Home / Browse projects / Raigarh, Maharashtra / Neelkanth Auris
Neelkanth Auris
RG-MH-81961 · RERA P52000045492 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Neelkanth Auris is a Others project by Neelkanth Infracon in Raigarh, Maharashtra, registered with MahaRERA as P52000045492 on 24 May 2022. Possession is promised by 5 May 2027. 122 of the 150 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameNeelkanth Auris
- TypeOthers
- Location
- Sector 17
- Panvel West
- Khanda Colony
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000045492
- ReraGenie IDRG-MH-81961
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 May 2022
- Promised completion5 May 2027
- Revised completionNone
- Buildings1 building record
- Documents filed168 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Neelkanth Auris | NA | 16 | 15 | 128 | 22 | 150 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Neelkanth Auris: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed144
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Neelkanth Auris | NA | Rs 36.51 cr | Rs 32.27 cr |
| - | NA | Rs 2.48 cr | Rs 2.47 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Satish V Ahuja |
| Engineer | Apicons Consultants PVT LTD |
| Engineer | MUKESHKUMAR DAHYALAL SANGHVI |
| Engineer | Chirag Patel |
| Chartered Accountant | J N Mehta and Associates |
| Chartered Accountant | M H JAIN AND CO |
| Partner | Role in project |
|---|---|
| Neelkanth Infracon | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 5 May 2027
Documents filed168
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Page 1 - Highlighted (Parking) (Permissible and Sanctioned BUA) Part OC Plans.pdf | 15 May 2026 |
| Building plan approvalFile: Page 2 - Ground Floor Plan (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 3 - First Floor Plan (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 4 - Mezz FLoor Plan (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 5 - Second FLoor Plan (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 6 - Typical Floor Plans (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 7 - Refuge Floor Plans (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 8 - Elevation (Part OC).pdf | 15 May 2026 |
| Building plan approvalFile: Page 9 - Elevation (Part OC).pdf | 15 May 2026 |
| Layout approvalFile: Page 1 - Highlighted (Parking) (Permissible and Sanctioned BUA) (Latest Sancioned Plans).p | 15 May 2026 |
| Building plan approvalFile: Page 2 - 1st Floor Plan (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 3 - Mezz floor Plan (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 4 - 2nd Floor Plan (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 5 - Typical Floor Plans (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 6 - Refuge Floor Plans (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 7- Front Elevation (Latest Sancioned Plans).pdf | 15 May 2026 |
| Building plan approvalFile: Page 8 - Elevation (Latest Sancioned Plans).pdf | 15 May 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A F Y 22 23 AURIS.pdf | 12 May 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A F Y 23 24 AURIS.pdf | 12 May 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A F Y 23 24 AURIS.pdf | 12 May 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 31 03 2023 AURIS.pdf | 11 May 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 AURIS Mar 24.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: AURIS FORM 1 RERA CERTIFICATE 31 03 2026 .pdf | 8 May 2026 |
| Withdrawal Update Form 2File: FORM 2 AURIS MAR 26.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 Auris 30 03 2026.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE 31 12 2025 Auris.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 auris dec 25.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: Auris Form 3 Rera Dec 25 with sign Promoter.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 Auris 30 9 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Auris 30 9 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: From 3 Auris Sep 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Rera Certificate 30 06 2025.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 N AURIS 30 06 2025.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Auris 30 06 2025.pdf | 28 Mar 2026 |
| Form 1File: Form 1 Rera Certificate 31 03 2025 Auris.pdf | 27 Mar 2026 |
| Form 2File: Form 2 Auris Mar 25.pdf | 27 Mar 2026 |
| Form 3File: Form 3 31 03 2025 Promoter Signed.pdf | 27 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold unit as on 31 03 25 Auris.PDF | 27 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Auris 3103 25.pdf | 27 Mar 2026 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 1.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 2.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 3.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 4.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 5.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 6.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 7.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 8.pdf | 10 Dec 2025 |
| Building plan approvalFile: Drawing_Amended CC 30 09 25 9.pdf | 10 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form 1 Auris_Dec-24_Promoter Signed.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 Form 3 Auris Dec _24.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2 .pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 04 Disclouser of Sold and Unsold Inventory as on Dec 24 Auris.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ 30_09_2024 _Final.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Sept 24 Auris.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Auris Sept 24.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold as on 30_09_24 Auris.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _31_03_24_Final_ Auris_with DP Signed.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_6_24 Final Auris with darshit patel signed.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 N Auris Mar 24 with promoter singed.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 N Auris June-24 with Promotor Signed.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _31_03_24 Auris.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30_06_24 Final_ Auris.pdf | 10 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold unit as on 31_03_24PDF.pdf | 10 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold unit as on 30_06_24123.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5 _AURIS_Mar-24.pdf | 10 Dec 2024 |
| Copy of the legal title reportFile: Updated Title Report_25-07-2024-Plot no 35.pdf | 27 Jul 2024 |
| Building plan approvalFile: Drawing 1- compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 2_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 3_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 4_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 5_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 7_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 8_compressed.pdf | 22 Jul 2024 |
| Building plan approvalFile: Drawing 6_compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 1- compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 2_compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 3_compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 4_compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 5_compressed.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing 7_compressed.pdf | 22 Jul 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Neelkanth StellaP52000054706 | New Panvel West, Raigarh | 139 | Feb 2024 | Ongoing | Dec 2028 | Not due yet |
| Neelkanth AlpineP51700021881 | Ghansoli, Navi Mumbai, Thane | - | Aug 2019 | Completed | Jul 2024 | Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 168 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Neelkanth Auris on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel West5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Neelkanth Infracon
Neelkanth Infracon has 3 registrations on MahaRERA, including Neelkanth Alpine and Neelkanth Auris. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Neelkanth Auris is delayed beyond 5 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Neelkanth Auris?
The registered promoter entity is Neelkanth Infracon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Neelkanth Auris?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Neelkanth Auris?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Neelkanth Auris?
The professionals named in the filing: Architect: Satish V Ahuja; Engineer: Apicons Consultants PVT LTD; Engineer: MUKESHKUMAR DAHYALAL SANGHVI; Engineer: Chirag Patel; Chartered Accountant: J N Mehta and Associates; Chartered Accountant: M H JAIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Neelkanth Auris?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback