Registered No litigation declared Others project

Neelkanth Stella

By Neelkanth Infracon

RG-MH-07204 · RERA P52000054706 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
74 of 139Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Neelkanth Stella is a Others project by Neelkanth Infracon in Raigarh, Maharashtra, registered with MahaRERA as P52000054706 on 6 Feb 2024. Possession is promised by 1 Dec 2028. 65 of the 139 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNeelkanth Stella
  • TypeOthers
  • Location
    • Sector No 17
    • New Panvel West
    • Khanda Colony
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054706
  • ReraGenie IDRG-MH-07204

Builder

  • NameNeelkanth Infracon
  • Entity typePartnership
  • PartnersRamesh Patel, Sunil Gaudani, Hemant Gaudani, Bhavik Gaudani
  • PartnerDARSHIT RAMESH PATEL
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion1 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Current status

47%65 of 139 units booked
36.8%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Neelkanth StellaNA171411623139

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Neelkanth Stella: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed139

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots139
Closed/Covered139

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,882 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on26 Mar 2026

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI13143.0
Proposed, not sanctioned5,819 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVashi, Sector 17
Estimated costRs 60.22 cr
Cost incurredRs 22.16 cr
Work done36.8%
BuildingWingEstimatedIncurred
Neelkanth StellaNARs 57.49 crRs 22.16 cr
-NARs 2.73 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatish V Ahuja
EngineerEPICONS CONSULTANTS PVT LTD
EngineerMUKESHKUMAR DAHYALAL SANGHVI
EngineerChirag Patel
Chartered AccountantJ N MEHTA & ASSOCIATES
Chartered AccountantMH Jain
PartnerRole in project
Neelkanth Infracon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: STELLA FORM 1 31 03 2026.pdf20 Jun 2026
Withdrawal Update Form 2File: FORM 2 N STELLA 31 03 2026.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 N Stella 31 03 2026 signed.pdf20 Jun 2026
Form 5 (FY 2023-2024)File: Final Form 5 stella.pdf18 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A F Y 24 25 STELLA.pdf17 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2AF Y 23 24 AURIS.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1 30 06 2025 Stella.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE 30 09 2025.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1 Stella 31 12 2025.pdf28 Mar 2026
Withdrawal Update Form 2File: FORM 2 JUNE 25 STELLA.pdf28 Mar 2026
Withdrawal Update Form 2File: Form 2 Stella 30 09 2025.pdf28 Mar 2026
Withdrawal Update Form 2File: Form 2 Stella 31 12 2025.pdf28 Mar 2026
Withdrawal Update Form 3File: Form 3 Stella June 25.pdf28 Mar 2026
Withdrawal Update Form 3File: Form 3 Stella 30 09 2025.pdf28 Mar 2026
Withdrawal Update Form 3File: Form - 3 Dec-2025 stella.pdf28 Mar 2026
Form 1File: Form 1 Stella 31 03 2025.pdf27 Mar 2026
Form 2File: Form 2 Mar 25 Stella.pdf27 Mar 2026
Form 3File: Form 3 Stella 31 03 2025.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold unit as on 31 03 25 Stella.pdf27 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Stella 31 03 25.pdf27 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form 1 Auris_Dec-24_Promoter Signed.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form _1 Stella_Dec 24_Promoter Signed.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 Form 3 Stella Dec_24.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2 Dec 24.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: 04 Disclousre of Sold and Unsold Inventory as on Dec 24 Stella.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_09_24 Final Stella.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Stella 24.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Stella Sept 24.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold unit as on 30 09 24.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_06_24_Final Stella with Darshit Patel Signed.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30_03_24 Final Stella.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_06_24_Final Stella.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Stella Mar-24.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3N Stella June 24.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _30_03_24 Stella.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Stella_30_6_24.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold unit as on 30_06_24123.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Discolusre Sold Unslod unit Mar 24.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Discolusre Sold Unslod unit June 24.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5 _AURIS_Mar-24_compressed.pdf10 Dec 2024
Layout approvalFile: AMENDED CC DRAWING DATE - 28 - 02 - 2024-1-5.pdf15 Apr 2024
Layout approvalFile: AMENDED CC DRAWING DATE - 28 - 02 - 2024-6-10.pdf15 Apr 2024
Copy of Layout Approval (in case of layout)File: AMENDED CC DRAWING DATE - 28 - 02 - 2024-1-5.pdf15 Apr 2024
Copy of Layout Approval (in case of layout)File: AMENDED CC DRAWING DATE - 28 - 02 - 2024-6-10.pdf15 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC STELLA DATE - 28 - 02 - 2024 (2).pdf29 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf29 Mar 2024
Proforma of Agreement for saleFile: Draft Agreement for Sale Format_Stella.pdf29 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement for Sale.pdf29 Mar 2024
CERSAI detailsFile: CERSAI 01022024 22.pdf1 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Account declaration.pdf1 Feb 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (1).pdf29 Jan 2024
Deviation Report with respect to Allotment letterFile: deviation allotment letter -Final.pdf29 Jan 2024
Other - LegalFile: Partnership deed.pdf25 Jan 2024
Other - LegalFile: PLOT.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrance.pdf15 Dec 2023
Details of encumbrances concerned to LegalFile: Details of Encumbrance.pdf15 Dec 2023
Building plan approvalFile: 01.pdf14 Dec 2023
Building plan approvalFile: 02.pdf14 Dec 2023
Building plan approvalFile: 03.pdf14 Dec 2023
Building plan approvalFile: 04.pdf14 Dec 2023
Building plan approvalFile: 05.pdf14 Dec 2023
Building plan approvalFile: 06.pdf14 Dec 2023
Building plan approvalFile: 07.pdf14 Dec 2023
Layout approvalFile: 01.pdf14 Dec 2023
Layout approvalFile: 02.pdf14 Dec 2023
Layout approvalFile: 03.pdf14 Dec 2023
Layout approvalFile: 04.pdf14 Dec 2023
Layout approvalFile: 05.pdf14 Dec 2023
Layout approvalFile: 06.pdf14 Dec 2023
Layout approvalFile: 07.pdf14 Dec 2023
PAN CardFile: Neelkanth Infracon Pan Card.pdf14 Dec 2023
Copy of the legal title reportFile: Title report.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 01.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 02.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 03.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 04.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 05.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 06.pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 07.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 01.pdf14 Dec 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Neelkanth AurisP52000045492Panvel West, Raigarh150May 2022OngoingMay 2027Not due yet
Neelkanth AlpineP51700021881Ghansoli, Navi Mumbai, Thane-Aug 2019CompletedJul 2024Oct 2023

How this compares with Raigarh

47%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neelkanth Stella on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Panvel West5,900+ in Raigarh

2 kmNeelkanth StellaCompleted 91Lapsed / revoked 24Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: Neelkanth Infracon

Neelkanth Infracon has 3 registrations on MahaRERA, including Neelkanth Alpine and Neelkanth Auris. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Neelkanth Stella is delayed beyond 1 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neelkanth Stella?

The registered promoter entity is Neelkanth Infracon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neelkanth Stella?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Neelkanth Stella?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neelkanth Stella?

The professionals named in the filing: Architect: Satish V Ahuja; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: MUKESHKUMAR DAHYALAL SANGHVI; Engineer: Chirag Patel; Chartered Accountant: J N MEHTA & ASSOCIATES; Chartered Accountant: MH Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neelkanth Stella?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neelkanth Stella. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neelkanth Stella to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.