Completed No litigation declared Residential / Group Housing project

NATRAJ VATSA

By NATRAJ REALTORS

RG-MH-13063 · RERA P52100022260 · Last updated on MahaRERA portal: 22 Oct 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

NATRAJ VATSA is a Residential / Group Housing project by NATRAJ REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100022260 on 9 Sep 2019. The registration is recorded completed; possession was promised by 19 Mar 2024. The completion date has moved by 2 months from the original filing.

At a glance

Project

  • NameNATRAJ VATSA
  • TypeResidential / Group Housing
  • Location
    • SOMWAR PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411011
  • Pincode411011
  • RERA no.P52100022260
  • ReraGenie IDRG-MH-13063

Builder

  • NameNATRAJ REALTORS
  • Entity typePartnership
  • PartnerWASIM AKHTAR TAMBOLI
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2019First promiseJan 2024Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Sep 2019
  • Promised completion19 Mar 2024
  • Revised completionRevised to 19 Mar 2024 (originally 1 Jan 2024)
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NATRAJ VASTANA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

NATRAJ VASTA: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area198 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
GOPAL VINAYA DHAVALEPune (M Corp.)Pune
SHUBHADA GOPAL DHAVALEPune (M Corp.)Pune
Shrikrushana Dattatray PataskarPune (M Corp.)Pune

Approvals and building plan

Permissible FSI837.97
Proposed, not sanctioned319 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShukrawar Peth

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikram V Agarwal
EngineerVikram V Agarwal
Chartered AccountantRushikesh A Gandhi
PartnerRole in project
NATRAJ REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025069Jan 2024 → Mar 2024

Reason as filed by the promoterReason for application of extension is we are heading toward obtaining occupancy certificate from Pune Municipal Corporation before our project completion date i.e. 01/01/2024 since due to new UDCPR rules implementation all the application for occupancy certificate has been set aside by PMC for 2-3 months hence we got our occupancy letter from Pune Municipal Corporation as on 19/03/2024 which is delayed by 77 days after completion date. You’re Honor, as you can see our building is complete in all aspect before expiry date of the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_July-Sep 24.PDF22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Natraj VASTA 2023.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Natraj VASTA 2024.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24.PDF19 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf19 Oct 2024
Certificates of CA (Form 3)File: Form 3_Sep 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 24.PDF19 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Inventory.PDF19 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.PDF19 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate 152.PDF13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2_Natraj Vatsa_June 24.PDF6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Vatsa_June 24.PDF6 Jul 2024
Disclosure of sold/ booked inventoryFile: 152 Format of Disclousure.PDF6 Jul 2024
Certificates of CA (Form 3)File: Form 3_Natraj Vatsa_June 24.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 23.PDF19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 23.PDF19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 23.PDF19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 23.PDF19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 23.PDF19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 23.PDF19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 23.PDF19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 23.PDF19 Mar 2024
Certificates of CA (Form 3)File: Form 3_Natraj Realtors_March 23.PDF19 Mar 2024
Certificates of CA (Form 3)File: Form 3_Natraj Realtors_June 23.PDF19 Mar 2024
Certificates of CA (Form 3)File: Form 3_Natraj Realtors_Sep 23.PDF19 Mar 2024
Certificates of CA (Form 3)File: Form 3_Natraj Realtors_Dec 23.PDF19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 21-22.PDF3 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Natraj Relaltors.PDF3 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 19-20.PDF17 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 20-21.PDF17 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 21-22.PDF17 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtors_ 19-20.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ 20-21.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ Apr-Dec 21.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ Jan-Mar 22.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ Apr-Jun 22.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ Jul-Sept 22.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Natraj Realtor_ Oct-Dec 22.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ 19-20.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ 20-21.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ Apr-Dec 21.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ Jan-Mar 22.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ Apr-Jun 22.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ Jul-Sept 22.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Natraj Realtor_ Oct-Dec 22.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 19-20.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 20-21.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 21-22 Q3.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 21-22 Q4.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 22-23 Q1.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 22-23 Q2.PDF8 Mar 2023
Certificates of CA (Form 3)File: Form 3 FY 22-23 Q3.PDF8 Mar 2023
Building plan approvalFile: PLAN.pdf3 Aug 2019
Layout approvalFile: PLAN.pdf3 Aug 2019
Copy of the legal title reportFile: search title.PDF3 Aug 2019
Details of encumbrancesFile: Natraj Realtor Affidavit.pdf3 Aug 2019
Copy of Layout Approval (in case of layout)File: PLAN.pdf3 Aug 2019
Building Plan Approval (IOD)File: PLAN.pdf3 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf3 Aug 2019
Declaration in FORM BFile: Natraj Realtor Affidavit.pdf3 Aug 2019
Certificates of CA (Form 3)File: Form 3 .pdf3 Aug 2019
Proforma of Allotment letterFile: 152 Somwar Peth Flat Agreement.pdf3 Aug 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Natraj Plaza442 Budhwar Peth33CompletedMar 2020Mar 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 2 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATRAJ VATSA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOMWAR PETH13,700+ in Pune

Builder: NATRAJ REALTORS

NATRAJ REALTORS has 1 registration on MahaRERA, including NATRAJ VATSA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NATRAJ VATSA is delayed beyond 19 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATRAJ VATSA?

The registered promoter entity is NATRAJ REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATRAJ VATSA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATRAJ VATSA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATRAJ VATSA?

The professionals named in the filing: Architect: Vikram V Agarwal; Engineer: Vikram V Agarwal; Chartered Accountant: Rushikesh A Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATRAJ VATSA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATRAJ VATSA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATRAJ VATSA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.