Home / Browse projects / Thane, Maharashtra / Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd
Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd
By OM SAI INFRA
RG-MH-55429 · RERA P51700049553 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 3.00 crore secured on the land, in favour of CITY UNION BANK LTD
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 9 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd is a Others project by OM SAI INFRA in Thane, Maharashtra, registered with MahaRERA as P51700049553 on 15 Feb 2023. Possession is promised by 31 Mar 2027. 22 of the 117 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameNeelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd
- TypeOthers
- Location
- B CABIN ROAD
- KOHOJ KHUNTAVALI
- Ambarnath (R)
- Ambarnath
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700049553
- ReraGenie IDRG-MH-55429
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed111 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | NA | 8 | 8 | 55 | 62 | 117 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 25%.
1: 39% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed141
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Neelam CHS Ltd. | Ambarnath (R) | Thane |
| KRISHNA MILAN CHS LTD | Ambarnath (R) | Thane |
| NEELAM CHS LTD | Ambarnath (R) | Thane |
| KRISHNA MILAN CHS LTD. | Ambarnath (R) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 1 | NA | Rs 12.78 cr | Rs 8.44 cr |
| - | NA | Rs 67.28 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHESH JAGTAP AND ASSOCIATES GPS BUSINESS CENTER |
| Engineer | KSK Consortium |
| Engineer | ATUL CHAUBEY |
| Chartered Accountant | Shamala Patil |
| Chartered Accountant | AJITHA THAMPAN |
| Chartered Accountant | D. S. JAIN AND CO. |
| Partner | Role in project |
|---|---|
| OM SAI INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architecht Certificate 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate Mar 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_Neelkrishna.pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_Neelkrishna.pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Neelkrishna.pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Neelkrishna.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: neelkrishna form 3.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: Final Form 3.pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: neelkeishna form 1.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: neelkeishna form 1.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: neelkrishna form 2.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: neelkrishna form 2.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: neelkrishna form 3.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: neelkrishna form 3.pdf | 17 Dec 2025 |
| Building plan approvalFile: Revised Plan Pg1.pdf | 11 Dec 2025 |
| Building plan approvalFile: Revised Plan Pg 2.pdf | 11 Dec 2025 |
| Building plan approvalFile: Revised Plan pg 3.pdf | 11 Dec 2025 |
| Building plan approvalFile: Revised Plan pg 3.pdf | 11 Dec 2025 |
| Building plan approvalFile: Revised Plan Pg 4.pdf | 11 Dec 2025 |
| Form 5 (FY 2024-2025)File: Neelkrishna chs ltd form 5.pdf | 25 Sep 2025 |
| Form 2A (FY 2024-2025)File: Neelkrishna.pdf | 24 Sep 2025 |
| Form 1File: neel krishna chs ltd 1.pdf | 19 Jul 2025 |
| Form 2File: neelkrishna chs ltd form 2.pdf | 19 Jul 2025 |
| Form 3File: form 3 Neel Krishna chs Ltd.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: neelkrishna chs ltd disclosure.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Neel Krishna chs ltd disclosure.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neel Krishna chs Ltd form 1.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neel Krishna chs ltd form 3.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neel Krishna chs ltd form 2.pdf | 9 May 2025 |
| Disclosure of sold/ booked inventoryFile: Neel Krishna chs ltd form 3.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 _ Neelkrishna chs Ltd.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 _ Neelkrishna chs Ltd.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Neelkrishna chs Ltd.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: form 3 _ Neelkrishna chs Ltd.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure _ Neelkrishna chs Ltd.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure 1Neelkrishna.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Neel Krishna.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelkrishna chs ltd form 2.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of books inventory Neel Krishna 30_09_2024.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Neel Krishna chs Ltd form 5.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neelkrishna form 1.