Home / Browse projects / Satara, Maharashtra / My World
My World
RG-MH-23861 · RERA P52700010939 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 90 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
My World is a Residential / Group Housing project by M/S Dada Adinath Projects in Satara, Maharashtra, registered with MahaRERA as P52700010939 on 31 Aug 2017. Possession is promised by 24 Jun 2027. The completion date has moved by 90 months from the original filing. 1 of the 66 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMy World
- TypeResidential / Group Housing
- Location
- pargaon
- Pargoan
- Khandala
- Satara
- 412802
- Pincode412802
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700010939
- ReraGenie IDRG-MH-23861
Builder
- NameM/S Dada Adinath Projects
- Entity typePartnership
- PartnersAshok Ganeshmal Mutha, Kishor Ganeshmal Mutha, Piyush Khumchand Jain, Rinku Piyush Jain, Chandaben Khumchand Shah, Sweety Pankaj Jain, Vikram Kishore Mutha
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion24 Jun 2027
- Revised completionRevised to 24 Jun 2027 (originally 25 Dec 2019)
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D Building | NA | 7 | 7 | 66 | 0 | 66 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
D Building: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D Building | NA | Rs 6.06 cr | Rs 2.31 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nand Arch Creations |
| Engineer | Prashant Modi |
| Chartered Accountant | A N J K & CO LLP |
| Chartered Accountant | G N Mantri and Associates |
| Partner | Role in project |
|---|---|
| M/S Dada Adinath Projects | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52700010939 up to 24/06/2027. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.
Reason as filed by the promoterAs on date of this application, the site is at stand still. No construction activities can be carried out owing to the inadequacy of funds with the promoter. Further, the promoter has not received a single rupee from existing allottees of the project after registration and also new bookings are not received. Additionally, due to Covid-19 crisis the existing customers are either cancelling the booking or not able to pay the balance amount. Also the enquiries or bookings from new / prospective customers have been close to negligent numbers. Resultant, the promoter is not in position to complete
Reason as filed by the promoterThe expected completion date for the project as per earlier estimations and declaration mentioned in Form B was 25.12.2019. Due to the problems of the contractor, sub-contractor and labour the building could not be completed within the committed date i.e. 25.12.2019. Therefore we request you to grant extension for a period of 12 months i.e (upto 24.12.2020) because of above mentioned issues. The problems of the contractor, sub-contractor and labour were due to untimely demise of the Head (Main) Contractor of the project. The progress of the project was satisfactorily within the time limit befo
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000010952 | Amruta Mahendra Thakkar | Dada Aadinath Projects through its partners Hasmukh Mutha & Kishore Mutha | 26/01/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 24 Jun 2027
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCH CERTIFICATE - NAND CREATIONS MARCH- 2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: ENG CERTIFICATE PRASHANT MODY MARCH 2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate D Building MARCH 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE - NAND CREATIONS DEC - 2025.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: ENG CERTIFICATE PRASHANT MODY DEC 2025.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate D Building DEC 2025.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_ARCH CERTIFICATE - NAND CREATIONS SEPT - 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_ENG CERTIFICATE PRASHANT MODY SEPT 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 _CA Certificate D Building SEPT 2025.pdf | 14 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate - March 2025.pdf | 3 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - 24-25 - Sign.pdf | 25 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate June 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: CA Certificate D Building JUNE 2025.pdf | 21 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 2025.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: CA Certificate D building March 2025 - signed.pdf | 23 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2025.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY - MARCH 2025.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate December 2024.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate D building Decembe 2024_Signed.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate December 2024.pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2024.pdf | 28 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 5 Nov 2024 |
| Certificates of CA (Form 3)File: CA Certificate D building Sept 2024 - Sign.pdf | 5 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 5 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sept 24.pdf | 5 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 23-24 D Building.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 22 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 22 Jul 2024 |
| Certificates of CA (Form 3)File: CA Certificate D building June 2024_11zon.pdf | 22 Jul 2024 |
| Declaration in FORM BFile: Form B -Declaration by Promoter.pdf | 10 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance March 24.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCT CERTIFICATE NAND ARCH- MARCH 2024.pdf | 19 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE - PRASHANT MODI MARCH 2024.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY - MARCH 2024 .pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: CA CERTIFICATE - MARCH 2024_compressed.pdf | 19 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 31 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 29 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 29 Jan 2024 |
| Certificates of CA (Form 3)File: CA Certificate Signed_11zon.pdf | 29 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 26 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 26 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY RESIDENTIAL.pdf | 26 Oct 2023 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 26 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: D Building sign copy.pdf | 21 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 3 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 3 Aug 2023 |
| Certificates of CA (Form 3)File: CA Certificate Signed Final.pdf | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23 Signed_11zon.pdf | 20 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY Residential MARCH 2023.pdf | 28 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Signed.pdf | 28 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate PRASHANT MODY Signed.pdf | 27 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE -D BUILD SCAN.pdf | 15 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 21-22 D Building.pdf | 15 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Signed.pdf | 8 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Signed.pdf | 8 Nov 2022 |
| Certificates of CA (Form 5)File: CA Certificate.pdf | 8 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect signed_compressed.pdf | 2 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 2 Jun 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200235952628_For_Asset_Based_Search_26_04_2022_16_20_29_922.pdf | 2 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY -SCAN.pdf | 2 Jun 2022 |
| Certificates of CA (Form 3)File: CA Certificate Signed.pdf | 2 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Residential_compressed.pdf | 21 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate D Bldg_compressed.pdf | 21 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration.pdf | 21 Feb 2022 |
| Certificates of CA (Form 3)File: CA Cert signed.pdf | 21 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 DA Building.pdf | 18 Sep 2021 |
| Declaration about Commencement CertificateFile: MY WORLD D BUILDING CC Decl.pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MY WORLD D BUILDING Form A March 20.pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MY WORLD D BUILDING Form A March 21.pdf | 19 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: MY WORLD D BUILDING Inventory.pdf | 19 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certifi signed.pdf | 12 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert D Bldg upload.pdf | 12 Aug 2021 |
| Certificates of CA (Form 3)File: CA Cert DAP D bldg till date.pdf | 12 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera certificate for D buliding_compressed.pdf | 9 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form 5 D Bldg DAP FY 19-20.pdf | 9 Jun 2021 |
| Certificates of CA (Form 5)File: Rera certificate for D buliding_compressed.pdf | 1 Oct 2019 |
| Certificates of CA (Form 5)File: Rera Certificate D Bldg.pdf | 30 Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep My World on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pargoan1,100+ in Satara
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
GOLDFIELDS
UNIVERSAL DEVELOPERS
Snehbhoomi
Pushkar Realty
HILL CREST PARK
LIMRA DEVELOPERS
Terra Nova
BHIMASHANKAR DEVELOPERS
Woodwinds Phase I
Alliance Vanashree Ventures
Vaarsahighland1
BHIMASHANKAR DEVELOPERS
See every Satara project, with the district possession charts
Builder: M/S Dada Adinath Projects
M/S Dada Adinath Projects has 2 registrations on MahaRERA, including My World and My World. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if My World is delayed beyond 24 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of My World?
The registered promoter entity is M/S Dada Adinath Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in My World?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against My World?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for My World?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at My World?
The professionals named in the filing: Architect: Nand Arch Creations; Engineer: Prashant Modi; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: G N Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in My World?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback