NANDANVAN A1 A2
RG-MH-12038 · RERA P52700003504 · Last updated on MahaRERA portal: 16 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 42 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NANDANVAN A1 A2 is a Residential / Group Housing project by RAJMUDRAVASTUNIRMANLLP in Satara, Maharashtra, registered with MahaRERA as P52700003504 on 5 Aug 2017. Possession was promised by 12 Jun 2025 and is now 16 months past that date. The completion date has moved by 42 months from the original filing.
At a glance
Project
- NameNANDANVAN A1 A2
- TypeResidential / Group Housing
- Location
- SH131
- shivajinagar chowk
- Khandala
- Satara
- 412802
- Pincode412802
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700003504
- ReraGenie IDRG-MH-12038
Builder
- NameRAJMUDRAVASTUNIRMANLLP
- Entity typeOthers
- Named personSHASHANK NANAWARE
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Aug 2017
- Promised completion12 Jun 2025
- Revised completionRevised to 12 Jun 2025 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed128 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 A2 | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.
A1 A2: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 7% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 16 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| COMMON AREA AND FACILITIES | Yes | 0% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S RISHINANDAN DEVELOPERS | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BASE ARCHITECTS |
| Chartered Accountant | KUMUDINI PRAVIN CHAVAN |
| Partner | Role in project |
|---|---|
| RAJMUDRAVASTUNIRMANLLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterकोविड च्या परिस्थितीमुळे सदनिकेस ग्राहक व कामास लेबर, मटेरीअल मिळण्यास अडचणी येत होत्या तरी सदरच्या अडचणीन मुळे इमारतीचे काम पाहिजे तितक्या वेगाने झाले नाही त्यामुळे इमारतीचे काम पूर्ण करण्यास वेळ लागत आहे. आता सदरची सदनिका विक्री ची परिस्थिती सुधारली असून आज रोजी सदर इमारतीचे RCC व वीट बांधकाम पूर्ण झाले असून प्लास्टर चे काम चालू आहे
Reason as filed by the promoterThe only factor causing the delay was a lack of flat booking, which was impacting fund flows. It has since rutted out. The building is a 75% completed LIG Sector structure. According to PMAY Project Restrictions, EWS Building must be completed first, taking into account the EWS Building Completion Period, before LIG. To complete the building, we require an extension until 12/06/2025
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed128
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form_1_2026_Q1.pdf | 16 Feb 2026 |
| Form 2File: Form 2_2026_Q1.pdf | 16 Feb 2026 |
| Form 3File: FORM_3_2026_Q1.pdf | 16 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold_Flats_3006.pdf | 16 Feb 2026 |
| OthersFile: Completion.pdf | 16 Feb 2026 |
| Form 1File: Form 1.pdf | 23 Jan 2026 |
| Form 2File: Form 2.pdf | 23 Jan 2026 |
| Form 3File: FORM_3_31 mar 2025_Q4.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold_Flats_3112.pdf | 23 Jan 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1 (1).pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q2.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q1.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q4.pdf | 7 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1.pdf | 2 Apr 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q1.pdf | 26 Mar 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf | 26 Mar 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf | 26 Mar 2025 |
| Declaration in FORM BFile: Form_B_Notarised.pdf | 18 Mar 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3_.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold_Flats.pdf | 18 Mar 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3_.pdf | 8 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold Booled Inventory.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold_Flats.pdf | 5 Mar 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf | 12 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf | 12 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: RERA_Designated_Bank_Account.pdf | 12 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_3_31 mar 2025_Q1.pdf | 12 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner Feb 6, 2025 3-26 PM.pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_5_2024.pdf | 10 Feb 2025 |
| CERSAI detailsFile: Cersai_Report.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Amit_Pawar.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Tejas Vasantrao Bhosale.pdf | 6 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2025_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2024_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2023_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2022_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2021_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2021_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2020_Q1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q3.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q2.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: FORM_3_31 mar 2019_Q1.pdf | 4 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 128 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NANDANVAN A1 A2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near shivajinagar chowk1,100+ in Satara
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
GOLDFIELDS
UNIVERSAL DEVELOPERS
Snehbhoomi
Pushkar Realty
HILL CREST PARK
LIMRA DEVELOPERS
Terra Nova
BHIMASHANKAR DEVELOPERS
Woodwinds Phase I
Alliance Vanashree Ventures
Vaarsahighland1
BHIMASHANKAR DEVELOPERS
See every Satara project, with the district possession charts
Builder: RAJMUDRAVASTUNIRMANLLP
RAJMUDRAVASTUNIRMANLLP has 3 registrations on MahaRERA, including NANDANVAN A1 A2 and NANDANVAN WING C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What does it mean that NANDANVAN A1 A2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NANDANVAN A1 A2 is delayed beyond 12 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NANDANVAN A1 A2?
The registered promoter entity is RAJMUDRAVASTUNIRMANLLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NANDANVAN A1 A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NANDANVAN A1 A2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NANDANVAN A1 A2?
The professionals named in the filing: Architect: BASE ARCHITECTS; Chartered Accountant: KUMUDINI PRAVIN CHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NANDANVAN A1 A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback