NAMAVIRA APARTMENT

By AASTHA DEVELOPERS

RG-MH-86227 · RERA P51600052863 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 80%
20 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

NAMAVIRA APARTMENT is a Others project by AASTHA DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600052863 on 5 Oct 2023. Possession is promised by 31 Dec 2026. 8 of the 28 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameNAMAVIRA APARTMENT
  • TypeOthers
  • Location
    • S. NO. 802/14 VILLAGE NASHIK CITY 5
    • GOVIND NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600052863
  • ReraGenie IDRG-MH-86227

Builder

  • NameAASTHA DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABVFA8479P1Z3
  • PartnersDEVIDAS NAMDEV KAMBLE, CHANDRASHEKHAR NAMDEV KAMBLE
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

29%8 of 28 units booked
96.9%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAMAVIRA APARTMENTNA7722628

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.

NAMAVIRA APARTMENT: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered61
Open Space13

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2026
LandownerVillageDistrict
BHASKAR VISHNU KAMBLENashik (M Corp.)Nashik
CHANDRASHEKHAR NAMDEV KAMBLENashik (M Corp.)Nashik
CHHAGAN RAJARAM KAMBLENashik (M Corp.)Nashik
DEVIDAS NAMDEV KAMBLENashik (M Corp.)Nashik
DINKAR VISHNU KAMBLENashik (M Corp.)Nashik
RAJENDRA MAHADU KAMBLENashik (M Corp.)Nashik
RAVIKUMAR RAJARAM KAMBLENashik (M Corp.)Nashik
SANJAY NAMDEV KAMBLENashik (M Corp.)Nashik
SURESH MAHADU KAMBLENashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI2681.06
Proposed, not sanctioned2,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1075, 8TH CROSS, 100 FEET ROAD, INDIRA NAGAR, NASHIK
Estimated costRs 3.79 cr
Cost incurredRs 3.67 cr
Work done96.94%
BuildingWingEstimatedIncurred
NAMAVIRA APARTMENTNARs 3.79 crRs 3.67 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK JAMDAR
EngineerDEEPAK SANJAY KAMBLE
Chartered AccountantPRATIK VAIDYA & ASSOCIATES
Chartered AccountantShubham A Singh and Associates
PartnerRole in project
AASTHA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf13 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jun 2026
Withdrawal Update Form 3File: Form 3A.pdf13 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf31 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf31 Mar 2026
Withdrawal Update Form 3File: FORM 3.PDF31 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf29 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf29 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf29 Nov 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form 5.pdf29 Nov 2025
Withdrawal Update Form 1File: Form 1_Jun 25.pdf25 Sep 2025
Withdrawal Update Form 2File: Form 2_Jun 25.pdf25 Sep 2025
Withdrawal Update Form 3File: Form 3_Jun 25.pdf25 Sep 2025
Form 1File: Form 1.pdf2 Jul 2025
Form 2File: Form 2.pdf2 Jul 2025
Form 3File: Form 3.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory_Mar 25.pdf2 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold,Unsold Inventory.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Reduced.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Mar 24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Mar 24.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Booked, sold Inventory_Mar 24.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate_Mar 24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q1_Dec 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1_Dec 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Booking_Q1_Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_Dec 23.pdf19 Jan 2024
Layout approvalFile: Hissa Map.pdf4 Jul 2023
Copy of Layout Approval (in case of layout)File: Hissa Map.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_2mb.pdf4 Jul 2023
Building plan approvalFile: Bulinding Plan Approval.pdf15 Jun 2023
PAN CardFile: Aastha Developer PAN.pdf15 Jun 2023
Copy of the legal title reportFile: Revised_Legal Title Report.pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: no encumbrance concerned to legal .pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: no encumbrance concerned to finance _U.pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: self declaration regarding encumbrance concerned to legal.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: no encumbrance concerned to legal .pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: no encumbrance concerned to finance _U.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: self declaration regarding encumbrance concerned to legal.pdf15 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Bulinding Plan Approval.pdf15 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 1.pdf15 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2_Building Plan Transfer.pdf15 Jun 2023
Declaration about Commencement CertificateFile: declaration about commencement certificate .pdf15 Jun 2023
Declaration in FORM BFile: Form B_Promoter.pdf15 Jun 2023
CERSAI detailsFile: Cersai Affidavit.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Revised1_Disclosure of Interest.pdf15 Jun 2023
Proforma of Agreement for saleFile: model agreement of sale_U.pdf15 Jun 2023
Proforma of Allotment letterFile: model form of allotment letter_U.pdf15 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account for project_U.pdf15 Jun 2023
Deviation Report with respect to Allotment letterFile: deviation report WRT allotment letter_U.pdf15 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation report WRT AFS_U.pdf15 Jun 2023

How this compares with Nashik

29%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAMAVIRA APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOVIND NAGAR4,100+ in Nashik

2 kmNAMAVIRA APARTMENTCompleted 119Lapsed / revoked 26Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 230 registered projects within 2 km.

Builder: AASTHA DEVELOPERS

AASTHA DEVELOPERS has 5 registrations on MahaRERA, including PRITHVI MONARCH and AASTHA RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if NAMAVIRA APARTMENT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAMAVIRA APARTMENT?

The registered promoter entity is AASTHA DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABVFA8479P1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAMAVIRA APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAMAVIRA APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAMAVIRA APARTMENT?

The professionals named in the filing: Architect: ASHOK JAMDAR; Engineer: DEEPAK SANJAY KAMBLE; Chartered Accountant: PRATIK VAIDYA & ASSOCIATES; Chartered Accountant: Shubham A Singh and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAMAVIRA APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAMAVIRA APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAMAVIRA APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.