Registration lapsed No litigation declared Others project

NATRAJPLAZA

By Vikram Vedprakash Agarwal

RG-MH-67550 · RERA P52100015876 · Last updated on MahaRERA portal: 15 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 61 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2021Possession promised61 months past this date
3 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

NATRAJPLAZA is a Others project by Vikram Vedprakash Agarwal in Pune, Maharashtra, registered with MahaRERA as P52100015876 on 28 Mar 2018. Possession was promised by 25 Sep 2021 and is now 61 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameNATRAJPLAZA
  • TypeOthers
  • Location
    • BUDHWAR PETH
    • PUNE
    • Pune (M Corp.)
    • Pune City
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015876
  • ReraGenie IDRG-MH-67550

Builder

  • NameVikram Vedprakash Agarwal
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

61 months past promisethis monthRegisteredMar 2018First promiseSep 2020Revised toSep 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Mar 2018
  • Promised completion25 Sep 2021
  • Revised completionRevised to 25 Sep 2021 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NATRAJPLAZANA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

NATRAJPLAZA: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 15 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area299 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
NATRAJ REALTYPune (M Corp.)Pune
SANJAY MOHANSINGH PARDESHIPune (M Corp.)Pune
KISHORSINGH PARDESHIPune (M Corp.)Pune
ALKA ASHOK PARDESHIPune (M Corp.)Pune
ABHIJIT ASHOK PARDESHIPune (M Corp.)Pune
TEJAS ASHOK PARDESHIPune (M Corp.)Pune
REKHA RAJPUTThane (M Corp.)Thane
DIPALI LAWATEPune (M Corp.)Pune
VISHWAS VIJAY BHISEPune (M Corp.)Pune

Approvals and building plan

Permissible FSI554.57
Proposed, not sanctioned534 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHUKRAWAR PETH PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV ARCH
EngineerSTRUCTURE VIZION
PartnerRole in project
Vikram Vedprakash Agarwal-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006212Sep 2020 → Sep 2021

Reason as filed by the promoterThe Project is situated in Pune City Budhwar Peth, due to Covid 19 there is shortage of Labor and also labor are not ready to work because the project is situated in red zone, so the project will not be complete up to September 2021.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 May 2023

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY 17-18.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5 FY 22-23.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 March 24 Natraj Plaza.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A- FY 19-20.PDF10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A- FY 20-21.PDF10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A- FY 21-22.PDF10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A- FY 22-23.PDF10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- FY 23-24.PDF10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Natraj Plaza.PDF15 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec-24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Natraj Plaza.PDF15 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 442.PDF15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 24.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-June 24.pdf25 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf25 Dec 2024
CERSAI detailsFile: Declaration about CERSAI.pdf25 Dec 2024
Declaration in FORM BFile: Form B.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 24.PDF24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Dec 23.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Sep 23.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -June 23.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- March 23.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Dec 22.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Sep 22.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -June 22.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated Sep-24.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated June 24.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated March 24.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated Dec-23.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated Sep-23.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated March 23.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated Dec 22.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 Updated Sep-22.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated June 22.pdf24 Dec 2024
Certificates of CA (Form 3)File: Form 3 updated June-23.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March -24.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineers Certificate Sep-24.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate June-24.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Dec-23.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Sep 23.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate March 23.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate Dec 22.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Sep-22.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate June-22.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate June-23.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosur of SOLD or BOOKED INVENTORY.pdf24 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about RERA Designed BANK Account for Real estate projects.pdf24 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A -Disclosure of Interest in Other Real Estate Organisation.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_.pdf8 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 442_Completion Certificate.pdf22 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 19-20.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 20-21.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 21-22.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5_FY 17-18.PDF17 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_FY 18-19.PDF17 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2018.PDF28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2019.PDF28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2020.PDF28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2021.PDF28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022.PDF28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2018.PDF28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2019.PDF28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2020.PDF28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2021.PDF28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2022.PDF28 Feb 2023
Certificates of CA (Form 3)File: Form 3_2017-18_.PDF28 Feb 2023
Certificates of CA (Form 3)File: Form 3_2018-19_.PDF28 Feb 2023
Certificates of CA (Form 3)File: Form 3_2019-20_.PDF28 Feb 2023
Certificates of CA (Form 3)File: Form 3_2020-21.PDF28 Feb 2023
Certificates of CA (Form 3)File: Form 3_2021-22.PDF28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate (1).PDF13 Sep 2020
Certificates of CA (Form 3)File: noc tax0001 (2) (1).pdf13 Sep 2020
Building plan approvalFile: Plan20_03_2018.pdf19 Mar 2018
Building Plan Approval (IOD)File: Plan20_03_2018.pdf19 Mar 2018
Declaration in FORM BFile: stamp.PDF19 Mar 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Natraj Angan1041 Shukrawar Peth Pune6CompletedJun 2018Late, Jun 2019
Sai VidhiC T S NO 31 32 33 Kasaba Peth Pune 41100224CompletedMar 2018Late, Oct 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATRAJPLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmNATRAJPLAZACompleted 74Lapsed / revoked 53Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 259 registered projects within 2 km.

Builder: Vikram Vedprakash Agarwal

Vikram Vedprakash Agarwal has 5 registrations on MahaRERA, including NATRAJPLAZA and Shree Siddhivinayak Residency. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that NATRAJPLAZA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NATRAJPLAZA is delayed beyond 25 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATRAJPLAZA?

The registered promoter entity is Vikram Vedprakash Agarwal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATRAJPLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATRAJPLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATRAJPLAZA?

The professionals named in the filing: Architect: V ARCH; Engineer: STRUCTURE VIZION. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATRAJPLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATRAJPLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATRAJPLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.