Home / Browse projects / Pune, Maharashtra / NANDAN PROBIZ

Completed No litigation declared Commercial project

NANDAN PROBIZ

By NANDAN ASSOCIATES

RG-MH-10247 · RERA P52100001376 · Last updated on MahaRERA portal: 22 May 2024

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 98%
6Complaints at MahaRERAon this registration
Jump to the 472 documents Report an error

NANDAN PROBIZ is a Commercial project by NANDAN ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100001376 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2024. The completion date has moved by 24 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NameNANDAN PROBIZ
  • TypeCommercial
  • Location
    • BALEWADI HIGH STREET
    • BALEWADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001376
  • ReraGenie IDRG-MH-10247

Builder

  • NameNANDAN ASSOCIATES
  • Entity typePartnership
  • PartnersSHAMKANT KESHAV KOTKAR, RAHUL ANIL KOTKAR
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseMar 2022Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion30 Mar 2024
  • Revised completionRevised to 30 Mar 2024 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed472 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NANDAN PROBIZNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

NANDAN PROBIZ: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 22 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
HVAC SYSTEMYes100%
CCTVYes0%

Parking filed1155

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,155
Closed/Covered1,141
Open Space14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,426 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17055.24
Proposed, not sanctioned17,055 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENT BHANDARKAR ROAD PUNE 411004

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM B CHOUDHARI ASSOCIATES
EngineerG A BHILARE CONSULTANTS PRIVATE LIMITED
Chartered AccountantCA SHWETA DOSHI
PartnerRole in project
NANDAN ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011773Mar 2022 → Mar 2023

Reason as filed by the promoterDue to Covid 19 Pandemic Situations, poor labour strength and non availability of material we couldn't complete the project in stipulated time, hence we require one more year to complet the project.

EXT52100015132Mar 2022 → Mar 2024

Reason as filed by the promoterDUE TO DELAY IN GETTING REVISED ENVIRONMENTAL CLEARANCE, CHANGE IN PLANNING NORMS AND ADDITION OF PARKING BUILDING SANCTION CONNECTING WITH THE SAME BUILDING

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC005000000043661Jaishri Vandan JainNandan Associates21/11/2019
CC005000000340679bipin mulikNandan Associates14/04/2024
CC12503609Sanjeev BhiseNANDAN ASSOCIATES10/10/2025
CC12600152NILKANTH RAMCHARAN RADENANDAN ASSOCIATES09/01/2026
CC12600368Udai Prakash DeolalNANDAN ASSOCIATES20/01/2026
CC12602984Pankaj Ghanshyam IngleNANDAN ASSOCIATES20/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2024

Documents filed472

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 472 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NP FORM 1 ARCHITECH CERTIFICATE Q4 MARCH 24.pdf13 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NP Form 2 Engineer Certificate Q4 MARCH24.pdf13 May 2024
Disclosure of sold/ booked inventoryFile: PROBIZ SOLD: UNSOLD DECLAARATION Q4 MAR 24.pdf13 May 2024
Certificates of CA (Form 3)File: NA FORM 3 Q4 2023-24.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Probiz Form 5 22-23.pdf26 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE_0001.pdf26 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PMC COMPLETION CERTIFICATE.pdf16 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCH CERTIFICATE (1).pdf16 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NP FORM 1 ARCHITECT CERTIFICATE Q3 23-24.pdf5 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NP FORM 2 ENGINEER CERTIFICATE Q3 23-24.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DECLARATION Q3 23-24.pdf5 Feb 2024
Certificates of CA (Form 3)File: NP FORM 3 CA CERTIFICATES Q3 23-24.pdf5 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NP Architect Certificate .pdf21 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NP Form 2 Engineer Certificate.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: NP SALES DECLARATIONpdf.pdf21 Nov 2023
Certificates of CA (Form 3)File: NP FORM 3 CA CERTIFICATES Q2 23-24.pdf21 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2 PROBIZ ARCHITECT CERTIFICATE.pdf8 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 PROBIZ ENGINEER CERTIFICATE.pdf8 Aug 2023
Disclosure of sold/ booked inventoryFile: Q2 PROBIZ SOLD UNSOLD DECLARATION.pdf8 Aug 2023
Certificates of CA (Form 3)File: NA_CA-CERTIFICATE_Q1-compressed.pdf8 Aug 2023
Layout approvalFile: 01.pdf4 Aug 2023
Building plan approvalFile: 01.pdf4 Aug 2023
Building plan approvalFile: 2_.pdf4 Aug 2023
Building plan approvalFile: 3.pdf4 Aug 2023
Building plan approvalFile: 04.pdf4 Aug 2023
Building plan approvalFile: 05.pdf4 Aug 2023
Building plan approvalFile: 06.pdf4 Aug 2023
Building plan approvalFile: 07.pdf4 Aug 2023
Building plan approvalFile: 08.pdf4 Aug 2023
Building plan approvalFile: 09.pdf4 Aug 2023
Building plan approvalFile: 10.pdf4 Aug 2023
Building plan approvalFile: 11.pdf4 Aug 2023
Building plan approvalFile: 12.pdf4 Aug 2023
Building plan approvalFile: 13.pdf4 Aug 2023
Building plan approvalFile: 14.pdf4 Aug 2023
Building plan approvalFile: 15.pdf4 Aug 2023
Building plan approvalFile: 16.pdf4 Aug 2023
Building plan approvalFile: 17.pdf4 Aug 2023
Building plan approvalFile: 18.pdf4 Aug 2023
Building plan approvalFile: 19.pdf4 Aug 2023
Building plan approvalFile: 20.pdf4 Aug 2023
Building plan approvalFile: 21.pdf4 Aug 2023
Building plan approvalFile: 22.pdf4 Aug 2023
Building plan approvalFile: 23.pdf4 Aug 2023
Building plan approvalFile: 24.pdf4 Aug 2023
Building plan approvalFile: 25.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 01.pdf4 Aug 2023
Building Plan Approval (IOD)File: 01.pdf4 Aug 2023
Building Plan Approval (IOD)File: 2_.pdf4 Aug 2023
Building Plan Approval (IOD)File: 3.pdf4 Aug 2023
Building Plan Approval (IOD)File: 04.pdf4 Aug 2023
Building Plan Approval (IOD)File: 05.pdf4 Aug 2023
Building Plan Approval (IOD)File: 06.pdf4 Aug 2023
Building Plan Approval (IOD)File: 07.pdf4 Aug 2023
Building Plan Approval (IOD)File: 08.pdf4 Aug 2023
Building Plan Approval (IOD)File: 09.pdf4 Aug 2023
Building Plan Approval (IOD)File: 10.pdf4 Aug 2023
Building Plan Approval (IOD)File: 11.pdf4 Aug 2023
Building Plan Approval (IOD)File: 12.pdf4 Aug 2023
Building Plan Approval (IOD)File: 13.pdf4 Aug 2023
Building Plan Approval (IOD)File: 14.pdf4 Aug 2023
Building Plan Approval (IOD)File: 15.pdf4 Aug 2023
Building Plan Approval (IOD)File: 16.pdf4 Aug 2023
Building Plan Approval (IOD)File: 17.pdf4 Aug 2023
Building Plan Approval (IOD)File: 18.pdf4 Aug 2023
Building Plan Approval (IOD)File: 19.pdf4 Aug 2023
Building Plan Approval (IOD)File: 20.pdf4 Aug 2023
Building Plan Approval (IOD)File: 21.pdf4 Aug 2023
Building Plan Approval (IOD)File: 22.pdf4 Aug 2023
Building Plan Approval (IOD)File: 23.pdf4 Aug 2023
Building Plan Approval (IOD)File: 24.pdf4 Aug 2023
Building Plan Approval (IOD)File: 25.pdf4 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf4 Aug 2023
Declaration about Commencement CertificateFile: Probiz Declaration CC.pdf4 Aug 2023
Details of encumbrancesFile: Affidavit Cum Declaration Form B 24052023.pdf2 Jun 2023
Details of encumbrancesFile: Declaration Cum Affidavit.pdf25 May 2023
Details of encumbrancesFile: Declaration Cum Affidavit.pdf25 May 2023
Details of encumbrances concerned to FinanceFile: Self Decla Encumberance.pdf25 May 2023
Details of encumbrances concerned to LegalFile: Self Decla Encumberance.pdf25 May 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NANDAN ACCURABALEWADI PUNE201CompletedDec 2015Mar 2012
NANDAN PROSPERABALEWADI PUNE 411045216CompletedAug 2013Mar 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANDAN PROBIZ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALEWADI13,700+ in Pune

2 kmNANDAN PROBIZCompleted 135Lapsed / revoked 55Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 320 registered projects within 2 km.

Builder: NANDAN ASSOCIATES

NANDAN ASSOCIATES has 4 registrations on MahaRERA, including NANDAN PROSPERA GOLD and NANDAN AMAIRA. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NANDAN PROBIZ is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDAN PROBIZ?

The registered promoter entity is NANDAN ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDAN PROBIZ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NANDAN PROBIZ?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NANDAN PROBIZ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDAN PROBIZ?

The professionals named in the filing: Architect: M B CHOUDHARI ASSOCIATES; Engineer: G A BHILARE CONSULTANTS PRIVATE LIMITED; Chartered Accountant: CA SHWETA DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDAN PROBIZ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDAN PROBIZ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDAN PROBIZ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.