Home / Browse projects / Pune, Maharashtra / NAMRATA PRIME LAND
NAMRATA PRIME LAND
RG-MH-23112 · RERA P52100032630 · Last updated on MahaRERA portal: 9 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAMRATA PRIME LAND is a Residential / Group Housing project by NAMRATA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100032630 on 17 Jan 2022. The registration is recorded completed; possession was promised by 29 Jun 2025.
At a glance
Project
- NameNAMRATA PRIME LAND
- TypeResidential / Group Housing
- Location
- Talegaon Station Road
- Dnyaneshwar Nagar
- Talegaon Dabhade (R)
- Mawal
- Pune
- 410506
- Pincode410506
- RERA no.P52100032630
- ReraGenie IDRG-MH-23112
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Jan 2022
- Promised completion29 Jun 2025
- Revised completionNone
- Buildings5 building records
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 11 | 0 | 0 | 0 | 0 |
| B BUILDING | NA | 11 | 0 | 0 | 0 | 0 |
| C BUILDING | NA | 11 | 0 | 0 | 0 | 0 |
| D BUILDING | NA | 10 | 0 | 0 | 0 | 0 |
| E BUILDING | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R D Rathod |
| Engineer | Harshal A Pachpande |
| Chartered Accountant | SSAP & Associates LLp |
| Partner | Role in project |
|---|---|
| NAMRATA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 May 2024
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Namrata Prime Land_Form 5_FY 2023-2024.pdf | 9 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Namrata Prime Land_TDMC Letter (1).pdf | 3 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: NPL Form-4 Signed.pdf | 3 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2406_001_removed.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: NPL_Form 2A_2021-22.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: NPL_Form 2A_2022-23.pdf | 6 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land Architect Certificate 311223.pdf | 2 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land_Architect Certificate_Dec 2023.pdf | 2 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Prime Land_Engg Certificate_Dec 2023.pdf | 2 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Prime Land_CA Certificate_Dec 2023.pdf | 2 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA NAMRATA PRIME LAND AS ON 311223 SIGNED.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Namrata Prime Land Form 5 FY 2022_23.pdf | 30 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NPL_OC 01.pdf | 20 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NPL_OC 02.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NPL Enginnering cert-Sept 2023.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPL CA certificate_Sept 2023.pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land Architect Certificate 300923.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land Architect Certificate 300623.pdf | 12 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Prime Land Engg Certificate_June 2023 (1).pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPL CA_June 2023.pdf | 12 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NPL Form 5_2021-22_compressed.pdf | 6 Mar 2023 |
| Details of encumbrancesFile: Encumbrances_NPL.pdf | 30 Nov 2022 |
| Other - FinanceFile: Encumbrances_NPL.pdf | 30 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land Arch Cert_Sept 2022.pdf | 26 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Namrata Prime Land CA_Sept 2022.pdf | 26 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Namrata Prime Land Bank Arch Cert-June 2022.pdf | 17 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Namrata Prime Land Engg Certificate June 2022 compressed.pdf | 17 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prime Land CA June 2022.pdf | 17 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NPL Engg Certificate_March 2022_compressed.pdf | 6 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NPL CA Cert_March 2022.pdf | 6 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NPL Architect Cert_March 2022.pdf | 21 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 11 Jan 2022 |
| Copy of the legal title reportFile: Legal Title Report_03012022.pdf | 3 Jan 2022 |
| Copy of the legal title reportFile: Title and search_03012022 Final.pdf | 3 Jan 2022 |
| Declaration in FORM BFile: Affidavit cum declaration.pdf | 3 Jan 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 3 Jan 2022 |
| Proforma of Allotment letterFile: Agreement to sell.pdf | 3 Jan 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 3 Jan 2022 |
| Layout approvalFile: Plan 1.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 1.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 2.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 3.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 4.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 5.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 6.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 7.pdf | 1 Jan 2022 |
| Building plan approvalFile: Plan 8.pdf | 1 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf | 1 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf | 1 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Happycity Talegaon 2 Commencement Certificate.pdf | 1 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HCT 2 Architect Certificate.pdf | 1 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HCT 2 Engg Certificate.pdf | 1 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HCT 2 CA Certificate.pdf | 1 Jan 2022 |
| PAN CardFile: Pan Card.pdf | 31 Dec 2021 |
| Details of encumbrancesFile: Happycity Talegaon 2 Detail Of Encumbrances.pdf | 31 Dec 2021 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| AIKONIC 3P52100028578 | Tapodham Colony, Pune | - | Mar 2021 | Certificate Signed | Sep 2023 | Sep 2023 |
| Namrata Business Centre | Near Nagar Parishad Talegaon-Dabhade | 1 | - | Completed | Dec 2020 | Dec 2020 |
| AIKONIC | CTS No 377 392 PART Tapodham Colony Talegaon Dabhade Pune 410507 | 192 | - | Completed | Sep 2019 | Mar 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep NAMRATA PRIME LAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dnyaneshwar Nagar13,700+ in Pune
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: NAMRATA DEVELOPERS
NAMRATA DEVELOPERS has 10 registrations on MahaRERA, including AIKONIC and NAMRATA BUSINESS CENTRE. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NAMRATA PRIME LAND is delayed beyond 29 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAMRATA PRIME LAND?
The registered promoter entity is NAMRATA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAMRATA PRIME LAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NAMRATA PRIME LAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAMRATA PRIME LAND?
The professionals named in the filing: Architect: R D Rathod; Engineer: Harshal A Pachpande; Chartered Accountant: SSAP & Associates LLp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAMRATA PRIME LAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.