Home / Browse projects / Thane, Maharashtra / NARMADESHWAR
NARMADESHWAR
RG-MH-18088 · RERA P51700066563 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NARMADESHWAR is a Others project by ASHAPURA COMBINES in Thane, Maharashtra, registered with MahaRERA as P51700066563 on 11 Jun 2024. Possession is promised by 31 Dec 2030. 11 of the 101 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameNARMADESHWAR
- TypeOthers
- Location
- Wadeghar-Kalyan West
- Kalyan-Dombivali (M Corp.)
- Kalyan
- Thane
- 421301
- Pincode421301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700066563
- ReraGenie IDRG-MH-18088
Builder
- NameASHAPURA COMBINES
- Entity typePartnership
- PartnersVipul Harilal Patel, Mangesh Dashrath Gaikar, Harilal Nathu Patel, Ritesh Harilal Sanghani
- Other registrations4 more →
- Completed2 of 5
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings1 building record
- Documents filed90 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NARMADESHWAR | NA | 23 | 23 | 85 | 16 | 101 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.
NARMADESHWAR: 29% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed226
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership105
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Gajanan Kalu Dalvi | Ghatkopar | Mumbai Suburban |
| Santosh Gajanan Dalvi | Ghatkopar | Mumbai Suburban |
| Ramesh Kalu Dalvi | Ghatkopar | Mumbai Suburban |
| Kamlabai Vaman Patil | Ghatkopar | Mumbai Suburban |
| Ujjwala Vilas Mirkute | Ghatkopar | Mumbai Suburban |
| Rakesh Manohar Konkar | Ghatkopar | Mumbai Suburban |
| Umesh Manohar Konkar | Ghatkopar | Mumbai Suburban |
| Sunita Shankar Pawar | Ghatkopar | Mumbai Suburban |
| Sandesh Gajanan Dalvi | Ghatkopar | Mumbai Suburban |
| Sandeep Gajanan Dalvi | Ghatkopar | Mumbai Suburban |
| Suresh Kalu Dalvi | Ghatkopar | Mumbai Suburban |
| Sanjay Suresh Dalvi | Ghatkopar | Mumbai Suburban |
| Bhagabai Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Vishnu Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Laxmi Vishnu Shelar | Ghatkopar | Mumbai Suburban |
| Chandrakant Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Vandana Chandrakant Shelar | Ghatkopar | Mumbai Suburban |
| Ramesh Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Vithabai Ramesh Shelar | Ghatkopar | Mumbai Suburban |
| Gurunath Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Lilabai Gurunath Shelar | Ghatkopar | Mumbai Suburban |
| Bhagwan Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Subhadra Bhagwan Shelar | Ghatkopar | Mumbai Suburban |
| Krushna Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Sunanda Krushna Shelar | Ghatkopar | Mumbai Suburban |
| Sanjay Dashrath Shelar | Ghatkopar | Mumbai Suburban |
| Shubhangi Sanjay Shelar | Ghatkopar | Mumbai Suburban |
| Sharad Vishnu Shelar | Ghatkopar | Mumbai Suburban |
| Ratna Sharad Shelar | Ghatkopar | Mumbai Suburban |
| Rakesh Ramesh Shelar | Ghatkopar | Mumbai Suburban |
| Vasudev Gurunath Shelar | Ghatkopar | Mumbai Suburban |
| Mahesh Bhagwan Shelar | Ghatkopar | Mumbai Suburban |
| Nirmala Pandhari Patil | Ghatkopar | Mumbai Suburban |
| Sujata Haresh Bhoir | Ghatkopar | Mumbai Suburban |
| Rekha Balaram Patil | Ghatkopar | Mumbai Suburban |
| Lilabai Mahadu Gaikar | Ghatkopar | Mumbai Suburban |
| Suman Kanha Bhoir | Ghatkopar | Mumbai Suburban |
| Sulochana Prakash Kathe | Ghatkopar | Mumbai Suburban |
| Baliram Genu Shelar | Ghatkopar | Mumbai Suburban |
| Jaibai Baliram Shelar | Ghatkopar | Mumbai Suburban |
| Ramdas Baliram Shelar | Ghatkopar | Mumbai Suburban |
| Kanta Ramdas Shelar | Ghatkopar | Mumbai Suburban |
| Sunil Baliram Shelar | Ghatkopar | Mumbai Suburban |
