NARENDRA HOUSING SOCIETY
By ELITE INFRASTRUCTURE PVT LTD
RG-MH-54330 · RERA P52100050494 · Last updated on MahaRERA portal: 8 Apr 2026
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NARENDRA HOUSING SOCIETY is a Residential / Group Housing project by ELITE INFRASTRUCTURE PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100050494 on 17 Apr 2023. The registration is recorded completed; possession was promised by 1 Sep 2026. The completion date has moved by 12 months from the original filing. 26 of the 29 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameNARENDRA HOUSING SOCIETY
- TypeResidential / Group Housing
- Location
- SENAPATI BAPAT ROAD
- SHIVAJINAGAR
- Pune (M Corp.)
- Pune City
- Pune
- 411016
- Pincode411016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050494
- ReraGenie IDRG-MH-54330
Builder
- NameELITE INFRASTRUCTURE PVT LTD
- Entity typeCompany
- CINU45200PN2009PTC134223
- DirectorsVINOD PURUSHOTTAM PATIL, PARIMAL PRAMOD PATIL, PRAMOD PURUSHOTTAM PATIL
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Apr 2023
- Promised completion1 Sep 2026
- Revised completionRevised to 1 Sep 2026 (originally 1 Sep 2025)
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 8 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NARENDRA | NA | 8 | 7 | 29 | 0 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
NARENDRA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Narendra Co Operative Housing Society Limited | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NARENDRA | NA | Rs 10.72 cr | Rs 10.83 cr |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PI consultants |
| Engineer | Parimal Patil |
| Engineer | GA Bhilare Consultants Pvt Ltd |
| Chartered Accountant | AA Deshpande & Associates |
| Partner | Role in project |
|---|---|
| ELITE INFRASTRUCTURE PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWAITING FINAL INSPECTIONS FROM THE PUNE MUNICIPAL CORPORATION & THE IGBC GREEN BUILDING CERTIFICATION TEAM
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500129 | Ram Gawali | ELITE INFRASTRUCTURE PVT LTD | 09/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Q4 2025 .pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q4 2025 .pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: Form-3 4thQ 2025.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: Form-3 4thQ 2025.pdf | 8 Apr 2026 |
| Occupational CertificateFile: Narendra Completion 2026.pdf | 7 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q3 2025 .pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q3 2025 .pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form-3 Narendra Housing Society.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certifcate Q2 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 Narendra Housing Society.pdf | 10 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Rera Q1 24-25.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certifcate 1st Quarter 2024 .pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Rera Q1 24-25.pdf | 4 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certifcate Q4 2024.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate Q4 2024.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate Q4 2024.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificare Q3 2024.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate Q3 2024.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate Q3 2024.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 2nd Quarter 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 Architect's RERA 2024.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 CA RERA Form 3 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 Architect's RERA 2024.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 CA RERA Form 3 2024.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 2nd Quarter 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certifcate 1st Quarter 2024.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 1st Quarter 2024 .pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE 1st Quarter 2024.pdf | 9 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Report Q4.pdf | 6 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 4th Quarter.pdf | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory April 2024.pdf | 6 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NARENDRA RERA CA Certificate 4th Q.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect.pdf | 6 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 3rd Quarter.pdf | 6 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 DEC 2023.pdf | 3 Jan 2024 |
| Building plan approvalFile: 1 of 4 .pdf | 16 Dec 2023 |
| Building plan approvalFile: 1 of 4 .pdf | 16 Dec 2023 |
| Building plan approvalFile: 2 of 4 .pdf | 16 Dec 2023 |
| Building plan approvalFile: 3 of 4.pdf | 16 Dec 2023 |
| Building plan approvalFile: 4 of 4.pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 of 4 .pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 of 4 .pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 of 4 .pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 of 4.pdf | 16 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 of 4.pdf | 16 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 1761.pdf | 16 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EEPL.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect's application.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certifcate 3rd Quarter 2023.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite Infra (1).pdf | 22 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT JULY 2023.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate EIPL (2).pdf | 8 Aug 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 23 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE VPP.pdf | 11 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE PPP.pdf | 11 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf | 11 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances.pdf | 9 Mar 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrances.pdf | 9 Mar 2023 |
| Proforma of Agreement for saleFile: BOOKING AGR-Narendra CHS.pdf | 9 Mar 2023 |
| Copy of the legal title reportFile: LEGAL REPORT.pdf | 4 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation ps.pdf | 4 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK ACCOUNT.pdf | 3 Mar 2023 |
| Declaration in FORM BFile: form b builder declaration.pdf | 2 Mar 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER NARENDRA RERA FORMAT.pdf | 1 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf | 1 Mar 2023 |
| Status of ConveyanceFile: CONVEYANCE STATUS.pdf | 1 Mar 2023 |
| Layout approvalFile: GROUND.pdf | 23 Feb 2023 |
| Building plan approvalFile: 1 2 3 4 FLOOR.pdf | 23 Feb 2023 |
| Building plan approvalFile: SECTION.pdf | 23 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: GROUND.pdf | 23 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 2 3 4 FLOOR.pdf | 23 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SECTION.pdf | 23 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf | 23 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTR.pdf | 23 Feb 2023 |
| Declaration about Commencement CertificateFile: Commencement Declaration EIPL.pdf | 13 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
Keep NARENDRA HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVAJINAGAR13,700+ in Pune
KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED
M/S FORTUNE DEVELOPERS
VB FOREST CASTLE BY ASCENT LANDMARKS
ASCENT LANDMARKS LLP
TEJ MAYURBAN
TEJRAJ PROFILE INFRA LLP
The Luxe Towers - Building I and J
Neelsidhi Mohar Raisoni Developers LLP
TEJ MIDTOWN
TEJRAJ GANPATRAO PATIL
Bellagio Courtyards
MICHELNGELO LLP
Builder: ELITE INFRASTRUCTURE PVT LTD
ELITE INFRASTRUCTURE PVT LTD has 1 registration on MahaRERA, including NARENDRA HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NARENDRA HOUSING SOCIETY is delayed beyond 1 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NARENDRA HOUSING SOCIETY?
The registered promoter entity is ELITE INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U45200PN2009PTC134223 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NARENDRA HOUSING SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NARENDRA HOUSING SOCIETY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NARENDRA HOUSING SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NARENDRA HOUSING SOCIETY?
The professionals named in the filing: Architect: PI consultants; Engineer: Parimal Patil; Engineer: GA Bhilare Consultants Pvt Ltd; Chartered Accountant: AA Deshpande & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NARENDRA HOUSING SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback