N G HILL CREST

By RNA Builders (NG)

RG-MH-04555 · RERA P51700022028 · Last updated on MahaRERA portal: 5 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 15 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 58%
15Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

N G HILL CREST is a Residential / Group Housing project by RNA Builders (NG) in Thane, Maharashtra, registered with MahaRERA as P51700022028 on 25 Aug 2019. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 15 complaints are on record with the regulator.

At a glance

Project

  • NameN G HILL CREST
  • TypeResidential / Group Housing
  • Location
    • BEVERLY PARK
    • NAVGHAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022028
  • ReraGenie IDRG-MH-04555

Builder

  • NameRNA Builders (NG)
  • Entity typePartnership
  • PartnersNarinderpal Gupta, TINA AGARWAL, PUJA AGRAWAL
  • Other registrations23 more →
  • Completed8 of 24
  • No longer live9 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

46 months past promisethis monthRegisteredAug 2019PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA130000
B WINGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 58%.

A WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure58%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure58%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered2
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
A WING156
B WING156

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,740 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3124.6
Proposed, not sanctioned3,125 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBOTAWALA CHAMBERS FORT MUMBAI 400 001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDINESHBHAI NAROTTAMDAS PATEL
EngineerSARIT GANGADHARAN
Chartered AccountantDHRUVPRAKASH & CO
PartnerRole in project
RNA Builders (NG)-

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000282169Suresh Esakki NaiduRNA BUILDERS (NG)01/08/2022
CC12500007Rajan Kamlesh ChaudharyRNA Builders (NG)01/01/2025
CC12500527Pramod Shankar BhosaleRNA Builders (NG)15/02/2025
CC12502258prashant tarangeRNA Builders (NG)05/07/2025
CC12502132Tejas Anil TrivediRNA Builders (NG)28/06/2025
CC12502129SUSHMITA AMIT BANDARKARRNA Builders (NG)28/06/2025
CC12502201Rajan Kamlesh ChaudharyRNA Builders (NG)02/07/2025
CC12502255Jayeshkumar DevadigaRNA Builders (NG)05/07/2025
CC12502136TUSHAR RAMCHANDRA PAWARRNA Builders (NG)28/06/2025
CC12502141Sagar KhanvilkarRNA Builders (NG)28/06/2025
CC12502252PRAVIN ASTHANARNA Builders (NG)05/07/2025
CC12502257MURLI MISHRARNA Builders (NG)05/07/2025
CC12502254Pramod Shankar BhosaleRNA Builders (NG)05/07/2025
CC12502424MANAN BHAVASARRNA Builders (NG)16/07/2025
CC12502423HITESH DILIP PARABRNA Builders (NG)16/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hill crest Form 5 20-21.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Hill crest Form 5 21-22.pdf5 Apr 2024
Proforma of Agreement for saleFile: Hill crest Form 5 21-22.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MARCH2021.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JUNE2021.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SEPTEMBER2021 (2).pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DECEMBER2021.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MARCH2022.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JUNE2022_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SEPTEMBER2022_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DECEMBER2022_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MARCH2023_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JUNE2023_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3SEPTEMBER2023_compressed.pdf1 Apr 2024
Declaration in FORM BFile: LATEST AFFIDAVIT CUM DECLARATION N G HILL CREST.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: HILL CREST.pdf14 Sep 2023
Disclosure of sold/ booked inventoryFile: N G HILL CREST-2.pdf26 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hill Crest FORM 5 1920.pdf3 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: N G HILL CREST Form 2 20.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hill Crest FORM 3 20_11zon.pdf1 Mar 2023
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf17 Aug 2019
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION.pdf17 Aug 2019
Layout approvalFile: 4 APPROVED LAYOUT PLAN.pdf9 Aug 2019
Building plan approvalFile: 11 NA ORDER.pdf9 Aug 2019
PAN CardFile: 1 PAN CARD.pdf9 Aug 2019
Copy of the legal title reportFile: 2 TITLE CERTIFICATE N G HILL CREST.pdf9 Aug 2019
Details of encumbrancesFile: 7 ENCUMBRANCE CERTIFICATE.pdf9 Aug 2019
Copy of Layout Approval (in case of layout)File: 4 APPROVED LAYOUT PLAN.pdf9 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: 11 NA ORDER.pdf9 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: 3 COMMENCEMENT CERTIFICATE.pdf9 Aug 2019
Declaration in FORM BFile: 5 FORM B AFFIDAVIT CUM DECLARATION.pdf9 Aug 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ARCHITECT CERTIFICATE.pdf9 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 ENGINEER CERTIFICATE N G HILL CREST.pdf9 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: 9 QA CERTIFICATE.pdf9 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 NG HILL CREST FOM 3 CA CERTIFICATE.pdf9 Aug 2019
Proforma of Allotment letterFile: 10 ALLOTTMENT LETTER AND AGREEMENT COPY.pdf9 Aug 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
N G Regency TDR Extension ProjectMunicipal Pipe Road Adjoining Nicholas Piramal Mills Balkum Thane189CompletedMar 2014Mar 2014
NG Paradise TDR Extension Project Bldg 9Plot No.88 1 2 Ghodbunder Village Taluka Bassein District28CompletedNov 2013Late, Dec 2013
N G SterlingSurvey number 336 hissa number 5 village goddev district thane74CompletedJul 2013Late, Aug 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep N G HILL CREST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVGHAR7,600+ in Thane

2 kmN G HILL CRESTCompleted 109Lapsed / revoked 75Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 284 registered projects within 2 km.

Builder: RNA Builders (NG)

RNA Builders (NG) has 24 registrations on MahaRERA, including N G Silver Spring and N G CANARY. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that N G HILL CREST shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if N G HILL CREST is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of N G HILL CREST?

The registered promoter entity is RNA Builders (NG), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in N G HILL CREST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against N G HILL CREST?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for N G HILL CREST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at N G HILL CREST?

The professionals named in the filing: Architect: DINESHBHAI NAROTTAMDAS PATEL; Engineer: SARIT GANGADHARAN; Chartered Accountant: DHRUVPRAKASH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in N G HILL CREST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About N G HILL CREST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save N G HILL CREST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.