| Kamla Sunil Shelar | Ghatkopar | Mumbai Suburban |
| Dilip Baliram Shelar | Ghatkopar | Mumbai Suburban |
| Shobha Vijay Bhoir | Ghatkopar | Mumbai Suburban |
| Sulbha Dnyaneshwar Mhatre | Ghatkopar | Mumbai Suburban |
| Kaluram Laxman Shelar | Ghatkopar | Mumbai Suburban |
| Durga Kaluram Shelar | Ghatkopar | Mumbai Suburban |
| Vijay Laxman Shelar | Ghatkopar | Mumbai Suburban |
| Sangeeta Vijay Shelar | Ghatkopar | Mumbai Suburban |
| Milind Kaluram Shelar | Ghatkopar | Mumbai Suburban |
| Pappi Milind Shelar | Ghatkopar | Mumbai Suburban |
| Yogesh Kaluram Shelar | Ghatkopar | Mumbai Suburban |
| Sarika Kaluram Shelar | Ghatkopar | Mumbai Suburban |
| Suresh Sharad Shelar | Ghatkopar | Mumbai Suburban |
| Parvatibai Sudam Patil | Ghatkopar | Mumbai Suburban |
| Nanda Manik Patil | Ghatkopar | Mumbai Suburban |
| Dhanibai Shankar Shelar | Ghatkopar | Mumbai Suburban |
| Gangubai Abhimanyu Shelar | Ghatkopar | Mumbai Suburban |
| Yashwant Shankar Shelar | Ghatkopar | Mumbai Suburban |
| Geeta Yashwant Shelar | Ghatkopar | Mumbai Suburban |
| Usha Vishnu Mhatre | Ghatkopar | Mumbai Suburban |
| Sudha Madhukar Thakre | Ghatkopar | Mumbai Suburban |
| Jankubai Pandurang Bhandari | Ghatkopar | Mumbai Suburban |
| Nagubai Namdeo Karbhari | Ghatkopar | Mumbai Suburban |
| Radhabai Ananta Patil | Ghatkopar | Mumbai Suburban |
| Laxman Govind Madhavi | Ghatkopar | Mumbai Suburban |
| Chaya Laxman Madhavi | Ghatkopar | Mumbai Suburban |
| Ramchandra Govind Madhavi | Ghatkopar | Mumbai Suburban |
| Sangeeta Ramchandra Madhavi | Ghatkopar | Mumbai Suburban |
| Lata Parshuram Pimple | Ghatkopar | Mumbai Suburban |
| Manglya Alias Mangesh Vitthal Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Sangeeta Mangesh Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Aavish Alias Avinash Vitthal Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Vandana Avinash Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Nirabai Alias Nirmala Mangaldas Patil | Ghatkopar | Mumbai Suburban |
| Kantibai Alias Kanta Prakash Kene | Ghatkopar | Mumbai Suburban |
| Pandabai Alias Sumitra Dinkar Naik | Ghatkopar | Mumbai Suburban |
| Heerabai Baban Naik | Ghatkopar | Mumbai Suburban |
| Harshal Baban Naik | Ghatkopar | Mumbai Suburban |
| Prakash Baban Naik | Ghatkopar | Mumbai Suburban |
| Fashibai Eknath Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Haresh Eknath Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Anita Haresh Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Sharad Eknath Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Lalita Sharad Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Sharmila Barku Alias Barkya Kharbe | Ghatkopar | Mumbai Suburban |
| Bhagirthi Alias Bhagubai Vandar Madhavi | Ghatkopar | Mumbai Suburban |
| Gulab Kaluram Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Naresh Kaluram Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Asha Naresh Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Vidhya Naresh Tiwari | Ghatkopar | Mumbai Suburban |
| Lata Bharat Chaudhari | Ghatkopar | Mumbai Suburban |
| Kavita Pramod Mhatre | Ghatkopar | Mumbai Suburban |
| Janabai Ramchandra Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Sham Ramchandra Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Usha Sham Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Rajesh Sham Naik | Ghatkopar | Mumbai Suburban |
| Dipti Sham Naik | Ghatkopar | Mumbai Suburban |
| Vasudev Ramchandra Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Lata Vasudev Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Heerabai Yashwant Naik Alias Vanjurkar | Ghatkopar | Mumbai Suburban |
