ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / NAVJYOT ABHA PHASE II B and D

Registered No litigation declared Residential / Group Housing project

NAVJYOT ABHA PHASE II B and D

By SUMERU BUILDCON PRIVATE LIMITED

RG-MH-97152 · RERA P52100018862 · Last updated on MahaRERA portal: 29 Oct 2023

Source: official MahaRERA filing

Red flags

  • 38 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 10%
38Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

NAVJYOT ABHA PHASE II B and D is a Residential / Group Housing project by SUMERU BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100018862 on 6 Dec 2018. Possession is promised by 30 Dec 2026. 38 complaints are on record with the regulator.

At a glance

Project

  • NameNAVJYOT ABHA PHASE II B and D
  • TypeResidential / Group Housing
  • Location
    • SINHAGAD ROAD
    • DHAYARI
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100018862
  • ReraGenie IDRG-MH-97152

Builder

  • NameSUMERU BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsSHRIKANT VISHNU SHETE, PARESH RAMAJI POLADIYA, AJAY RAVINDRA RAYKAR
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2018PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA190000
BNA190000
ENA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

D28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered80
Open Space16
BuildingClosed/CoveredOpen SpaceTotal
D40848
B40848

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SUMERU BUILDCON PVT LTDDhayari (Part)Pune
MILIND POKALE AND OTHERSDhayari (Part)Pune
GANESH DNYANOBA POKALEDhayari (Part)Pune
VAISHNAVI PROMOTERS AND BUILDERS PRIVATE LIMITEDDhayari (Part)Pune

Approvals and building plan

Permissible FSI31671.0
Proposed, not sanctioned10,922 sq m
Buildings approved6
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch562-7 RIVER VIEW APARTMENT SAWARKAR BHAVAN CONGRESS HOUSE ROAD SHIVAJINAGAR 411005

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj D. Sanghvi
EngineerPRECISION PRECAST SOLUTION PVT LTD
PartnerRole in project
SUMERU BUILDCON PRIVATE LIMITED-

Complaints filed with MahaRERA38

Case no.ComplainantRespondentFiled
CC005000000279886Pallavi Anup Nitavane (Sonar)Sumeru Buildcon Pvt. Ltd.19/12/2023
CC005000000279897Sudarshan Bhavesh KalvankarSumeru Buildcon Pvt. Ltd19/12/2023
CC005000000279896Sonali vijay ArakSumeru Buildcon Pvt. Ltd.19/12/2023
CC005000000279895Gopal Bhagwanrao PatilSumeru Buildcon Pvt. Ltd19/12/2023
CC005000000279909Pratik Jaydeep BokilSumeru buildcon Pvt. Ltd.22/12/2023
CC005000000290120Yuvraj Vasant SawantSumeru Buildcon Private Limited23/01/2024
CC005000000290244Pooja Ajay DhanawadeSumeru Buildcon Private Limited02/02/2024
CC005000000290290Nitin Ramkrishna KawadeSumeru Buildcon Private Limited07/02/2024
CC005000000310310Vaijnath Kishanrao ChenageSumeru Buildcon Private Limited14/02/2024
CC005000000310323Shubhangi Ankush HodeSumeru Buildcon Private Limited14/02/2024
CC005000000310342Swara Sandesh GhanekarSumeru Buildcon Private Limited14/02/2024
CC005000000310404Akshay Sanjay GuravSumeru Buildcon Private Limited04/03/2024
CC005000000310486Shardula Somnath KumawatSumeru Buidlcon Private Limited05/03/2024
CC005000000310498Pratik Ramesh SalunkeSumeru Buildcon Private Limited07/03/2024
CC005000000310593Tushar Parbhakar WaghSumeru Buildcon Pvt Ltd.27/03/2024
CC12500600Harshal KulkarniSUMERU BUILDCON PRIVATE LIMITED21/02/2025
CC12500606Abhijit ShilamkarSUMERU BUILDCON PRIVATE LIMITED21/02/2025
CC12500609Amit MalwadeSUMERU BUILDCON PRIVATE LIMITED21/02/2025
CC12500645Sameer RawadeSUMERU BUILDCON PRIVATE LIMITED24/02/2025
CC12500678Ravindra MoreSUMERU BUILDCON PRIVATE LIMITED26/02/2025
CC12500692Renuka KaleSUMERU BUILDCON PRIVATE LIMITED27/02/2025
CC12500683Rajendra MaraneSUMERU BUILDCON PRIVATE LIMITED26/02/2025
CC12500880Mayur SandbhorSUMERU BUILDCON PRIVATE LIMITED13/03/2025
CC12500694Prashant KokateSUMERU BUILDCON PRIVATE LIMITED27/02/2025
CC12500695Piyush TalwalkarSUMERU BUILDCON PRIVATE LIMITED27/02/2025
CC12500738Sadanand RakhondeSUMERU BUILDCON PRIVATE LIMITED04/03/2025
CC12500740Mahesh RajiwadeSUMERU BUILDCON PRIVATE LIMITED04/03/2025
CC12500846Seema sanjay ShirsatSUMERU BUILDCON PRIVATE LIMITED12/03/2025
CC12500874Santosh NaikSUMERU BUILDCON PRIVATE LIMITED13/03/2025
CC12501030Arvind KanganeSUMERU BUILDCON PRIVATE LIMITED27/03/2025
CC12501356Virupaksha HalappanavarSUMERU BUILDCON PRIVATE LIMITED24/04/2025
CC12501448Yadurao KakadeSUMERU BUILDCON PRIVATE LIMITED29/04/2025
CC12501449Yogesh DhangadeSUMERU BUILDCON PRIVATE LIMITED29/04/2025
CC12501579Sandeep PaygudeSUMERU BUILDCON PRIVATE LIMITED13/05/2025
CC12502601Anil GijeSUMERU BUILDCON PRIVATE LIMITED28/07/2025
CC12601313Ranjeet KadamSUMERU BUILDCON PRIVATE LIMITED10/03/2026
CC12601788Anupam GajarmalSUMERU BUILDCON PRIVATE LIMITED27/03/2026
CC12602409Shardula Somnath KumawatSUMERU BUILDCON PRIVATE LIMITED24/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: NA DEC 22_compressed.pdf29 Oct 2023
Certificates of CA (Form 3)File: NA SEP 23_compressed.pdf29 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sumeru Buildcon001.pdf14 Feb 2023
Certificates of CA (Form 3)File: navjyot abha form3_compressed.pdf14 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Sumeru Buildcon )001.pdf9 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sumeru Buildcon001.pdf9 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sumeru Buildcon 12-7-2022001.pdf9 Dec 2022
Certificates of CA (Form 3)File: Form-3 (Navjyot Abha)001_compressed.pdf9 Dec 2022
Certificates of CA (Form 3)File: Form-3 (Navjyot Abha) 2001_compressed.pdf9 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Navjyot Abha II001.pdf2 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Navjyot Abha II001.pdf2 Sep 2022
Certificates of CA (Form 3)File: Form 3 Navjyot Abha Phase II001.pdf2 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf18 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form 1.pdf4 Jan 2022
Certificates of CA (Form 3)File: CA form3_compressed.pdf4 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certi sumeru buildcon_compressed.pdf29 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance sumeru buildcon_compressed.pdf29 Dec 2021
Disclosure of sold/ booked inventoryFile: SUMERU BUILDCON sold unsold_compressed.pdf29 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Navjyot Abha10072021152720_compressed.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Navjyot Abha10072021153029_compressed.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold unsold Inventary Navjyot Abha.pdf7 Oct 2021
Certificates of CA (Form 3)File: CA certificate.pdf7 Oct 2021
Declaration about Commencement CertificateFile: Declaration Certificate ( Sumeru Build )09032021111238.pdf4 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2018-19_compressed.pdf4 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018-19.pdf4 Sep 2021
Certificates of CA (Form 3)File: RERA FORM 3 NAVJOT ABHA 21082021_compressed.pdf21 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Navjyot abha.pdf17 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Navjyot Abha - Form 1.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Navjyot Abha - Form 2A.pdf16 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold_organized.pdf16 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Form2.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate - Form 2A (2).pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate - Form 2A (2).pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory B wing_compressed.pdf21 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory D wing_compressed.pdf21 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 17-12-2020 Navjyot Abha_compressed.pdf17 Jun 2021
Disclosure of sold/ booked inventoryFile: Sold and unsold details_compressed (1).pdf17 Jun 2021
OtherFile: Declaration for Commencement Certificate.pdf17 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Letter Pankaj Sanghvi.pdf10 Jun 2021
Layout approvalFile: SANCTION LAYOUT.pdf2 Jan 2021
Layout approvalFile: SANCTION LAYOUT 1.pdf2 Jan 2021
Building plan approvalFile: BASEMNET 1 PLAN.pdf2 Jan 2021
Building plan approvalFile: B BUILDING PLAN SECTION ELEVATION 1.pdf2 Jan 2021
Building plan approvalFile: B BUILDING PLAN SECTION ELEVATION 2.pdf2 Jan 2021
Building plan approvalFile: D BUILDING PLAN SECTION ELEVATION.pdf2 Jan 2021
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT.pdf2 Jan 2021
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT 1.pdf2 Jan 2021
Building Plan Approval (IOD)File: BASEMNET 1 PLAN.pdf2 Jan 2021
Building Plan Approval (IOD)File: B BUILDING PLAN SECTION ELEVATION 1.pdf2 Jan 2021
Building Plan Approval (IOD)File: B BUILDING PLAN SECTION ELEVATION 2.pdf2 Jan 2021
Building Plan Approval (IOD)File: D BUILDING PLAN SECTION ELEVATION.pdf2 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 NAVJYOTABHA.pdf31 Dec 2020
Annual Audit Report of Statutory CA (Form 5)File: FORM 5 NAVJYOTABHA.pdf30 Sep 2019
Layout approvalFile: Layout Plan - 1.pdf5 Dec 2018
Layout approvalFile: Layout Plan - 2.pdf5 Dec 2018
Layout approvalFile: Layout Plan - 3.pdf5 Dec 2018
Layout approvalFile: Layout Plan - 4.pdf5 Dec 2018
Layout approvalFile: Layout Plan - 5.pdf5 Dec 2018
Layout approvalFile: Permission Letter.pdf5 Dec 2018
Building plan approvalFile: Building Plan -1.pdf5 Dec 2018
Building plan approvalFile: Building Plan -2.pdf5 Dec 2018
Building plan approvalFile: Building Plan - 3.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan - 1.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan - 2.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan - 3.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan - 4.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan - 5.pdf5 Dec 2018
Copy of Layout Approval (in case of layout)File: Permission Letter.pdf5 Dec 2018
Building Plan Approval (IOD)File: Building Plan -1.pdf5 Dec 2018
Building Plan Approval (IOD)File: Building Plan -2.pdf5 Dec 2018
Building Plan Approval (IOD)File: Building Plan - 3.pdf5 Dec 2018
Layout approvalFile: LAYOUT.PDF17 Oct 2018
Building plan approvalFile: SANCTION PLAN.pdf17 Oct 2018
PAN CardFile: PAN Card For Sumeru Buildcon Pvt Ltd.pdf17 Oct 2018
Copy of the legal title reportFile: Navjyot Abha Title Report.pdf17 Oct 2018
Details of encumbrancesFile: Sumeru Buildecon Sanction Letter 1.pdf17 Oct 2018
Details of encumbrancesFile: Sumeru Buildecon Sanction Letter 2.pdf17 Oct 2018
Details of encumbrancesFile: Sumeru Buildecon Sanction Letter 3.pdf17 Oct 2018
Details of encumbrancesFile: Sumeru Buildecon Sanction Letter 4.pdf17 Oct 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BHAVANTAKDHAYARI PUNE20CompletedAug 2017Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAVJYOT ABHA PHASE II B and D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAYARI13,700+ in Pune

Builder: SUMERU BUILDCON PRIVATE LIMITED

SUMERU BUILDCON PRIVATE LIMITED has 2 registrations on MahaRERA, including NAVJYOT ABHA PHASE I and NAVJYOT ABHA PHASE II B and D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NAVJYOT ABHA PHASE II B and D is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVJYOT ABHA PHASE II B and D?

The registered promoter entity is SUMERU BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVJYOT ABHA PHASE II B and D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NAVJYOT ABHA PHASE II B and D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NAVJYOT ABHA PHASE II B and D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVJYOT ABHA PHASE II B and D?

The professionals named in the filing: Architect: Pankaj D. Sanghvi; Engineer: PRECISION PRECAST SOLUTION PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVJYOT ABHA PHASE II B and D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVJYOT ABHA PHASE II B and D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVJYOT ABHA PHASE II B and D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.