Home / Browse projects / Nagpur, Maharashtra / NEELKANTH NAGAR

Registered No litigation declared Plotted project

NEELKANTH NAGAR

By NAYAK BROTHERS

RG-MH-03967 · RERA P50500032913 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
22 of 39Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

NEELKANTH NAGAR is a Plotted project by NAYAK BROTHERS in Nagpur, Maharashtra, registered with MahaRERA as P50500032913 on 2 Feb 2022. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 17 of the 39 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNEELKANTH NAGAR
  • TypePlotted
  • Location
    • KH NO 120/121-2
    • P NO 35
    • Bahadura
    • Nagpur (Rural)
    • Nagpur
    • 441204
  • Pincode441204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500032913
  • ReraGenie IDRG-MH-03967

Builder

  • NameNAYAK BROTHERS
  • Entity typePartnership
  • PartnersKUSUM BABULAL NAYAK, MANISHA RAHUL GOUR, MANISH BABULAJI NAYAK, SHAILENDRA BABULAL NAYAK, VISHAL BABULAL NAYAK

Key dates

this monthRegisteredFeb 2022First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
  • BuildingsNot stated in filing
  • Documents filed115 files

Current status

44%17 of 39 units booked
40.0%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area18,399 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on8 Jul 2026

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI9221.82

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFRIENDS COLONY NAGPUR 440013
Estimated costRs 71.31 lakh
Cost incurredRs 28.52 lakh
Work done40.0%
BuildingWingEstimatedIncurred
-NARs 71.31 lakhRs 28.52 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH DADHE
ArchitectDHAWAL HARSHE
EngineerRAJESH DADHE
EngineerDHAWAL HARSHE
Chartered AccountantMUKUND BARVE
PartnerRole in project
NAYAK BROTHERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21022619939Dec 2025 → Dec 2027

Reason as filed by the promoterWE ARE FACING CHALLANGE OF CUSTOMER BOOKING SO WE ARE UNABLE TO COMPLETE THE PROJECT FOR DUE PERIOD I.E 30/12/2025. WE HAVE COMMENCEMENT OF 02/02/2022. WE REQUEST YOU TO KINDLY GIVE US THE EXTENSION U/S 7(3) FOR FURTHER DATE I.E 31/12/2027

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500074Mrinal KatkarNAYAK BROTHERS13/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q-1-FORM1 - ARCHITECT CERTIFICATE.pdf8 Jul 2026
Withdrawal Update Form 2File: Q-1-Form - 2- ENGINEER CERTIFICATE.pdf8 Jul 2026
Withdrawal Update Form 3File: Q-1-CA CERTIFICATE.pdf8 Jul 2026
Withdrawal Update Form 1File: Q-3-ARCHITES CERTIFICATE.pdf9 Apr 2026
Withdrawal Update Form 2File: Q-4- ENGINEER CERTIFICATE.pdf9 Apr 2026
Withdrawal Update Form 3File: Q-4-CA CERTIFICATE.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: FORM - 2A-NEW.pdf24 Mar 2026
Withdrawal Update Form 1File: Q-3-ARCHITES CERTIFICATE.pdf18 Feb 2026
Withdrawal Update Form 2File: Q-2- ENGINEER CERTIFICATE.pdf18 Feb 2026
Withdrawal Update Form 3File: Q-3- CA CERTIFICATE.pdf18 Feb 2026
Form 5 (FY 2021-2022)File: FORM-5-22.pdf6 Nov 2025
Form 5 (FY 2022-2023)File: FORM-5-23.pdf6 Nov 2025
Form 5 (FY 2023-2024)File: FORM-5-24.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: FORM-5-25.pdf6 Nov 2025
Withdrawal Update Form 1File: Q-2-ARCHITES CERTIFICATE.pdf7 Oct 2025
Withdrawal Update Form 2File: Q-2- ENGINEER CERTIFICATE.pdf7 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE - 09052024.pdf7 Oct 2025
Form 1File: ARCHITECT CERTIFICATE MAR 23.pdf11 Jul 2025
Form 2File: ENGINEERS ERTIFICATE MAR 23.pdf11 Jul 2025
Form 3File: CA CERTIFICATE - MAR 23.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY MAR 23.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE DEC 22.pdf11 Jul 2025
Form 2File: ENGINEERS CERTIFICATE DEC 22.pdf11 Jul 2025
Form 3File: CA CERTIFICATE - DEC 22.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY DEC 22.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE SEP 22.pdf11 Jul 2025
Form 2File: ENGINEERS CERTIFICATE SEP 22.pdf11 Jul 2025
Form 3File: CA CERTIFICATE - SEP 22.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY SEP 22.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE JUNE 22.pdf11 Jul 2025
Form 2File: ENGINEERS CERTIFICATE JUN 22.pdf11 Jul 2025
Form 3File: CA CERTIFICATE - JUN 22.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY JUN 22.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE MAR22.pdf11 Jul 2025
Form 2File: ENGINEERS CERTIFICATE MAR 22.pdf11 Jul 2025
Form 3File: FORM - 3 CA CERTIFICATE.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY MAR 22.pdf11 Jul 2025
Form 1File: ARCHITECT CERTIFICATE_compressed.pdf10 Jul 2025
Form 2File: ENGINEERS CERTIFICATE_compressed.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - JUNE 23.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY JUNE 23.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE_compressed.pdf10 Jul 2025
Form 2File: ENGINEERS CERTIFICATE_compressed.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - SEP 23.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY SEP 23.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE_compressed.pdf10 Jul 2025
Form 2File: ENGINEERS CERTIFICATE_compressed.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - DEC 23.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY DEC 23.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE-MAR 24.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE - MAR 24 .pdf10 Jul 2025
Form 3File: CA CERTIFICATE - MAR 24.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY MAR 24.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE- JUNE 24.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE - JUNE 24 .pdf10 Jul 2025
Form 3File: CA CERTIFICATE - JUNE 24.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY JUNE 24.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE- SEP 24.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE - SEP 24.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - SEP 24.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY SEP 24.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE- DEC 24.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE - DEC 24.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - DEC 24.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY DEC 24.pdf10 Jul 2025
Form 1File: ARCHITECT CERTIFICATE- MAR 25.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE - MAR 25.pdf10 Jul 2025
Form 3File: CA CERTIFICATE - MAR 25.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTRY MARCH 25.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - JUNE 23.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - DEC 23.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - SEP 23.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_compressed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_compressed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_compressed.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - 5.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM - 5.pdf12 Apr 2025

How this compares with Nagpur

44%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 24 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELKANTH NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near P NO 352,800+ in Nagpur

2 kmNEELKANTH NAGARCompleted 1Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: NAYAK BROTHERS

NAYAK BROTHERS has 1 registration on MahaRERA, including NEELKANTH NAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NEELKANTH NAGAR is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELKANTH NAGAR?

The registered promoter entity is NAYAK BROTHERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELKANTH NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEELKANTH NAGAR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEELKANTH NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELKANTH NAGAR?

The professionals named in the filing: Architect: RAJESH DADHE; Architect: DHAWAL HARSHE; Engineer: RAJESH DADHE; Engineer: DHAWAL HARSHE; Chartered Accountant: MUKUND BARVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELKANTH NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELKANTH NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELKANTH NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.