| Laxmibai Alias Pramila Sudarshan Chaudhari | Ghatkopar | Mumbai Suburban |
| Nirmala Satyavan Patil | Ghatkopar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NARMADESHWAR | NA | Rs 1.50 cr | - |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CREDIBLE DESIGNS DEEPAK PATIL |
| Engineer | Shanti Consultants |
| Engineer | AYENDRA VISANJI VIRA |
| Chartered Accountant | M K Ramani |
| Chartered Accountant | K H R & CO |
| Partner | Role in project |
|---|---|
| ASHAPURA COMBINES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Arch Cert Narmadeshwar.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate (2).pdf | 20 Jun 2026 |
| Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 31-03-2025-NDL.pdf | 3 Jun 2026 |
| Form 2File: ns- form 2 -as on 31-3-25- dl.pdf | 3 Jun 2026 |
| Form 3File: ns-from 3- as on 31-3-25- dl.pdf | 3 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: ns- sold inv- as on 31-3-25-dl.pdf | 3 Jun 2026 |
| Form 2A (FY 2025-2026)File: ENGINEER CERTIFICATE NARMADESHWAR 31-3-26.pdf | 30 Apr 2026 |
| Form 1File: FORM -1 NARMADESHWAR ARCHITECT CERTIFICATE 31-3-26.pdf | 29 Apr 2026 |
| Form 2File: FORM- 2 ENGINEER CERTIFICATE NARMADESHWAR 31-3-26.pdf | 29 Apr 2026 |
| Form 3File: Form 3 - Narmadeshwar -31-3-26.pdf | 29 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY- ND - 31-3-26.pdf | 29 Apr 2026 |
| Form 1File: 1 Architect Certificate 31-12-2025.pdf | 27 Jan 2026 |
| Form 2File: 2 ENGINEER Certificate 31-12-2025.pdf | 27 Jan 2026 |
| Form 3File: 3 Form 3 - Narmadeshwar - Scan copy.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 27 Jan 2026 |
| Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 30-9-25.pdf | 13 Nov 2025 |
| Form 2File: NARMADESHWAR ENGINEER CERTIFICATE 30-9-25.pdf | 13 Nov 2025 |
| Form 3File: ND-Form-3 as on 30-9-25.pdf | 13 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Narmadeshwar-Sold Unsold Inventory Details.pdf | 13 Nov 2025 |
| Form 2A (FY 2024-2025)File: NARMADESHWAR ENGINEER CERTIFICATE 31-3-25.pdf | 26 Sep 2025 |
| Form 5 (FY 2024-2025)File: Narmadeshwar - Form 5-YR-2024-25.pdf | 26 Sep 2025 |
| Form 1File: NARMADESHWAR ARCHITECT CERTIFICATE 30-6-25.pdf | 11 Sep 2025 |
| Form 2File: NARMADESHWAR ENGINEER CERTIFICATE 30-6-25.pdf | 11 Sep 2025 |
| Form 3File: ND- Form 3-dt30-6-25.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Narmadeshwar- Inventory Details-30-6-25.pdf | 11 Sep 2025 |
| Disclosure of sold/ booked inventoryFile: NARMADESHWAR SOLD INVENTORY 31-3-25.pdf | 12 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NARMADESHWAR ENGINEER CERTIFICATE 31-3-25.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5th Form 3 - Narmadeshwar -31-3-25 (1).pdf | 6 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NARMADESHWAR ENGINEER CERTIFICATE 31-03-2025.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: NARMADESHWAR SOLD LIST 31-12-24.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4-th- Form3 -31-12-24-SIGNED.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE NAMADESHWAR 31-12-24.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE NARMADESHWAR 31-12-24.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2-ND - Form3 -30-6-24-SIGNED.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-ND- Form 3 -22-10-24-SIGNED_compressed.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-ENGINEER CERTIFICATE NARMSDESHWAR 1-7-24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-ENGINEER CERTIFICATE NARMADESHWAR 1-10-24.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19-12-24-ARCHITECT CERTIFICATE NARMADESHWAR-AS ON 30-09-24.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NARMADESHWAR ARCHITECT CERTIFICATE 30-06-24.pdf | 19 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development (11).pdf | 27 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: format D (1).pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Narmadeshwar.pdf | 27 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf | 27 May 2024 |
| Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development (9).pdf | 25 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: APPENDIX F for NARMADESHWAR building.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (2).pdf | 19 Apr 2024 |
| Proforma of Agreement for saleFile: AFS_Narmdeshwar_Ashapura Combines_29032024.pdf | 19 Apr 2024 |
| Proforma of Allotment letterFile: AL_Narmdeshwar_Ashapura Combines_29032024.pdf | 19 Apr 2024 |
| Other - TechnicalFile: 1 Other - Technical (20).pdf | 19 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (7).pdf | 6 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (4).pdf | 5 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE legal.pdf | 5 Apr 2024 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (4).pdf | 5 Apr 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE legal.pdf | 5 Apr 2024 |
| Declaration about Commencement CertificateFile: DECLARATION c c.pdf | 5 Apr 2024 |
| Declaration in FORM BFile: FORM B ASHAPURA COMBINES.pdf | 5 Apr 2024 |
| CERSAI detailsFile: 1 CERSAI details (4).pdf | 5 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A escrow.pdf | 5 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: deviation report alloment.pdf | 5 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement.pdf | 5 Apr 2024 |
| Layout approvalFile: narmadeshwar KDMC scan plan-1_11zon.pdf | 1 Apr 2024 |
| Building plan approvalFile: narmadeshwar KDMC scan plan-1_11zon.pdf | 1 Apr 2024 |
| Building plan approvalFile: 2nd page narmuuu.pdf | 1 Apr 2024 |
| Building plan approvalFile: narmadeshwar KDMC scan plan-3_11zon.pdf | 1 Apr 2024 |
| Building plan approvalFile: narmadeshwar KDMC scan plan-4_11zon.pdf | 1 Apr 2024 |
| Building plan approvalFile: narmadeshwar KDMC scan plan-5_11zon.pdf | 1 Apr 2024 |
| PAN CardFile: 1 PAN Card (17).pdf | 1 Apr 2024 |
| Copy of the legal title reportFile: ilovepdf_merged (4)_11zon.pdf | 1 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: narmadeshwar KDMC scan plan-1_11zon.pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: narmadeshwar KDMC scan plan-1_11zon.pdf | 1 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NARMADESHWAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadeghar-Kalyan West7,600+ in Thane
Filed coordinates, straight-line distance. 183 registered projects within 2 km.
PODDAR RIVIERA PHASE - I
Poddar Housing and Development Limited
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
See every Thane project, with the district possession charts
Builder: ASHAPURA COMBINES
ASHAPURA COMBINES has 5 registrations on MahaRERA, including NEELKANTH SHRUSHTI and RAMESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NARMADESHWAR is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NARMADESHWAR?
The registered promoter entity is ASHAPURA COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NARMADESHWAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NARMADESHWAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NARMADESHWAR?
The professionals named in the filing: Architect: CREDIBLE DESIGNS DEEPAK PATIL; Engineer: Shanti Consultants; Engineer: AYENDRA VISANJI VIRA; Chartered Accountant: M K Ramani; Chartered Accountant: K H R & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NARMADESHWAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback