NANGRAI ENCLAVE

By JITU BUILDCON LLP

RG-MH-23105 · RERA P52100033351 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

NANGRAI ENCLAVE is a Others project by JITU BUILDCON LLP in Pune, Maharashtra, registered with MahaRERA as P52100033351 on 16 Feb 2022. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 15 months from the original filing.

At a glance

Project

  • NameNANGRAI ENCLAVE
  • TypeOthers
  • Location
    • NANGARGAON VALVAN ROAD
    • NANGARGAON
    • Lonavala (M Cl)
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033351
  • ReraGenie IDRG-MH-23105

Builder

  • NameJITU BUILDCON LLP
  • Entity typePartnership
  • PartnersJITENDRA SUHAS NAGESH, MANGESH PRASHANT PADHYE, SUHAS VASANTRAO NAGESH

Key dates

28 months past promisethis monthRegisteredFeb 2022First promiseMar 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Feb 2022
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Mar 2023)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE ANA40000
TYPE A1NA40000
TYPE BNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

TYPE A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
TYPE A11
TYPE A111

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANKUSH SHANKAR DURGELonavala (M Cl)Pune

Approvals and building plan

Permissible FSI1068.42
Proposed, not sanctioned1,068 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDUSTRIAL ESTATE NANGARGAON LONAVAL 410401

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGESH SHIVA
EngineerPAVAN VIKAS JOSHI
Chartered AccountantR S JOSHI
PartnerRole in project
JITU BUILDCON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018925Mar 2023 → Jun 2024

Reason as filed by the promoterINTERNAL CHANGES SUGGESTED BY CUSTOMER AND SOME EXTERNAL WORKS ARE PENDING

EXT52100015322Mar 2023 → Dec 2023

Reason as filed by the promoterInternal Changes as per clients requirement ,

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular Form.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf7 Feb 2024
Declaration in FORM BFile: affidavit rera form.pdf30 Jan 2024
Declaration in FORM BFile: decalration for extension NE.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: id_000132.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (1).pdf6 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Format-B Nangarai enclave.pdf9 May 2023
Commencement Certificates / NA Order for plotted developmentFile: nangrai CC Extension.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 update.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance Nangarai enclave 20-21.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: quality assurance Nangarai enclave 21-22.pdf9 May 2023
Disclosure of sold/ booked inventoryFile: Format-B Nangarai enclave.pdf9 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf9 May 2023
Proforma of Agreement for saleFile: AGREEMNT RERA NANGARGAON.pdf9 May 2023
Proforma of Agreement for saleFile: AGREEMENT 2.pdf9 May 2023
Proforma of Allotment letterFile: ALLOTMENT NANGARGAON.pdf9 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 nangrai.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 nangrai.pdf24 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 LLP.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 nangrai.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 nangrai.pdf8 Apr 2023
Building plan approvalFile: row house.pdf10 Feb 2022
Building plan approvalFile: row house.pdf10 Feb 2022
Layout approvalFile: row house.pdf10 Feb 2022
Copy of Layout Approval (in case of layout)File: row house.pdf10 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: row house.pdf10 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: row house.pdf10 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: durge project CC_compressed.pdf10 Feb 2022
Proforma of Allotment letterFile: blank allotment letter.pdf9 Feb 2022
Copy of the legal title reportFile: ADVOCATE LETTER.pdf7 Feb 2022
Declaration about Commencement CertificateFile: format - d.pdf7 Feb 2022
Proforma of Allotment letterFile: dummy agreement to sale_compressed-1-14.pdf4 Feb 2022
Proforma of Allotment letterFile: dummy agreement to sale_compressed-15-27.pdf4 Feb 2022
Details of encumbrancesFile: declaration of non encumbrances.pdf27 Jan 2022
Declaration in FORM BFile: affidavat cum declaration durge project.pdf27 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jjoshi sir certificate.pdf27 Jan 2022
PAN CardFile: jitubuildcon llp pan card.pdf24 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228671507_For_Asset_Based_Search_24_01_2022_17_42_27_701.pdf24 Jan 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 15 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANGRAI ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NANGARGAON13,700+ in Pune

2 kmNANGRAI ENCLAVECompleted 3Lapsed / revoked 2Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: JITU BUILDCON LLP

JITU BUILDCON LLP has 1 registration on MahaRERA, including NANGRAI ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that NANGRAI ENCLAVE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NANGRAI ENCLAVE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANGRAI ENCLAVE?

The registered promoter entity is JITU BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANGRAI ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANGRAI ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANGRAI ENCLAVE?

The professionals named in the filing: Architect: YOGESH SHIVA; Engineer: PAVAN VIKAS JOSHI; Chartered Accountant: R S JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANGRAI ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANGRAI ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANGRAI ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.