NEELKANTH PALMS

By NEELKANTH DEVELOPERS

RG-MH-29407 · RERA P51700028339 · Last updated on MahaRERA portal: 29 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 30 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
183 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

NEELKANTH PALMS is a Others project by NEELKANTH DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700028339 on 18 Feb 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 30 months from the original filing. 21 of the 204 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEELKANTH PALMS
  • TypeOthers
  • Location
    • TEMGHAR
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028339
  • ReraGenie IDRG-MH-29407

Builder

  • NameNEELKANTH DEVELOPERS
  • Entity typePartnership
  • PartnersSUCHITRA NARAYAN MACHHA, RAMESH KASTURCHAND JAIN TEJAWAT, NIRMALKUMAR GAUTAMCHAND JAIN
  • Other registrations16 more →
  • Completed8 of 17
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2021First promiseJun 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed133 files

Current status

10%21 of 204 units booked
20.4%Work done, per cost certificate

Figures as on 29 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEELKANTH PALMSNA16152040204

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

NEELKANTH PALMS: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,716 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Feb 2026
LandownerVillageDistrict
SANDEEP TUKARAM CHOUDHARYKanchadPalghar
LAXMANSINGH SHANKARSINGH RAJPUROHITBhiwandi (M Corp.)Thane
DAIVAT MOTIRAM MHATREBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBhiwandi Nizampur City Municipal Corporation (BNCMC)
Permissible FSI11518.25
Proposed, not sanctioned10,743 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 TO 3, GROUND FLOOR, NAVKAR HEIGHTS, SN127/4,OLD MUMBAI AGRA ROAD,BHIWANDI, THANE-421302
Estimated costRs 42.42 cr
Cost incurredRs 8.65 cr
Work done20.4%
BuildingWingEstimatedIncurred
NEELKANTH PALMSNARs 38.42 crRs 8.65 cr
-NARs 4.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectmiyaji and associates
EngineerRAM V MARATHE
EngineerSHAMOIL MOMIN
Chartered AccountantMUKESH SONI
Chartered AccountantNITIN B DHAVAN
Chartered AccountantMAYURI DHAVAN
PartnerRole in project
NEELKANTH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017701Jun 2026 → Dec 2028

Reason as filed by the promoterTHE PROJECT WAS ASSIGNED FROM OLD PROMOTER SHRIKANT C MACHHA TO NEW PROMOTER M/S NEELKANTH DEVELOPERS A PARTNERSHIP FIRM BY DEED OF ASSIGNED WHICH WAS DULY APPROVED BY THE SECRETARY MAHARERA.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - JUNE 2026.pdf29 Aug 2026
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - JUNE 2026.pdf29 Aug 2026
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - JUNE 2026_11zon.pdf29 Aug 2026
Form 2A (FY 2025-2026)File: neelkanth palms form 2A.pdf21 Aug 2026
Form 5 (FY 2025-2026)File: form 5 neelkanth.pdf21 Aug 2026
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - JUNE 2026.pdf20 Aug 2026
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - JUNE 2026.pdf20 Aug 2026
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - JUNE 2026_11zon.pdf20 Aug 2026
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - MARCH 26.pdf3 Jun 2026
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - MARCH 26.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - MARCH 26.pdf3 Jun 2026
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - MARCH 26.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - MARCH 26.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - MARCH 26.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - MARCH 26.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - DEC 2025.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - MARCH 26.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - NEELKANTH - SEPT 2025.pdf29 Nov 2025
Withdrawal Update Form 2File: FORM 2 - NEELKANTH - SEPT 2025.pdf29 Nov 2025
Withdrawal Update Form 3File: FORM 3 - NEELKANTH - SEPT 2025.pdf29 Nov 2025
Withdrawal Update Form 1File: FORM 1 NEELKANTH JUN 25.pdf1 Aug 2025
Withdrawal Update Form 2File: FORM 2.pdf1 Aug 2025
Withdrawal Update Form 3File: FORM 3 NEELKANTH JUN 25.pdf1 Aug 2025
Form 1File: FORM 1 - NEELKANTH - MAR 25.pdf29 May 2025
Form 2File: FORM 2 - NEELKANTH - MAR 25.pdf29 May 2025
Form 3File: FORM 3 - NEELKANTH - MAR 25.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE FOR SOLD UNSOLD - MAR 25.pdf29 May 2025
Self-declaration of Quarterly ProgressFile: SELF DECL OF PROMOTER - MAR 25.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- NEELKANTH FY 23-24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- MARCH 24- NEELKANTH DEV.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUN 24- NEELKANTH DEV.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- SEP 24- NEELKANTH DEV-1.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024 - NEELKANTH DEVL.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 24- NEELKANTH DEVELOPERS.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 2024 -NEELKANTH DEVELOPERS_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN 2024 -NEELKANTH DEVEELOPERS_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2024 - NEELKANTH DEVELOPERS_11zon.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- DEC 24- NEELKANTH DEV_11zon.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- MARCH 24- NEELKANTH DEV.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUN 24- NEELKANTH DEV.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- SEPT 24- NEELKANTH DEV.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - DEC 2024 NEELKANTH DEV.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelkanth Developers.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NEELKANTH DEC -2023.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEELKANTH DEC 2023_11zon.pdf12 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A -MARCH 23 NEELKANTH.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE.pdf7 Oct 2023
Layout approvalFile: PLAN COPY NEELKANTH.pdf5 Oct 2023
Copy of Layout Approval (in case of layout)File: PLAN COPY NEELKANTH.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEELKANTH FORM 3 JUNE 2023_11zon.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEELKANTH FORM 3 SEPTEMBER 2023_11zon.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold disclosure new latest.pdf25 Sep 2023
Layout approvalFile: LAYOUT PLAN REVISED_11zon.pdf6 Sep 2023
Building plan approvalFile: BUILDING APPROVED PLAN-1_11zon.pdf6 Sep 2023
Building plan approvalFile: BUILDING PLAN APPROVED-2_11zon.pdf6 Sep 2023
PAN CardFile: NEELKANTH PANCARD.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: LEGAL LITIGATION.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: legal finance merged.pdf6 Sep 2023
Details of encumbrances concerned to LegalFile: LEGAL LITIGATION.pdf6 Sep 2023
Details of encumbrances concerned to LegalFile: legal finance merged.pdf6 Sep 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN REVISED_11zon.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING APPROVED PLAN-1_11zon.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVED-2_11zon.pdf6 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC_11zon.pdf6 Sep 2023
Declaration about Commencement CertificateFile: FORMAT D- CC DECLARATION.pdf6 Sep 2023
Declaration in FORM BFile: FORM B NEW PARTNERS NEELKANTH_11zon.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NEELKANTH DEVELOPER PARTNER MAY 2023_11zon.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NEELKANTH DEVELOPERS PARTNER MAY 23_11zon.pdf6 Sep 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEELKANTH PARTNERS 16 JUNE 23_11zon.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF SAGAR MACHHA.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE NIRMALKUMAR JAIN.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE RAMESH TEJAWAT.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SUCHITRA MACHHA.pdf6 Sep 2023
Proforma of Allotment letterFile: allotment letter_11zon.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A- SEPARATE BANK ACCOUNT.pdf6 Sep 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf6 Sep 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH MODEL COPY OF AGREEMENT.pdf6 Sep 2023

How this compares with Thane

10%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELKANTH PALMS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

2 kmNEELKANTH PALMSCompleted 12Lapsed / revoked 11Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: NEELKANTH DEVELOPERS

Neelkanth Developers has 17 registrations on MahaRERA, including KETAKI HEIGHTS and Neelkanth Gardens. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NEELKANTH PALMS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELKANTH PALMS?

The registered promoter entity is NEELKANTH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELKANTH PALMS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELKANTH PALMS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELKANTH PALMS?

The professionals named in the filing: Architect: miyaji and associates; Engineer: RAM V MARATHE; Engineer: SHAMOIL MOMIN; Chartered Accountant: MUKESH SONI; Chartered Accountant: NITIN B DHAVAN; Chartered Accountant: MAYURI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELKANTH PALMS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELKANTH PALMS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELKANTH PALMS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.