Registered No litigation declared Residential / Group Housing project

NANA HEIGHTS

By SHREE SWAMI SAMARTH DEVELOPERS

RG-MH-69522 · RERA P99000049128 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 22 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 75%
62 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

NANA HEIGHTS is a Residential / Group Housing project by SHREE SWAMI SAMARTH DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000049128 on 1 Feb 2023. Possession is promised by 31 Mar 2028. The completion date has moved by 22 months from the original filing. 43 of the 105 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNANA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • CHANDANSAR ROAD
    • KOPARI
    • VIRAR EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000049128
  • ReraGenie IDRG-MH-69522

Builder

  • NameSHREE SWAMI SAMARTH DEVELOPERS
  • Entity typePartnership
  • PartnersRAMCHANDRA NANA MANGELA, GANESH NANA MANGELA, MAHESH NANA MANGELA, DHANESH GANESH MANGELA, VAISHALI MAHESH MANGELA
  • Other registrations13 more →
  • Completed4 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023First promiseMay 2026Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Feb 2023
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed76 files

Current status

41%43 of 105 units booked
79.1%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NANA HEIGHTSNA661041105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

NANA HEIGHTS: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered22
Open Space23

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026

Approvals and building plan

Sanctioning authorityVirar City Municipal Corporation
Permissible FSI3991.9
Proposed, not sanctioned3,392 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHANDANSAR ROAD,VIRAR EAST
Estimated costRs 8.56 cr
Cost incurredRs 6.77 cr
Work done79.09%
BuildingWingEstimatedIncurred
NANA HEIGHTSNARs 8.06 crRs 6.77 cr
-NARs 50.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKULDEEP PATIL
EngineerMOHAMMAD SHOEB BHATI
EngineerGR CONSULTANTS
EngineerManish MANILAL Kumar
Chartered AccountantKALPAK LAXMAN CHURI
Chartered AccountantSANKHALA AND CO.
Chartered AccountantK.L. Churi & co.
PartnerRole in project
SHREE SWAMI SAMARTH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29052621145May 2026 → Mar 2028

Reason as filed by the promoterShortage of Funds due to low demand: The real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of per

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf23 Jul 2026
Withdrawal Update Form 2File: form 2.pdf23 Jul 2026
Withdrawal Update Form 3File: form 3_compressed.pdf23 Jul 2026
Form 2A (FY 2022-2023)File: FORM 2A_ MARCH 23_NANA HEIGHTS.pdf1 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A_ MARCH 24_NANA HEIGHTS.pdf1 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_NANA HEIGHTS.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A_ MARCH 26_NANA HEIGHTS.pdf1 Jun 2026
Form 1File: Form 1.pdf27 May 2026
Form 2File: Form 2.pdf27 May 2026
Form 3File: form 3.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: March a sold-unsold.pdf27 May 2026
Form 1File: Form1.pdf12 Feb 2026
Form 2File: Form 2.pdf12 Feb 2026
Form 3File: Form3.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf12 Feb 2026
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 1File: form 1.pdf24 Dec 2025
Form 2File: form 2.pdf24 Dec 2025
Form 3File: form 3_compressed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: form 5 24-25.pdf24 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf29 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_compressed.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 NEW.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 32.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ms Shree Swami Samarth Developers.pdf10 Oct 2023
Proforma of Agreement for saleFile: SHREE-SWAMI-SAMARTH-DEV-2023-UPDATE (1).pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf16 Jan 2023
Layout approvalFile: LAYOUT.pdf10 Jan 2023
Building plan approvalFile: BLUE P.pdf10 Jan 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BLUE P.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHESH.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANESH.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAMCHANDRA.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declar.pdf30 Dec 2022
Details of encumbrances concerned to FinanceFile: fin en.pdf1 Dec 2022
Details of encumbrances concerned to LegalFile: fin en.pdf1 Dec 2022
PAN CardFile: PAN CARD CO.pdf26 Nov 2022
Copy of the legal title reportFile: title search report .pdf26 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Nov 2022
Declaration about Commencement CertificateFile: DEC OF CC.pdf26 Nov 2022
Declaration in FORM BFile: FORM B.pdf26 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate .pdf26 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate .pdf26 Nov 2022
CERSAI detailsFile: CERSAI.pdf26 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf26 Nov 2022
Proforma of Allotment letterFile: alotmnt.pdf26 Nov 2022
Deviation Report with respect to Allotment letterFile: DEV ALT LET.pdf26 Nov 2022

How this compares with Palghar

41%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 22 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOPARI, VIRAR EAST3,200+ in Palghar

2 kmNANA HEIGHTSCompleted 76Lapsed / revoked 48Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 207 registered projects within 2 km.

Builder: SHREE SWAMI SAMARTH DEVELOPERS

SHREE SWAMI SAMARTH DEVELOPERS has 14 registrations on MahaRERA, including SAMARTH HEIGHTS and SHRI SWAMI SAMARTH LEELA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NANA HEIGHTS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANA HEIGHTS?

The registered promoter entity is SHREE SWAMI SAMARTH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANA HEIGHTS?

The professionals named in the filing: Architect: KULDEEP PATIL; Engineer: MOHAMMAD SHOEB BHATI; Engineer: GR CONSULTANTS; Engineer: Manish MANILAL Kumar; Chartered Accountant: KALPAK LAXMAN CHURI; Chartered Accountant: SANKHALA AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.