Registration lapsed No litigation declared Residential / Group Housing project

NANDANVAN A1 A2

By RAJMUDRAVASTUNIRMANLLP

RG-MH-12038 · RERA P52700003504 · Last updated on MahaRERA portal: 16 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
4 of 11Construction stages donefurthest along: Staircases, 80%
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

NANDANVAN A1 A2 is a Residential / Group Housing project by RAJMUDRAVASTUNIRMANLLP in Satara, Maharashtra, registered with MahaRERA as P52700003504 on 5 Aug 2017. Possession was promised by 12 Jun 2025 and is now 16 months past that date. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NameNANDANVAN A1 A2
  • TypeResidential / Group Housing
  • Location
    • SH131
    • shivajinagar chowk
    • Khandala
    • Satara
    • 412802
  • Pincode412802
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700003504
  • ReraGenie IDRG-MH-12038

Builder

  • NameRAJMUDRAVASTUNIRMANLLP
  • Entity typeOthers
  • Named personSHASHANK NANAWARE
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion12 Jun 2025
  • Revised completionRevised to 12 Jun 2025 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1 A2NA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

A1 A2: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 16 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes10%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
COMMON AREA AND FACILITIESYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,476 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/S RISHINANDAN DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2069.35
Proposed, not sanctioned2,069 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2 A, ARORA TOWERS, 9 MOLEDINA ROAD, PUNE CAMP

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBASE ARCHITECTS
Chartered AccountantKUMUDINI PRAVIN CHAVAN
PartnerRole in project
RAJMUDRAVASTUNIRMANLLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700012657Dec 2021 → Dec 2023

Reason as filed by the promoterकोविड च्या परिस्थितीमुळे सदनिकेस ग्राहक व कामास लेबर, मटेरीअल मिळण्यास अडचणी येत होत्या तरी सदरच्या अडचणीन मुळे इमारतीचे काम पाहिजे तितक्या वेगाने झाले नाही त्यामुळे इमारतीचे काम पूर्ण करण्यास वेळ लागत आहे. आता सदरची सदनिका विक्री ची परिस्थिती सुधारली असून आज रोजी सदर इमारतीचे RCC व वीट बांधकाम पूर्ण झाले असून प्लास्टर चे काम चालू आहे

EXT52700019562Dec 2021 → Jun 2025

Reason as filed by the promoterThe only factor causing the delay was a lack of flat booking, which was impacting fund flows. It has since rutted out. The building is a 75% completed LIG Sector structure. According to PMAY Project Restrictions, EWS Building must be completed first, taking into account the EWS Building Completion Period, before LIG. To complete the building, we require an extension until 12/06/2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form_1_2026_Q1.pdf16 Feb 2026
Form 2File: Form 2_2026_Q1.pdf16 Feb 2026
Form 3File: FORM_3_2026_Q1.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold_Flats_3006.pdf16 Feb 2026
OthersFile: Completion.pdf16 Feb 2026
Form 1File: Form 1.pdf23 Jan 2026
Form 2File: Form 2.pdf23 Jan 2026
Form 3File: FORM_3_31 mar 2025_Q4.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold_Flats_3112.pdf23 Jan 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1 (1).pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1.pdf2 Apr 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q1.pdf26 Mar 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf26 Mar 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf26 Mar 2025
Declaration in FORM BFile: Form_B_Notarised.pdf18 Mar 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3_.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold_Flats.pdf18 Mar 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3_.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Discolsure of sold Booled Inventory.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold_Flats.pdf5 Mar 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf12 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf12 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: RERA_Designated_Bank_Account.pdf12 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_3_31 mar 2025_Q1.pdf12 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner Feb 6, 2025 3-26 PM.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_5_2024.pdf10 Feb 2025
CERSAI detailsFile: Cersai_Report.pdf6 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Amit_Pawar.pdf6 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Tejas Vasantrao Bhosale.pdf6 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2021_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2021_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q1.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q3.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q2.pdf4 Feb 2025
Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q1.pdf4 Feb 2025

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 42 months
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep NANDANVAN A1 A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near shivajinagar chowk1,100+ in Satara

2 kmNANDANVAN A1 A2Completed 1Lapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: RAJMUDRAVASTUNIRMANLLP

RAJMUDRAVASTUNIRMANLLP has 3 registrations on MahaRERA, including NANDANVAN A1 A2 and NANDANVAN WING C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that NANDANVAN A1 A2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NANDANVAN A1 A2 is delayed beyond 12 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDANVAN A1 A2?

The registered promoter entity is RAJMUDRAVASTUNIRMANLLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDANVAN A1 A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANDANVAN A1 A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDANVAN A1 A2?

The professionals named in the filing: Architect: BASE ARCHITECTS; Chartered Accountant: KUMUDINI PRAVIN CHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDANVAN A1 A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDANVAN A1 A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDANVAN A1 A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.