Home / Browse projects / Pune, Maharashtra / NEELAYA PROJECT 2

Completed No litigation declared Residential / Group Housing project

NEELAYA PROJECT 2

By NAIKNAVARE BUILDCON PVT LTD

RG-MH-12834 · RERA P52100021179 · Last updated on MahaRERA portal: 7 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 90%
1Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

NEELAYA PROJECT 2 is a Residential / Group Housing project by NAIKNAVARE BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100021179 on 14 Jun 2019. The registration is recorded completed; possession was promised by 30 Jun 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNEELAYA PROJECT 2
  • TypeResidential / Group Housing
  • Location
    • HIGHWAY MUMBAI PUNE
    • TALEGAON
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021179
  • ReraGenie IDRG-MH-12834

Builder

  • NameNAIKNAVARE BUILDCON PVT LTD
  • Entity typeCompany
  • DirectorHEMANT DATTAJI NAIKNAVARE
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2019PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jun 2019
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

BUILDING A: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 7 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,118 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7718.39
Proposed, not sanctioned7,218 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC ROAD PUNE 4

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI NAIKNAARE
EngineerKRUPALI KADAM
PartnerRole in project
NAIKNAVARE BUILDCON PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012282Jun 2022 → Jun 2023

Reason as filed by the promoterDate : 05.07.2022 To The Chief Engineer, RERA OFFICE, MUMBAI. Subject : Application for the Extension of "Neelaya" Project - 2-'A' Building P52100021179 in RERA. Dear Sir, We have registered our "Neelaya" Project - 2-'A' Building P52100021179 under RERA. The completion date for the project is 30th June 2022. But we are unable to complete our project due to various reasons mentioned as under. As you are aware, due to Covid-19 lockdown announced by the Government of Maharashtra 2 years back, the labours moved from site to their native places. Mostly the labours are from other States like UP, Bih

Litigation declared1

CaseCourtStatus
649/2017SUPREME COURTPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000167386Milind Rajendra KhadangaleM/s Naiknavare Buildcon Pvt. Ltd Through 1. Mr. Anand Hemant Naiknavare 2. Hemant Dattaji Naiknavare29/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2023

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Neelaya P2 FY 2023-24.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Neelaya Project 2 FORM 5 2022-23.pdf17 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: NEELAYA A BLDG FORM 4 SIGNED.pdf29 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Neelaya Pro2.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neelaya Pro2.pdf15 Jul 2023
Disclosure of sold/ booked inventoryFile: Neelaya Pro2 -A.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NEELAYA PROJECT-2.pdf7 Jul 2023
Certificates of CA (Form 3)File: Neelaya Pro 2 Form 3 Sept 22 compressed.pdf27 Jun 2023
Certificates of CA (Form 3)File: Neelaya P 2_Sept 21.pdf5 May 2023
Certificates of CA (Form 3)File: Neelaya P2_Dec 21.pdf5 May 2023
Certificates of CA (Form 3)File: Neelaya P2_Mar 22.pdf5 May 2023
Certificates of CA (Form 3)File: Neelaya P2_Jun 22.pdf5 May 2023
Certificates of CA (Form 3)File: NEELAYA PRO 2 Form 3 Apr jun 2021.pdf26 Apr 2023
Certificates of CA (Form 3)File: Form 3 NEELAYA PRO 2 dt 30 June 2021.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelaya Pro 2 - Form 2 Jan To March 2023.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: Neelaya-A_compressed.pdf10 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Neelaya project 2 form 2A JAN MAR 23.pdf3 Apr 2023
Certificates of CA (Form 3)File: Neelaya PRO 2 Form 3 oct Dec 22-compressed.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA A PRO 2 FORM 1 OCT DEC 22.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Nilaya - P2.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Neelaya A wing Occupancy Certificate.pdf27 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelaya Pro2.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: NEELAYA PRO 2 FORM 2A OCT DEC.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA PRO 2 FORM 2 JUN SEPT 22.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neelaya Pro 2 Arch Certi 04 Oct 2022.pdf10 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certi for Quality Assurance - Form 2A Neelaya Pro 2.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: NEELAYA RERA PRO 2 SOLD UNSOLD 041022.pdf6 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA PRO 2 FORM 2 JUN 22.pdf6 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA PRO 2 BLDG A RERA CERTIFICATE APR TO JUN.pdf1 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NEELAYA PRO 2 FORM 5 2019-2020.pdf23 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NEELAYA PRO 2 FORM 5 2020-21.pdf23 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NEELAYA OPRO 2 FORM 2A 20-21.pdf17 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NEELAYA PRO FORM 2A 21-22.pdf17 Aug 2022
CERSAI detailsFile: Neelaya NBPL CERSAI_Search_Report_200244183517_For_Debtor_Based_Search_07_08_2022_07_35_5817 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NEELAYA FORM 2A - 1 ST QUARTE -APR-JUN 22.pdf10 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: NEELAYA FORM 2A - 1 ST QUARTE -APR-JUN 22.pdf9 Aug 2022
Declaration about Commencement CertificateFile: Neelaya Pro 2 Declaration Commen Certi.pdf22 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT NEELAYA PRO 2.pdf4 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Neelaya Society Formation Certificate.pdf3 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGR CERT NEELAYA PRO 2.pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ne2 arch3122.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ne 2 eng 3122.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA-2 ARCH 3092021.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA-2 ARCH 3092021.pdf4 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA-2 ENG 3092021.pdf4 Oct 2021
Proforma of Allotment letterFile: A BLDG REWISE 982021.pdf9 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch neelaya pro 2 -1472021.pdf15 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng neelaya pro2-1472021.pdf15 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: neelya2 arch1342021.pdf30 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: neelya 2 eng 1342021.pdf30 Apr 2021
OtherFile: Neelaya B bldg completion.pdf26 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAY -2 ARCH 1212021.pdf12 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA-2 ENG1212021.pdf12 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA2 ARCH299.pdf6 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELYA2 ENG 299.pdf6 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA A ARCH 226.pdf24 Jun 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA A ENG 226.pdf24 Jun 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAYA 2 ARCH 932020.pdf12 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAYA 2 ENG 932020.pdf12 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch17122019.pdf17 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng17122019.pdf17 Dec 2019
OtherFile: CREDAINDPL MEM CERT 2020.pdf4 Nov 2019
Proforma of Allotment letterFile: Model Agreement Neelaya Project-2.pdf19 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch1692019.pdf16 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng1692019.pdf16 Sep 2019
Details of encumbrancesFile: ENCRUMBANCE.pdf1 Jun 2019
Certificates of CA (Form 3)File: ca1.pdf1 Jun 2019
Certificates of CA (Form 3)File: CA2.pdf1 Jun 2019
Certificates of CA (Form 3)File: CA3.pdf1 Jun 2019
OtherFile: NEELAYA AREA STATEMENTA.pdf1 Jun 2019
Layout approvalFile: 01_MASTER PLAN 23-05-2017 PHASE REVISED master plan (1).pdf31 May 2019
Building plan approvalFile: 01 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 02 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 03 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 04 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 05 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 06 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 07 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 08 NEELAYA SANCTION 2019.pdf31 May 2019
Building plan approvalFile: 09 NEELAYA SANCTION 2019.pdf31 May 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELAYA PROJECT 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON13,700+ in Pune

2 kmNEELAYA PROJECT 2Completed 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: NAIKNAVARE BUILDCON PVT LTD

NAIKNAVARE BUILDCON PVT LTD has 8 registrations on MahaRERA, including NEELAYA and NAIKNAVARE KUTUMB PRIME. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NEELAYA PROJECT 2 is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELAYA PROJECT 2?

The registered promoter entity is NAIKNAVARE BUILDCON PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELAYA PROJECT 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEELAYA PROJECT 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEELAYA PROJECT 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELAYA PROJECT 2?

The professionals named in the filing: Architect: GAURI NAIKNAARE; Engineer: KRUPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELAYA PROJECT 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELAYA PROJECT 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELAYA PROJECT 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.