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: neelkrishna form 2 (1).pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of neelkrishna_compressed (1).pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: neelkrishna from 3_compressed.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from no 1 Neelkrishna.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Neelkrishna.pdf | 22 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: from-2A Neelkrishna.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Neel Krishna Disclosure 10-04-2024.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from-3 Pratibha chs_compressed.pdf | 22 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: neelkrish.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Neelkrishna.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelkrishna form 2.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: neelkrishna disclosure(3).pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neelkrishna form 3.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEEL_KRISHNA (1).pdf | 1 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: neelkrishna disclosure 30-09-23.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: neelkrishna form3.pdf | 1 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: neelkrishna form1.pdf | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: neelkrishna form 1.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEEL_KRISHNA FORM 2.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A NEELKRISHNA.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Neelkrishna disclosure COM.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: neelkrishna revised discloure.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: neelkrishna form -5.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NeelKrishna form 1.pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NeelKrishna form 2.pdf | 27 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A NEELKRISHNA.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEELKRISHNA form 3 (1).pdf | 27 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_6822.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6823.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6824.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6825.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6826.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6827.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6827.pdf | 20 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_CTS 6828.pdf | 20 Jan 2023 |
| Layout approvalFile: Plan Page 01.pdf | 17 Jan 2023 |
| Layout approvalFile: Plan Page 02.pdf | 17 Jan 2023 |
| Layout approvalFile: Plan Page 03.pdf | 17 Jan 2023 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE SAI PANACHE | SURVEY NO 142 HISSA NO 5 CHIKHLOLI K B ROAD AMBERNATH WEST THANE DIST | 29 | Completed | Jun 2020 | May 2019 |
| ANITA C H S LTD | PLOT NO 7 C T S NO 9000 NELYOG NAGAR B CABIN ROAD AMBERNATH EAST THANE DIST MAHARASHTRA | 37 | Completed | May 2020 | May 2019 |
| HERAMB KRUPA C H S LTD | C T S NO 4397 BHIDEWADI KANSAI SECTION VILLAGE AMBERNATH THANE DIST MAHARASHTRA | 34 | Completed | Feb 2020 | May 2019 |
| NILOY C H S | C T S NO 4378 SURVEY NO 82 PART VILLAGE KANSI AMBERNATH EAST THANE DIST MAHARASHTRA 421 501 | 78 | Completed | Dec 2019 | Sep 2018 |
| BRITTO HOUSE | PLOT NO 5 SURVEY NO 166 CTS NO 2269-2274 KHOJ KHUNTAVLI KHOJGAON AMBERNATH WEST THANE DIST MAHARASHTRA | 26 | Completed | Dec 2018 | Jan 2018 |
| SHREE SAI LEELA | SURVEY NO 86 HISSA NO 3 BARKUPADA AMBERNATH EAST THANE DIST | 12 | Completed | Jun 2018 | Jan 2018 |
| KANAK C H S LTD | NEELYOG NAGAR B CABIN ROAD VADAVLI AMBERNATH EAST THANE DIST | 24 | Completed | Jul 2016 | Jul 2016 |
| BHUSARE CHS LTD | KHOJ KUNTAVLI AMBARNATH WEST THANE DIST | 26 | Completed | Jun 2015 | Mar 2015 |
| SAI KRUPA APARTMENT | KHOJ KUNTAVLI AMBERNATH WEST THANE DIST | 31 | Completed | Jun 2015 | Apr 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Neelkrishna amalgamated project of Neelam CH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOHOJ KHUNTAVALI7,600+ in Thane
Filed coordinates, straight-line distance. 210 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: OM SAI INFRA
OM SAI INFRA has 4 registrations on MahaRERA, including OM SAI INFRA and Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd?
The registered promoter entity is OM SAI INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd?
The professionals named in the filing: Architect: MAHESH JAGTAP AND ASSOCIATES GPS BUSINESS CENTER; Engineer: KSK Consortium; Engineer: ATUL CHAUBEY; Chartered Accountant: Shamala Patil; Chartered Accountant: AJITHA THAMPAN; Chartered Accountant: D. S. JAIN AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback