Home / Browse projects / Thane, Maharashtra / NARMADESHWAR

Registered No litigation declared Others project

NARMADESHWAR

By ASHAPURA COMBINES

RG-MH-18088 · RERA P51700066563 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
90 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

NARMADESHWAR is a Others project by ASHAPURA COMBINES in Thane, Maharashtra, registered with MahaRERA as P51700066563 on 11 Jun 2024. Possession is promised by 31 Dec 2030. 11 of the 101 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameNARMADESHWAR
  • TypeOthers
  • Location
    • Wadeghar-Kalyan West
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700066563
  • ReraGenie IDRG-MH-18088

Builder

  • NameASHAPURA COMBINES
  • Entity typePartnership
  • PartnersVipul Harilal Patel, Mangesh Dashrath Gaikar, Harilal Nathu Patel, Ritesh Harilal Sanghani
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredJun 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

11%11 of 101 units booked
0.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NARMADESHWARNA23238516101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

NARMADESHWAR: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed226

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots226
Closed/Covered130
Open Space96

Land and ownership105

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,510 sq m
Land owned byThe promoter, with other names on the file
Named landowners105
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
Gajanan Kalu DalviGhatkoparMumbai Suburban
Santosh Gajanan DalviGhatkoparMumbai Suburban
Ramesh Kalu DalviGhatkoparMumbai Suburban
Kamlabai Vaman PatilGhatkoparMumbai Suburban
Ujjwala Vilas MirkuteGhatkoparMumbai Suburban
Rakesh Manohar KonkarGhatkoparMumbai Suburban
Umesh Manohar KonkarGhatkoparMumbai Suburban
Sunita Shankar PawarGhatkoparMumbai Suburban
Sandesh Gajanan DalviGhatkoparMumbai Suburban
Sandeep Gajanan DalviGhatkoparMumbai Suburban
Suresh Kalu DalviGhatkoparMumbai Suburban
Sanjay Suresh DalviGhatkoparMumbai Suburban
Bhagabai Dashrath ShelarGhatkoparMumbai Suburban
Vishnu Dashrath ShelarGhatkoparMumbai Suburban
Laxmi Vishnu ShelarGhatkoparMumbai Suburban
Chandrakant Dashrath ShelarGhatkoparMumbai Suburban
Vandana Chandrakant ShelarGhatkoparMumbai Suburban
Ramesh Dashrath ShelarGhatkoparMumbai Suburban
Vithabai Ramesh ShelarGhatkoparMumbai Suburban
Gurunath Dashrath ShelarGhatkoparMumbai Suburban
Lilabai Gurunath ShelarGhatkoparMumbai Suburban
Bhagwan Dashrath ShelarGhatkoparMumbai Suburban
Subhadra Bhagwan ShelarGhatkoparMumbai Suburban
Krushna Dashrath ShelarGhatkoparMumbai Suburban
Sunanda Krushna ShelarGhatkoparMumbai Suburban
Sanjay Dashrath ShelarGhatkoparMumbai Suburban
Shubhangi Sanjay ShelarGhatkoparMumbai Suburban
Sharad Vishnu ShelarGhatkoparMumbai Suburban
Ratna Sharad ShelarGhatkoparMumbai Suburban
Rakesh Ramesh ShelarGhatkoparMumbai Suburban
Vasudev Gurunath ShelarGhatkoparMumbai Suburban
Mahesh Bhagwan ShelarGhatkoparMumbai Suburban
Nirmala Pandhari PatilGhatkoparMumbai Suburban
Sujata Haresh BhoirGhatkoparMumbai Suburban
Rekha Balaram PatilGhatkoparMumbai Suburban
Lilabai Mahadu GaikarGhatkoparMumbai Suburban
Suman Kanha BhoirGhatkoparMumbai Suburban
Sulochana Prakash KatheGhatkoparMumbai Suburban
Baliram Genu ShelarGhatkoparMumbai Suburban
Jaibai Baliram ShelarGhatkoparMumbai Suburban
Ramdas Baliram ShelarGhatkoparMumbai Suburban
Kanta Ramdas ShelarGhatkoparMumbai Suburban
Sunil Baliram ShelarGhatkoparMumbai Suburban
Kamla Sunil ShelarGhatkoparMumbai Suburban
Dilip Baliram ShelarGhatkoparMumbai Suburban
Shobha Vijay BhoirGhatkoparMumbai Suburban
Sulbha Dnyaneshwar MhatreGhatkoparMumbai Suburban
Kaluram Laxman ShelarGhatkoparMumbai Suburban
Durga Kaluram ShelarGhatkoparMumbai Suburban
Vijay Laxman ShelarGhatkoparMumbai Suburban
Sangeeta Vijay ShelarGhatkoparMumbai Suburban
Milind Kaluram ShelarGhatkoparMumbai Suburban
Pappi Milind ShelarGhatkoparMumbai Suburban
Yogesh Kaluram ShelarGhatkoparMumbai Suburban
Sarika Kaluram ShelarGhatkoparMumbai Suburban
Suresh Sharad ShelarGhatkoparMumbai Suburban
Parvatibai Sudam PatilGhatkoparMumbai Suburban
Nanda Manik PatilGhatkoparMumbai Suburban
Dhanibai Shankar ShelarGhatkoparMumbai Suburban
Gangubai Abhimanyu ShelarGhatkoparMumbai Suburban
Yashwant Shankar ShelarGhatkoparMumbai Suburban
Geeta Yashwant ShelarGhatkoparMumbai Suburban
Usha Vishnu MhatreGhatkoparMumbai Suburban
Sudha Madhukar ThakreGhatkoparMumbai Suburban
Jankubai Pandurang BhandariGhatkoparMumbai Suburban
Nagubai Namdeo KarbhariGhatkoparMumbai Suburban
Radhabai Ananta PatilGhatkoparMumbai Suburban
Laxman Govind MadhaviGhatkoparMumbai Suburban
Chaya Laxman MadhaviGhatkoparMumbai Suburban
Ramchandra Govind MadhaviGhatkoparMumbai Suburban
Sangeeta Ramchandra MadhaviGhatkoparMumbai Suburban
Lata Parshuram PimpleGhatkoparMumbai Suburban
Manglya Alias Mangesh Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Sangeeta Mangesh Naik Alias VanjurkarGhatkoparMumbai Suburban
Aavish Alias Avinash Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Vandana Avinash Naik Alias VanjurkarGhatkoparMumbai Suburban
Nirabai Alias Nirmala Mangaldas PatilGhatkoparMumbai Suburban
Kantibai Alias Kanta Prakash KeneGhatkoparMumbai Suburban
Pandabai Alias Sumitra Dinkar NaikGhatkoparMumbai Suburban
Heerabai Baban NaikGhatkoparMumbai Suburban
Harshal Baban NaikGhatkoparMumbai Suburban
Prakash Baban NaikGhatkoparMumbai Suburban
Fashibai Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Haresh Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Anita Haresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharad Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Lalita Sharad Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharmila Barku Alias Barkya KharbeGhatkoparMumbai Suburban
Bhagirthi Alias Bhagubai Vandar MadhaviGhatkoparMumbai Suburban
Gulab Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Naresh Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Asha Naresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Vidhya Naresh TiwariGhatkoparMumbai Suburban
Lata Bharat ChaudhariGhatkoparMumbai Suburban
Kavita Pramod MhatreGhatkoparMumbai Suburban
Janabai Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Sham Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Usha Sham Naik Alias VanjurkarGhatkoparMumbai Suburban
Rajesh Sham NaikGhatkoparMumbai Suburban
Dipti Sham NaikGhatkoparMumbai Suburban
Vasudev Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Lata Vasudev Naik Alias VanjurkarGhatkoparMumbai Suburban
Heerabai Yashwant Naik Alias VanjurkarGhatkoparMumbai Suburban
Laxmibai Alias Pramila Sudarshan ChaudhariGhatkoparMumbai Suburban
Nirmala Satyavan PatilGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPLE CORPORATION
Permissible FSI18825.75
Proposed, not sanctioned8,870 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJayant Arcade Junction of M G Road and Rajawadi Naka Ghatkopar East Mumbai
Estimated costRs 3.00 cr
Work done0.0%
BuildingWingEstimatedIncurred
NARMADESHWARNARs 1.50 cr-
-NARs 1.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREDIBLE DESIGNS DEEPAK PATIL
EngineerShanti Consultants
EngineerAYENDRA VISANJI VIRA
Chartered AccountantM K Ramani
Chartered AccountantK H R & CO
PartnerRole in project
ASHAPURA COMBINES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf20 Jun 2026
Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf20 Jun 2026
Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf20 Jun 2026
Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf20 Jun 2026
Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 31-03-2025-NDL.pdf3 Jun 2026
Form 2File: ns- form 2 -as on 31-3-25- dl.pdf3 Jun 2026
Form 3File: ns-from 3- as on 31-3-25- dl.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: ns- sold inv- as on 31-3-25-dl.pdf3 Jun 2026
Form 2A (FY 2025-2026)File: ENGINEER CERTIFICATE NARMADESHWAR 31-3-26.pdf30 Apr 2026
Form 1File: FORM -1 NARMADESHWAR ARCHITECT CERTIFICATE 31-3-26.pdf29 Apr 2026
Form 2File: FORM- 2 ENGINEER CERTIFICATE NARMADESHWAR 31-3-26.pdf29 Apr 2026
Form 3File: Form 3 - Narmadeshwar -31-3-26.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY- ND - 31-3-26.pdf29 Apr 2026
Form 1File: 1 Architect Certificate 31-12-2025.pdf27 Jan 2026
Form 2File: 2 ENGINEER Certificate 31-12-2025.pdf27 Jan 2026
Form 3File: 3 Form 3 - Narmadeshwar - Scan copy.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf27 Jan 2026
Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 2File: NARMADESHWAR ENGINEER CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 3File: ND-Form-3 as on 30-9-25.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Narmadeshwar-Sold Unsold Inventory Details.pdf13 Nov 2025
Form 2A (FY 2024-2025)File: NARMADESHWAR ENGINEER CERTIFICATE 31-3-25.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Narmadeshwar - Form 5-YR-2024-25.pdf26 Sep 2025
Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 2File: NARMADESHWAR ENGINEER CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 3File: ND- Form 3-dt30-6-25.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Narmadeshwar- Inventory Details-30-6-25.pdf11 Sep 2025
Disclosure of sold/ booked inventoryFile: NARMADESHWAR SOLD INVENTORY 31-3-25.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NARMADESHWAR ENGINEER CERTIFICATE 31-3-25.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5th Form 3 - Narmadeshwar -31-3-25 (1).pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NARMADESHWAR ENGINEER CERTIFICATE 31-03-2025.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: NARMADESHWAR SOLD LIST 31-12-24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4-th- Form3 -31-12-24-SIGNED.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE NAMADESHWAR 31-12-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE NARMADESHWAR 31-12-24.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2-ND - Form3 -30-6-24-SIGNED.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-ND- Form 3 -22-10-24-SIGNED_compressed.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-ENGINEER CERTIFICATE NARMSDESHWAR 1-7-24.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-ENGINEER CERTIFICATE NARMADESHWAR 1-10-24.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19-12-24-ARCHITECT CERTIFICATE NARMADESHWAR-AS ON 30-09-24.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NARMADESHWAR ARCHITECT CERTIFICATE 30-06-24.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development (11).pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: format D (1).pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Narmadeshwar.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf27 May 2024
Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development (9).pdf25 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: APPENDIX F for NARMADESHWAR building.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (2).pdf19 Apr 2024
Proforma of Agreement for saleFile: AFS_Narmdeshwar_Ashapura Combines_29032024.pdf19 Apr 2024
Proforma of Allotment letterFile: AL_Narmdeshwar_Ashapura Combines_29032024.pdf19 Apr 2024
Other - TechnicalFile: 1 Other - Technical (20).pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (7).pdf6 Apr 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (4).pdf5 Apr 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE legal.pdf5 Apr 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (4).pdf5 Apr 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE legal.pdf5 Apr 2024
Declaration about Commencement CertificateFile: DECLARATION c c.pdf5 Apr 2024
Declaration in FORM BFile: FORM B ASHAPURA COMBINES.pdf5 Apr 2024
CERSAI detailsFile: 1 CERSAI details (4).pdf5 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A escrow.pdf5 Apr 2024
Deviation Report with respect to Allotment letterFile: deviation report alloment.pdf5 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement.pdf5 Apr 2024
Layout approvalFile: narmadeshwar KDMC scan plan-1_11zon.pdf1 Apr 2024
Building plan approvalFile: narmadeshwar KDMC scan plan-1_11zon.pdf1 Apr 2024
Building plan approvalFile: 2nd page narmuuu.pdf1 Apr 2024
Building plan approvalFile: narmadeshwar KDMC scan plan-3_11zon.pdf1 Apr 2024
Building plan approvalFile: narmadeshwar KDMC scan plan-4_11zon.pdf1 Apr 2024
Building plan approvalFile: narmadeshwar KDMC scan plan-5_11zon.pdf1 Apr 2024
PAN CardFile: 1 PAN Card (17).pdf1 Apr 2024
Copy of the legal title reportFile: ilovepdf_merged (4)_11zon.pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: narmadeshwar KDMC scan plan-1_11zon.pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: narmadeshwar KDMC scan plan-1_11zon.pdf1 Apr 2024

How this compares with Thane

11%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NARMADESHWAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadeghar-Kalyan West7,600+ in Thane

2 kmNARMADESHWARCompleted 60Lapsed / revoked 33Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: ASHAPURA COMBINES

ASHAPURA COMBINES has 5 registrations on MahaRERA, including NEELKANTH SHRUSHTI and RAMESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NARMADESHWAR is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NARMADESHWAR?

The registered promoter entity is ASHAPURA COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NARMADESHWAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NARMADESHWAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NARMADESHWAR?

The professionals named in the filing: Architect: CREDIBLE DESIGNS DEEPAK PATIL; Engineer: Shanti Consultants; Engineer: AYENDRA VISANJI VIRA; Chartered Accountant: M K Ramani; Chartered Accountant: K H R & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NARMADESHWAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NARMADESHWAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NARMADESHWAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.