NANDIGRAM

By YOGESH KISHOR MAHAJAN

RG-MH-90299 · RERA P51700049363 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 3 months past the filed date
  • Completion date moved by 16 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
13 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

NANDIGRAM is a Residential / Group Housing project by YOGESH KISHOR MAHAJAN in Thane, Maharashtra, registered with MahaRERA as P51700049363 on 7 Feb 2023. Possession was promised by 31 Jul 2026 and is now 3 months past that date. The completion date has moved by 16 months from the original filing. 1 of the 14 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNANDIGRAM
  • TypeResidential / Group Housing
  • Location
    • Kabe Road
    • Mahagiri Kharkar Ali
    • Thane
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049363
  • ReraGenie IDRG-MH-90299

Builder

  • NameYOGESH KISHOR MAHAJAN
  • Entity typeIndividual

Key dates

3 months past promisethis monthRegisteredFeb 2023First promiseMar 2025Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Feb 2023
  • Promised completion31 Jul 2026
  • Revised completionRevised to 31 Jul 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed128 files

Current status

7%1 of 14 units booked
89.5%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

A Building: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area370 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024

Approvals and building plan

Sanctioning authorityThane municipal Corporation
Permissible FSI1137.13
Proposed, not sanctioned1,114 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 2 Oasis Silve Opp Hotel Shiv Sagar Ram Maruti Road Thane West
Estimated costRs 5.47 cr
Cost incurredRs 4.89 cr
Work done89.48%
BuildingWingEstimatedIncurred
A BuildingNARs 5.47 crRs 4.89 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectScapes Architect planners
EngineerAdvent Consultants
Chartered AccountantKapure and Kapure Chartered Accountant
Chartered AccountantJ.R.Davda & Associates
PartnerRole in project
YOGESH KISHOR MAHAJAN-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA14052501126Mar 2025 → Dec 2025

Reason as filed by the promoterAs per the attachment

EA16022619845Mar 2025 → Jul 2026

Reason as filed by the promoterThe current facts of the case are being explained hereunder. As the registration is already expired, we are facing many operational difficulties including no advertisement. The main reason for the delay is pace of sales being lower than expected and thereby effecting the cash flows of the project. Lower than expected cash flows has in turn effected the pace of construction of the project thereby making it impossible to meet the scheduled due date 31/03/2025. It may be noted that till date we have only sold three flats out of 11 flats available for sale. In addition to poor cash flows, cost ove

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 RERA 31032026.pdf24 Jun 2026
Withdrawal Update Form 2File: Engineers certificate FORM 2 DTD 31032026_page-0001.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3 - nandigram 31032026_compressed.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf10 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf10 Feb 2026
Form 2A (FY 2024-2025)File: Form 2 A March 25.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf3 Jan 2026
Withdrawal Update Form 3File: Nandigram Form 3.pdf3 Jan 2026
Form 2A (FY 2022-2023)File: Form -2A - Nandigram.pdf3 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A 01042024.pdf3 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 - Nandigram March 2024.pdf3 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 - Nandigram March 2023_compressed.pdf3 Jan 2026
Form 5 (FY 2024-2025)File: Mr Yogesh Kishor Mahajan- Annual Report.pdf22 Dec 2025
Withdrawal Update Form 1File: Form 1 June 25.pdf30 Sep 2025
Withdrawal Update Form 2File: Engineers Certificate.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 - nandigram June 25.pdf30 Sep 2025
Form 1File: Form 1 March 25.pdf4 Jun 2025
Form 2File: Form 2 - March 25.pdf4 Jun 2025
Form 3File: Form 3 - nandigram March 25_compressed.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram March 25.pdf4 Jun 2025
Form 1File: Form 1 30062023.pdf27 May 2025
Form 2File: Form 2 30062023.pdf27 May 2025
Form 3File: Form 3 - nandigram June 2023_compressed.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30062023.pdf27 May 2025
Form 1File: Form 1 DTD 30092023.pdf27 May 2025
Form 2File: Form 2 DTD30092023.pdf27 May 2025
Form 3File: Form 3 Sep 23.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Dosclosure of Sold Booked Inventory DTD 30092023.pdf27 May 2025
Form 1File: Form 1 DTD 31122023.pdf27 May 2025
Form 2File: Form 2 DTD 31122023.pdf27 May 2025
Form 3File: Form 3 Dec 23.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory DTD 31122023.pdf27 May 2025
Form 1File: Form 1 March 24.pdf27 May 2025
Form 2File: Form 2 - March 2024.pdf27 May 2025
Form 3File: Form 3 - nandigram March 2024_compressed.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram March 24.pdf27 May 2025
Form 1File: Form 1 June 24.pdf27 May 2025
Form 2File: Form 2 - June 2024.pdf27 May 2025
Form 3File: Form 3 - nandigram June 2024.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram June 24.pdf27 May 2025
Form 1File: Form 1 sep 24.pdf27 May 2025
Form 2File: Form 2 Sep 24.pdf27 May 2025
Form 3File: Form 3 - nandigram Sep 2024.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram Sep 24.pdf27 May 2025
Form 1File: Form 1 Dec 24.pdf27 May 2025
Form 2File: Form 2 - Dec 2024.pdf27 May 2025
Form 3File: Form 3 Dec 24_compressed.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram Dec 24.pdf27 May 2025
Form 1File: Form 1 Dec 24.pdf27 May 2025
Form 2File: Form 2 - Dec 2024.pdf27 May 2025
Form 3File: Form 3 Dec 24_compressed.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory Nanadigram Dec 24.pdf27 May 2025
Form 1File: Form -1 Nandigram.pdf27 May 2025
Form 2File: Form -2 Nandigram.pdf27 May 2025
Form 3File: Form 3 - March 2023_compressed.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 31032023_page-0001.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - nandigram March 25_compressed.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 25.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Nanadigram March 25.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24_compressed.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Nanadigram Dec 24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - nandigram June 2024.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - nandigram Sep 2024.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Nanadigram June 24.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Nanadigram Sep 24.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Nandigram March 2024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sep 24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2024.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory Nanadigram March 24.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - nandigram March 2024_compressed.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 23.pdf2 Jul 2024

How this compares with Thane

7%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 16 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANDIGRAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahagiri Kharkar Ali, Thane7,600+ in Thane

2 kmNANDIGRAMCompleted 175Lapsed / revoked 63Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: YOGESH KISHOR MAHAJAN

YOGESH KISHOR MAHAJAN has 1 registration on MahaRERA, including NANDIGRAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that NANDIGRAM shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NANDIGRAM is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDIGRAM?

The registered promoter entity is YOGESH KISHOR MAHAJAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDIGRAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANDIGRAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDIGRAM?

The professionals named in the filing: Architect: Scapes Architect planners; Engineer: Advent Consultants; Chartered Accountant: Kapure and Kapure Chartered Accountant; Chartered Accountant: J.R.Davda & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDIGRAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDIGRAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDIGRAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.