANI 9 is a Residential / Group Housing project by SACHIN DINKARRAO MEHAR in Nagpur, Maharashtra, registered with MahaRERA as P50500049746 on 24 Feb 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameNEELMANI 9
  • TypeResidential / Group Housing
  • Location
    • BELTARODI ROAD
    • MOUZA BABULKHEDA NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440027
  • Pincode440027
  • RERA no.P50500049746
  • ReraGenie IDRG-MH-30497

Builder

  • NameSACHIN DINKARRAO MEHAR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredFeb 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEELMANI 9NA97000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

NEELMANI 9: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor70%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered7
Open Space40

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area471 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025
LandownerVillageDistrict
MEHAR INFRASTRUCTURENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNIT, Nagpur
Permissible FSI1355.14
Proposed, not sanctioned1,355 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANTOLI NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJENDRA SULKE
EngineerSUDESH MALODE
Chartered AccountantYash Varma
PartnerRole in project
SACHIN DINKARRAO MEHAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Feb 2025

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: OC Completion Certificate of Neelmani 9.pdf12 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY UPTO 04072025.pdf8 Jul 2025
Other - TechnicalFile: AR certificate.pdf3 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate Neelmani 9.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31032024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30062024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE 30092024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE 31122024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate upto 31122024.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineer certificate 31122024.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY NM-9.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31122024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SACN COPY QUARTER-2.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SACN COPY QUARTER-2.pdf26 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CERTIFICATE 30062024.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER CERTIFICATE 30092024.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEELMANI 9 300924.pdf27 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEELMANI 9 300624.pdf27 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 31032024.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cer 31032024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: NEELMANI SOLD UNSOLD.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: NEELMANI SOLD UNSOLD.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 31032024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 30062024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate31122023.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA certificate upto 31-12-2023.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: N 9 booked Inventory.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate of Rera 31122023.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate upto 31 March.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate upto 30 june.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate upto 30 Sept.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate upto 31march.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate upto 30june.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate upto 30sept.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate upto 30june.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate upto 30september.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Architech Certificate upto 31 March 2023.pdf19 Oct 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate - Neelmani 9.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Feb 2023
Layout approvalFile: Layout Approval Neelmani 9.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal and Litigation Encumbrance Certificate - Neelmani 9.pdf10 Feb 2023
Details of encumbrances concerned to LegalFile: Legal and Litigation Encumbrance Certificate - Neelmani 9.pdf10 Feb 2023
Copy of Layout Approval (in case of layout)File: Layout Approval Neelmani 9.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate l - Neelmani 9.pdf7 Feb 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate l - Neelmani 9.pdf7 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Neelmani - 9.pdf7 Feb 2023
Proforma of Agreement for saleFile: Model Form of ATS.pdf7 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf30 Jan 2023
Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf21 Jan 2023
Deviation Report with respect to Allotment letterFile: Model Form of Allotment Letter.pdf21 Jan 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Report.pdf21 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate - Neelmani 9.pdf18 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account - Neelmani 9.pdf18 Jan 2023
Copy of the legal title reportFile: Legal Tital Report - Neelmani 9.pdf14 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257065407_For_Asset_Based_Search_09_01_2023_10_57_39_039.pdf9 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257068608_For_Asset_Based_Search_09_01_2023_11_20_24_758.pdf9 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257069419_For_Asset_Based_Search_09_01_2023_11_24_14_486.pdf9 Jan 2023
Building plan approvalFile: Sanction Map Neelmani - 9.pdf5 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map Neelmani - 9.pdf5 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 Jan 2023
Building plan approvalFile: Neelmani 9 NA Order 2_compressed.pdf24 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Neelmani 9 NA Order 2_compressed.pdf24 Dec 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter.pdf21 Dec 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Letter.pdf21 Dec 2022
PAN CardFile: pan card sachin sir.pdf20 Dec 2022
Declaration in FORM BFile: Neelmani 9 Form B.pdf20 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NEELMANI 8PLOT NO 3 RAJARSHI NAGAR JAMKAR LAYOUT BELTARODI ROAD NAGPUR 44002710CompletedSep 2022Late, Sep 2022

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELMANI 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA BABULKHEDA NAGPUR2,800+ in Nagpur

Builder: SACHIN DINKARRAO MEHAR

SACHIN DINKARRAO MEHAR has 3 registrations on MahaRERA, including NEEL MANI 7 and NEELMANI 8. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that NEELMANI 9 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NEELMANI 9 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELMANI 9?

The registered promoter entity is SACHIN DINKARRAO MEHAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELMANI 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELMANI 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELMANI 9?

The professionals named in the filing: Architect: RAJENDRA SULKE; Engineer: SUDESH MALODE; Chartered Accountant: Yash Varma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELMANI 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELMANI 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELMANI 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.