Home / Browse projects / Pune, Maharashtra / NANCY HILLVIEW A-1

Registration lapsed Litigation declared Others project

NANCY HILLVIEW A-1

By M/S SARSAN AAWISHKAR PROPERTIES

RG-MH-91453 · RERA P52100046913 · Last updated on MahaRERA portal: 11 Sep 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 2 months past the filed date
  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
5 of 105Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

NANCY HILLVIEW A-1 is a Others project by M/S SARSAN AAWISHKAR PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100046913 on 20 Sep 2022. Possession was promised by 31 Aug 2026 and is now 2 months past that date. 100 of the 105 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNANCY HILLVIEW A-1
  • TypeOthers
  • Location
    • DP ROAD
    • BANER
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100046913
  • ReraGenie IDRG-MH-91453

Builder

  • NameM/S SARSAN AAWISHKAR PROPERTIES
  • Entity typePartnership
  • GSTIN27ACPFS9550E1ZM
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAHUL VILAS NAHATA, AMIN AMIRALI SOMJEE
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

2 months past promisethis monthRegisteredSep 2022PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Sep 2022
  • Promised completion31 Aug 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed96 files

Current status

95%100 of 105 units booked
104.9%Work done, per cost certificate

Figures as on 11 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A 1NA252184791
A 2NA231077
A 3NA91077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed337

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots337
Closed/Covered304
Open Space33
BuildingClosed/CoveredOpen SpaceTotal
A 111512127
A 269978
A 312012132

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,726 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI11253.86
Proposed, not sanctioned10,305 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOSWAL BANDHU SAMAJ BLDG ,OPP HOTEL SEVEN LOVESHANKAR SETH RDPUNEMAHARASHTRA411042
Estimated costRs 136.75 cr
Cost incurredRs 143.42 cr
Work done104.88%
BuildingWingEstimatedIncurred
A 1NARs 68.38 crRs 71.71 cr
-NARs 68.38 crRs 71.71 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIRISH DASNURKAR
Engineersanket kakde
Chartered Accountantkishnani
PartnerRole in project
M/S SARSAN AAWISHKAR PROPERTIES-

Litigation declared2

CaseCourtStatus
989/2016/2016Senior Civil Court PunePENDING
989/2016/2016Senior Civil Court PunePENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000228358MAMTA PANDURANG BORATEM/S SARSAN AAWISHKAR PROPERTIES THROGH ITS PARTNER MR.SANJAY BOOB03/03/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: A-1 q3.pdf11 Sep 2026
Withdrawal Update Form 1File: A-1 q4.pdf11 Sep 2026
Withdrawal Update Form 1File: A-1 q4.pdf11 Sep 2026
Withdrawal Update Form 1File: A-1 q1.pdf11 Sep 2026
Withdrawal Update Form 2File: A1 Form 2 Q 3_compressed.pdf11 Sep 2026
Withdrawal Update Form 2File: A1 Form 2 Q 4_compressed.pdf11 Sep 2026
Withdrawal Update Form 2File: A1 Form 2 Q 4_compressed.pdf11 Sep 2026
Withdrawal Update Form 2File: A1 Form 2 Q 1_compressed.pdf11 Sep 2026
Withdrawal Update Form 3File: Sarsan A1 DEC 25.pdf11 Sep 2026
Withdrawal Update Form 3File: Sarsan A1 MAR 26.pdf11 Sep 2026
Withdrawal Update Form 3File: Sarsan A1 MAR 26.pdf11 Sep 2026
Withdrawal Update Form 3File: Sarsan A1 MAR 26.pdf11 Sep 2026
Form 2A (FY 2025-2026)File: 2 A 2025-26.pdf11 Sep 2026
Form 2A (FY 2022-2023)File: 2 A 2022-23.pdf11 Sep 2026
Form 2A (FY 2023-2024)File: 2 A 2023-24.pdf11 Sep 2026
Form 2A (FY 2024-2025)File: 2 A 2024-25.pdf11 Sep 2026
Form 5 (FY 2023-2024)File: Form 5 A1 23 24.pdf11 Sep 2026
Form 5 (FY 2022-2023)File: From 5 Sarsan A1 22-23.pdf10 Sep 2026
Building plan approvalFile: 3-22.pdf28 Nov 2025
Building plan approvalFile: 4-22.pdf28 Nov 2025
Building plan approvalFile: 5-22.pdf28 Nov 2025
Building plan approvalFile: 6-22.pdf28 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 A1 24 25.pdf28 Nov 2025
Withdrawal Update Form 1File: A-1.pdf27 Nov 2025
Withdrawal Update Form 2File: A1-Engineer Certificate compressed.pdf27 Nov 2025
Withdrawal Update Form 3File: A1 CA Certificate _compressed.pdf27 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 Architect Certificate .pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A2-Engineer Certificate _compressed.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 Arch Certificate .pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1 ca.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Eng Certificate _compressed.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 Arch Certificate Q2.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1- CA Certificate Q2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 ENGG Q2.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1_Arch Certificate.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1 CA Certificate_compressed.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1_Eng Certificate .pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: A1 Tower Form 2A.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 Form B Arch Certificate.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Eng Certificate .pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A1 final signed_compressed.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: A1 2A.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5 Sarsan A1 22-23.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate A-1.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Engg certificate q3 23 24.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1 CA Certificate q3 23 24 123.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1 CA Certificate .pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate .pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Letter .pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera certificate A1.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A 1 Architect.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form1 A1.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 - Engineer Certificate_compressed.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1 270823_compressed (1).pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A-1.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A A-1 .pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH FORM 1.pdf26 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 A1_compressed.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIGNED.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PHASE I__compressed.pdf30 Dec 2022
Proforma of Allotment letterFile: updated AFS.pdf8 Oct 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE NEW.pdf28 Sep 2022
Details of encumbrances concerned to LegalFile: NON LITIGATION DECLARATION.pdf11 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Sep 2022
Proforma of Allotment letterFile: allotment Letter_001_compressed.pdf2 Sep 2022
Building plan approvalFile: SAP Building Plan A2.pdf23 Aug 2022
Building plan approvalFile: SAP Building Plan 10_compressed.pdf23 Aug 2022
Details of encumbrances concerned to FinanceFile: Self Declaration -Non-Encru FINANCIAL.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: SAP Building Plan A2.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: SAP Building Plan 10_compressed.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 2.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 3.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 4.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 5.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 6.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan A3_compressed.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 8.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 9_compressed.pdf23 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: SAP Building Plan 11_compressed.pdf23 Aug 2022

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANCY HILLVIEW A-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANER13,700+ in Pune

Builder: M/S SARSAN AAWISHKAR PROPERTIES

M/S SARSAN AAWISHKAR PROPERTIES has 5 registrations on MahaRERA, including NANCY HILLVIEW A-1 and Nancy Hillview A-2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that NANCY HILLVIEW A-1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NANCY HILLVIEW A-1 is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANCY HILLVIEW A-1?

The registered promoter entity is M/S SARSAN AAWISHKAR PROPERTIES, a partnership as per the filing. Its GSTIN 27ACPFS9550E1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANCY HILLVIEW A-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NANCY HILLVIEW A-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NANCY HILLVIEW A-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANCY HILLVIEW A-1?

The professionals named in the filing: Architect: SHIRISH DASNURKAR; Engineer: sanket kakde; Chartered Accountant: kishnani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANCY HILLVIEW A-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANCY HILLVIEW A-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANCY HILLVIEW A-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.