Home / Browse projects / Thane, Maharashtra / NARAYANI DHAM BUILDING NO 1A
NARAYANI DHAM BUILDING NO 1A
RG-MH-98688 · RERA P51700017817 · Last updated on MahaRERA portal: 9 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NARAYANI DHAM BUILDING NO 1A is a Others project by MAYA DEVELOPER in Thane, Maharashtra, registered with MahaRERA as P51700017817 on 17 Sep 2018. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameNARAYANI DHAM BUILDING NO 1A
- TypeOthers
- Location
- BHADWAD
- BHIWANDI
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- RERA no.P51700017817
- ReraGenie IDRG-MH-98688
Builder
- NameMAYA DEVELOPER
- Entity typePartnership
- GSTIN27ABDFM4546P1ZP
- PartnersSHAMIM AHMAD ABDUL MANNAN KHAN, VINOD RAMDUTT DWIVEDI
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Sep 2018
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 31 Dec 2026)
- Buildings1 building record
- Documents filed171 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NARAYANI DHAM BUILDING NO 1 A | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 55%.
NARAYANI DHAM BUILDING NO 1 A: 5% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 55% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| HANUMAN TARE | Bhiwandi (M Corp.) | Thane |
| NARAYANI ASSOCIATES | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHAMIM AHMAD ABDUL MANNAN KHAN |
| Engineer | SHAMIM AHMAD ABDUL MANNAN KHAN |
| Chartered Accountant | MUKESH S SONI |
| Partner | Role in project |
|---|---|
| MAYA DEVELOPER | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHIS PROJECT IS UNDER PMAY SCHEME WHICH WAS APPROVED BY COMPETENT AUTHORITY ON 31/03/2022 AND SHOULD BE COMPLETED WITHIN 5 YEARS FROM DATE OF APPROVAL. WE HAVE STARTED CONSTRUCTION WORK IN MARCH 2023 HENCE, IT WILL TAKE US 12 MORE MONTHS TO COMPLETE THIS PROJECT.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed171
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 1A - Form 1_001.pdf | 9 May 2026 |
| Form 2File: 1A - Form 2_001.pdf | 9 May 2026 |
| Form 3File: 1A - Form 3_001.pdf | 9 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DISCLOSURE.pdf | 9 May 2026 |
| Form 1File: 1A - Form - 1.pdf | 19 Feb 2026 |
| Form 2File: 1A - Form - 2.pdf | 19 Feb 2026 |
| Form 3File: 1A - Form - 3.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: discl for sold unsodl - sept 25 - signed.pdf | 19 Feb 2026 |
| Form 1File: 1A - Form - 1.pdf | 19 Feb 2026 |
| Form 2File: 1A - Form - 2.pdf | 19 Feb 2026 |
| Form 3File: 1A - Form - 3.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: discl for sold unsold - dec 25 - signed.pdf | 19 Feb 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - MAYA 1A - MAR 25.pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: form 3 - maya 1a - mar 25_11zon.pdf | 22 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAYA 1A - FORM 2 - MAR 25.pdf | 22 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MAYA 1A - DISCL SOLD UNSOLD.pdf | 22 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: MAYA 1A- FORM 5 - FY 24-25.pdf | 22 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC 2024 FORM 1 1A.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: DEC 2024 1A FORM 3_11zon.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 2024 FORM 2 1A.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- JUNE 24- BUILDING 1A.pdf | 19 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- SEPT 24- BUILDING 1A.pdf | 19 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3- JUNE 24- BUILDING 1A_11zon.pdf | 19 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3- SEPT 24- BUILDING 1A_11zon.pdf | 19 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- JUNE 24- BUILDING 1A.pdf | 19 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- SEPT 24- BUILDING 1A.pdf | 19 Dec 2024 |
| Declaration in FORM BFile: FORM B 1A PROMOTER.pdf | 12 Jun 2024 |
| Declaration in FORM BFile: FORM B LANDLORD BLDG 1A TARE.pdf | 12 Jun 2024 |
| Declaration in FORM BFile: FORM B LANDLORD 1A.pdf | 12 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 ARCHITECT CERTIFICATE BLDG 1A.pdf | 23 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 ENGINEERS CERTIFICATE BLDG 1A.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - FY 23-24 BLDG 1A.pdf | 23 May 2024 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 24 BLDG 1A_11zon.pdf | 23 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5- FY 23-24 BLG 1A.pdf | 23 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 22-23 BLDG NO 1A.pdf | 7 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1___ARCHITECT_CERTIFICATE__1-A DEC 23.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2___ENGINEERS_CERTIFICATE__1-A DEC 23.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FORM 3 1A DEC 23.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLDG 1A SEPT 2023.pdf | 11 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 BLDG 1A SEPT 23.pdf | 11 Dec 2023 |
| Certificates of CA (Form 3)File: FORM 3BLDG 1A SEPT23.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1A FORM 1 ARCHITECHT CERTIFICATE (1).pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1A Form - ENGINEER CERTIFICATE (1).pdf | 13 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1A QUALITY ASSURANCE CERIFICATE (1).pdf | 13 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 BUILDING 1A COMPRESSED JUNE 23.pdf | 13 Sep 2023 |
| Other - TechnicalFile: 13986-2022 Sale Deed_001-compressed_11zon (1).pdf | 7 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 (1A)_1_11zon.pdf | 25 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 (1A)_2_11zon.pdf | 25 May 2023 |
| Certificates of CA (Form 3)File: FROM 3 MARCH 236-1A_4_11zon.pdf | 25 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf | 25 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A'-SEPARATE BANK ACCOUNT 1A.pdf | 15 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLG 1A.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 NEW 1A_11zon_merged_compressed.pdf | 11 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD BLDG 1.pdf | 7 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 NEW 1A_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: NEW DEVLOPMENT DT 10-3-22 - 1_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: NEW DEVLOPMENT DT 10-3-22 - 2_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: NEW DEVLOPMENT DT 10-3-22 - 3_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: LAND PURCHASE AGREEMENT LATEST 4-10-22 1_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: 29-12-2021 - 1_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: 29-12-2021 - 2_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: 29-12-2021 - 3_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: 29-12-2021 - 4_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: form b Affidavit_Narayani_Associates_-_1A_11zon.pdf | 3 Feb 2023 |
| Other - LegalFile: form b Affidavit_Pradip_Tare__-_1A001_11zon.pdf | 3 Feb 2023 |
| Other - TechnicalFile: MAJOR CHANGES COMPRES.pdf | 3 Feb 2023 |
| Layout approvalFile: MAYA LAYOUT SHEET NO 1 - 1.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 1 - 11 COLOUR_11zon.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 2 - 11 - - - _compressed.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 3 - 11.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 4 - 11.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 5 - 11.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 6 - 11 - - -_compressed.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 7 - 11 - - -_compressed.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 8 - 11.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 9 - 11.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 10 - 11 - - - _compressed.pdf | 2 Feb 2023 |
| Building plan approvalFile: MAYA PER SHEET 11 - 11 - - - _compressed.pdf | 2 Feb 2023 |
| Copy of the legal title reportFile: TITLE REPORT_11zon.pdf | 2 Feb 2023 |
| Copy of the legal title reportFile: pooja 2_11zon.pdf | 2 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 171 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NARAYANI DHAM BUILDING NO 1A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: MAYA DEVELOPER
MAYA DEVELOPER has 3 registrations on MahaRERA, including NARAYANI DHAM BUILDING NO 2A AND 2B and NARAYANI DHAM BUILDING NO 1 B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NARAYANI DHAM BUILDING NO 1A is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NARAYANI DHAM BUILDING NO 1A?
The registered promoter entity is MAYA DEVELOPER, a partnership as per the filing. Its GSTIN 27ABDFM4546P1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NARAYANI DHAM BUILDING NO 1A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NARAYANI DHAM BUILDING NO 1A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NARAYANI DHAM BUILDING NO 1A?
The professionals named in the filing: Architect: SHAMIM AHMAD ABDUL MANNAN KHAN; Engineer: SHAMIM AHMAD ABDUL MANNAN KHAN; Chartered Accountant: MUKESH S SONI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NARAYANI DHAM BUILDING NO 1A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback