Home / Browse projects / Pune, Maharashtra / NEELENDU PRABHUKRUPA

Registered No litigation declared Residential / Group Housing project

NEELENDU PRABHUKRUPA

By M/S RIVANSH INFRACON LLP

RG-MH-30983 · RERA P52100079317 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 60%
7 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

NEELENDU PRABHUKRUPA is a Residential / Group Housing project by M/S RIVANSH INFRACON LLP in Pune, Maharashtra, registered with MahaRERA as P52100079317 on 28 Feb 2025. Possession is promised by 31 Dec 2027. 11 of the 18 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEELENDU PRABHUKRUPA
  • TypeResidential / Group Housing
  • Location
    • -
    • Parvati
    • Haveli
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079317
  • ReraGenie IDRG-MH-30983

Builder

  • NameM/S RIVANSH INFRACON LLP
  • Entity typePartnership
  • PartnersSahil Vijay Gaware, Vijay Nivrutti Gaware, Vinay Vishnu Ganthade, Sachin Dnyaneshwar Khilare

Key dates

this monthRegisteredFeb 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Feb 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

61%11 of 18 units booked
82.7%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEELENDU PRABHUKRUPANA7618018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

NEELENDU PRABHUKRUPA: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered32
Open Space10

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area553 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Nov 2025
LandownerVillageDistrict
Mrs. Vrushali Amit GosaviIsbaviSolapur
Mr. Niranjan B GosaviKothrudPune
Suneeta Nilesh GosaviVitthalvadiPune
Mr. Mayukh Neelesh GosaviVitthalvadiPune
Mrs. Mrudula Mandar ChiplunkarVitthalvadiPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI1720.87
Proposed, not sanctioned1,721 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 58, 59MAYUR COLONY KOTHRUD PUNE MAHARASHTRA 411029
Estimated costRs 8.20 cr
Cost incurredRs 6.78 cr
Work done82.67%
BuildingWingEstimatedIncurred
NEELENDU PRABHUKRUPANARs 7.97 crRs 6.78 cr
-NARs 22.50 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKUR ASSOCIATES
EngineerS P ASSOCIATES
Chartered AccountantCA REVATI KHAIRE FOR REVATI KHAIRE AND ASSOCIATES
Chartered AccountantDURGESH V VYAWAHARE AND ASSOCIATES
PartnerRole in project
M/S RIVANSH INFRACON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf7 May 2026
Withdrawal Update Form 2File: Form 2.pdf7 May 2026
Withdrawal Update Form 3File: Form 3.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: F 3.pdf20 Jan 2026
Layout approvalFile: LAYOUT - NEELENDU.pdf15 Nov 2025
Building plan approvalFile: Parking Plan.pdf15 Nov 2025
Withdrawal Update Form 1File: FORM 1 Architectu0027s Certificate 30-09-2025.pdf15 Nov 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTIFICATE SCAN 30-09-2025.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Neelendu.pdf15 Nov 2025
Form 1File: FORM 1 Architect's Certificate 30-09-2025.pdf17 Oct 2025
Form 2File: FORM 2 - ENGINEER'S CERTIFICATE SCAN 30-09-2025_compressed.pdf17 Oct 2025
Form 3File: FORM 3 CA Certificate 30-09-2025.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Inventry 30-09-2025.pdf17 Oct 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-06-2025.pdf26 Sep 2025
Form 2File: FORM 2 ENGINEERS CERTIFICATE 30-06-2025.pdf26 Sep 2025
Form 3File: FORM 3 CA CERTIFICATE 30-06-2025.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventry 30-06-2025.pdf26 Sep 2025
Declaration in FORM BFile: FROM B - PROMOTER DECLARATION.pdf28 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC VERIFICATION.pdf20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: NEW CC FINAL.pdf20 Feb 2025
Other - TechnicalFile: CC VERIFICATION.pdf20 Feb 2025
Other - TechnicalFile: PLAN NEW.pdf20 Feb 2025
Copy of the legal title reportFile: REVISED LEGAL TITILE REPORT_11zon.pdf13 Feb 2025
Other - LegalFile: POA Gosavi Chiplunkar Rivansh Infra.pdf12 Feb 2025
Other - TechnicalFile: REVISED CC.pdf12 Feb 2025
Other - FinanceFile: 2 Other - Legal.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Sachin k03012025165514.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure vinay Ganthade03012025165630.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Vijay Gavare06012025125057.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure Sahil Gavare06012025124945.pdf17 Jan 2025
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (1).pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (1).pdf14 Jan 2025
Other - FinanceFile: 2 Other - Legal.pdf14 Jan 2025
Other - TechnicalFile: Annx A-output.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate13012025161153_11zon.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neelendu CA Certificate Final.pdf10 Jan 2025
Layout approvalFile: Revised Plan-output_11zon.pdf9 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal encumbrance-output-output.pdf9 Jan 2025
Details of encumbrances concerned to FinanceFile: No encumbrance-output.pdf9 Jan 2025
Copy of Layout Approval (in case of layout)File: Revised Plan-output_11zon.pdf9 Jan 2025
Proforma of Allotment letterFile: Allotment Letter final - Neelendu_organized.pdf9 Jan 2025
Other - LegalFile: Rivansh Infracon LLP- LLP AGREEMENT_11zon.pdf9 Jan 2025
Other - LegalFile: LANDOWNERS SELF DECLARATION-output.pdf9 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter (1).pdf9 Jan 2025
Details of encumbrances concerned to LegalFile: No encumbrance-output.pdf9 Jan 2025
Details of encumbrances concerned to LegalFile: Legal encumbrance-output-output.pdf9 Jan 2025
Other - TechnicalFile: LANDOWNERS SELF DECLARATION-output.pdf9 Jan 2025
Deviation Report with respect to model copy of AgreementFile: no deviation Agreement.pdf9 Jan 2025
Proforma of Agreement for saleFile: Agreement for Sale final - Neelendu (1).pdf9 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: New Commencment Certificate Neelendu.pdf8 Jan 2025
Layout approvalFile: Revised Plan final.pdf3 Jan 2025
PAN CardFile: PAN CARD FINAL.pdf3 Jan 2025
Copy of Layout Approval (in case of layout)File: Revised Plan final.pdf3 Jan 2025
Declaration in FORM BFile: FORM B - PROMOTER DECLARATION.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archirect Certificate13012025160907.pdf3 Jan 2025
Declaration about Commencement CertificateFile: Format D -commencment declaration Final.pdf3 Jan 2025
CERSAI detailsFile: CERSAI Declaration (3) (1) (1).pdf3 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A- Declaration about RERA Designated Bank Account01012025115719-output.pdf3 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Letter of Bank for Opening RERA account (1) (1)-output.pdf3 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance FINAL (1).pdf3 Jan 2025

How this compares with Pune

61%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELENDU PRABHUKRUPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parvati13,700+ in Pune

2 kmNEELENDU PRABHUKRUPACompleted 61Lapsed / revoked 33Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: M/S RIVANSH INFRACON LLP

M/S RIVANSH INFRACON LLP has 1 registration on MahaRERA, including NEELENDU PRABHUKRUPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NEELENDU PRABHUKRUPA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELENDU PRABHUKRUPA?

The registered promoter entity is M/S RIVANSH INFRACON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELENDU PRABHUKRUPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELENDU PRABHUKRUPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELENDU PRABHUKRUPA?

The professionals named in the filing: Architect: ANKUR ASSOCIATES; Engineer: S P ASSOCIATES; Chartered Accountant: CA REVATI KHAIRE FOR REVATI KHAIRE AND ASSOCIATES; Chartered Accountant: DURGESH V VYAWAHARE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELENDU PRABHUKRUPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELENDU PRABHUKRUPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELENDU PRABHUKRUPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.