Home / Browse projects / Mumbai Suburban, Maharashtra / NAVKETTAN PUSHPAANGAN
NAVKETTAN PUSHPAANGAN
By PRITI CONSTRUCTIONS PRIVATE LIMITED
RG-MH-18756 · RERA P51800077566 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAVKETTAN PUSHPAANGAN is a Residential / Group Housing project by PRITI CONSTRUCTIONS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077566 on 11 Oct 2024. Possession is promised by 31 Mar 2028. 4 of the 30 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameNAVKETTAN PUSHPAANGAN
- TypeResidential / Group Housing
- Location
- S V ROAD
- MALAD WEST
- MUMBAI
- Malad
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800077566
- ReraGenie IDRG-MH-18756
Builder
- NamePRITI CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- DirectorsVIKAS KHUSHILAL DAK, SHILPA VIKAS DAK
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Oct 2024
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed117 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NAVKETTAN PUSHPAANGAN | NA | 8 | 5 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 30%.
NAVKETTAN PUSHPAANGAN: 12% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed107
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NAVKETTAN PUSHPAANGAN | NA | Rs 13.56 cr | Rs 4.02 cr |
| - | NA | Rs 1.41 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAGHVENDRA KULKARNI & ASSOCIATES |
| Engineer | ASHISH DANDEKAR |
| Chartered Accountant | PUNIT B GUPTA & ASSOCIATES |
| Chartered Accountant | YOJANA B GUPTA |
| Partner | Role in project |
|---|---|
| PRITI CONSTRUCTIONS PRIVATE LIMITED | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 200141/2020 | SMALL CAUSES COURT | Ongoing |
| 202147/2010 | CITY CIVIL COURT | Ongoing |
| 1182/2024 | CITY CIVIL COURT | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603550 | HIMANSHU RAJNIKANT MANIAR | PRITI CONSTRUCTIONS PRIVATE LIMITED | 09/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Aug 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Nov 2025 |
| Form 1File: FORM 1 30-06-2025.pdf | 18 Jul 2025 |
| Form 2File: FORM 2 30-06-2025.pdf | 18 Jul 2025 |
| Form 3File: FORM 3 30-06-2025.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold 30 06 2025.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 23 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 23 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 dated 18 04 2025.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dated 17 04 2025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Dated 14 04 2025.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Dislosure of Sold Booked Inventory 14 04 2025.pdf | 19 Apr 2025 |
| Proforma of Agreement for saleFile: RERA Agreement.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 signed by PCPL (1).pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect s certificate.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer s Certificate dated.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory 14012025.pdf | 18 Jan 2025 |
| Proforma of Allotment letterFile: Allotment Letter on letter head with stamp.pdf | 9 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: No deviations in allotment letter.pdf | 9 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter on letter head with stamp.pdf | 9 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: No deviations in allotment letter.pdf | 9 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter on letter head with stamp.pdf | 9 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: No deviations in allotment letter.pdf | 9 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter on letter head with stamp.pdf | 9 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: No deviations in allotment letter.pdf | 9 Oct 2024 |
| CERSAI detailsFile: Cersai upload.pdf | 8 Aug 2024 |
| CERSAI detailsFile: Cersai upload.pdf | 8 Aug 2024 |
| CERSAI detailsFile: Cersai upload.pdf | 8 Aug 2024 |
| Copy of the legal title reportFile: Legal title report 01082024_11zon.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to LegalFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Copy of the legal title reportFile: Legal title report 01082024_11zon.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to LegalFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Copy of the legal title reportFile: Legal title report 01082024_11zon.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to LegalFile: New Encumberance Letter.pdf | 7 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: loan no availed_merged.pdf | 26 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: loan no availed_merged.pdf | 26 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: loan no availed_merged.pdf | 26 Jul 2024 |
| Other - TechnicalFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 23 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Other - TechnicalFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 23 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Other - TechnicalFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 23 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PCPL-Declaration cum Undertaking.pdf | 23 Jul 2024 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jul 2024 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jul 2024 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jul 2024 |
| PAN CardFile: pcpl pan card.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (2).pdf | 22 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jul 2024 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate pcpl.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf | 22 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jul 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 22 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NAVKETTAN PUSHPAANGAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MALAD WEST, MUMBAI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 441 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: PRITI CONSTRUCTIONS PRIVATE LIMITED
PRITI CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including NAVKETTAN PUSHPAANGAN. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NAVKETTAN PUSHPAANGAN is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAVKETTAN PUSHPAANGAN?
The registered promoter entity is PRITI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAVKETTAN PUSHPAANGAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NAVKETTAN PUSHPAANGAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NAVKETTAN PUSHPAANGAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAVKETTAN PUSHPAANGAN?
The professionals named in the filing: Architect: RAGHVENDRA KULKARNI & ASSOCIATES; Engineer: ASHISH DANDEKAR; Chartered Accountant: PUNIT B GUPTA & ASSOCIATES; Chartered Accountant: YOJANA B GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAVKETTAN PUSHPAANGAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback