ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / My World

Registered No litigation declared Residential / Group Housing project

My World

By M/S Dada Adinath Projects

RG-MH-23861 · RERA P52700010939 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 90 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 90 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
65 of 66Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

My World is a Residential / Group Housing project by M/S Dada Adinath Projects in Satara, Maharashtra, registered with MahaRERA as P52700010939 on 31 Aug 2017. Possession is promised by 24 Jun 2027. The completion date has moved by 90 months from the original filing. 1 of the 66 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMy World
  • TypeResidential / Group Housing
  • Location
    • pargaon
    • Pargoan
    • Khandala
    • Satara
    • 412802
  • Pincode412802
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700010939
  • ReraGenie IDRG-MH-23861

Builder

  • NameM/S Dada Adinath Projects
  • Entity typePartnership
  • PartnersAshok Ganeshmal Mutha, Kishor Ganeshmal Mutha, Piyush Khumchand Jain, Rinku Piyush Jain, Chandaben Khumchand Shah, Sweety Pankaj Jain, Vikram Kishore Mutha
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion24 Jun 2027
  • Revised completionRevised to 24 Jun 2027 (originally 25 Dec 2019)
  • Buildings1 building record
  • Documents filed95 files

Current status

2%1 of 66 units booked
38.2%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BuildingNA7766066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

D Building: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,547 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityTown Planning and Valuation Department Satara
Permissible FSI3056.4
Proposed, not sanctioned3,056 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune Satara Road
Estimated costRs 6.06 cr
Cost incurredRs 2.31 cr
Work done38.22%
BuildingWingEstimatedIncurred
D BuildingNARs 6.06 crRs 2.31 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNand Arch Creations
EngineerPrashant Modi
Chartered AccountantA N J K & CO LLP
Chartered AccountantG N Mantri and Associates
PartnerRole in project
M/S Dada Adinath Projects-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700022978Dec 2019 → Jun 2027

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52700010939 up to 24/06/2027. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

EXT52700009719Dec 2019 → Jun 2024

Reason as filed by the promoterAs on date of this application, the site is at stand still. No construction activities can be carried out owing to the inadequacy of funds with the promoter. Further, the promoter has not received a single rupee from existing allottees of the project after registration and also new bookings are not received. Additionally, due to Covid-19 crisis the existing customers are either cancelling the booking or not able to pay the balance amount. Also the enquiries or bookings from new / prospective customers have been close to negligent numbers. Resultant, the promoter is not in position to complete

EXT52700002462Dec 2019 → Dec 2020

Reason as filed by the promoterThe expected completion date for the project as per earlier estimations and declaration mentioned in Form B was 25.12.2019. Due to the problems of the contractor, sub-contractor and labour the building could not be completed within the committed date i.e. 25.12.2019. Therefore we request you to grant extension for a period of 12 months i.e (upto 24.12.2020) because of above mentioned issues. The problems of the contractor, sub-contractor and labour were due to untimely demise of the Head (Main) Contractor of the project. The progress of the project was satisfactorily within the time limit befo

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000010952Amruta Mahendra ThakkarDada Aadinath Projects through its partners Hasmukh Mutha & Kishore Mutha26/01/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Jun 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCH CERTIFICATE - NAND CREATIONS MARCH- 2026.pdf23 Apr 2026
Withdrawal Update Form 2File: ENG CERTIFICATE PRASHANT MODY MARCH 2026.pdf23 Apr 2026
Withdrawal Update Form 3File: CA Certificate D Building MARCH 26.pdf23 Apr 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE - NAND CREATIONS DEC - 2025.pdf8 Jan 2026
Withdrawal Update Form 2File: ENG CERTIFICATE PRASHANT MODY DEC 2025.pdf8 Jan 2026
Withdrawal Update Form 3File: CA Certificate D Building DEC 2025.pdf8 Jan 2026
Withdrawal Update Form 1File: Form 1_ARCH CERTIFICATE - NAND CREATIONS SEPT - 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form 2_ENG CERTIFICATE PRASHANT MODY SEPT 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form 3 _CA Certificate D Building SEPT 2025.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate - March 2025.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - 24-25 - Sign.pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate June 2025.pdf21 Jul 2025
Withdrawal Update Form 3File: CA Certificate D Building JUNE 2025.pdf21 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate March 2025.pdf23 Apr 2025
Certificates of CA (Form 3)File: CA Certificate D building March 2025 - signed.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate March 2025.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY - MARCH 2025.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate December 2024.pdf28 Jan 2025
Certificates of CA (Form 3)File: CA Certificate D building Decembe 2024_Signed.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate December 2024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2024.pdf28 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf5 Nov 2024
Certificates of CA (Form 3)File: CA Certificate D building Sept 2024 - Sign.pdf5 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sept 24.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 23-24 D Building.pdf17 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf22 Jul 2024
Certificates of CA (Form 3)File: CA Certificate D building June 2024_11zon.pdf22 Jul 2024
Declaration in FORM BFile: Form B -Declaration by Promoter.pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance March 24.pdf10 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCT CERTIFICATE NAND ARCH- MARCH 2024.pdf19 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE - PRASHANT MODI MARCH 2024.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY - MARCH 2024 .pdf19 Apr 2024
Certificates of CA (Form 3)File: CA CERTIFICATE - MARCH 2024_compressed.pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf31 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf29 Jan 2024
Certificates of CA (Form 3)File: CA Certificate Signed_11zon.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf26 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY RESIDENTIAL.pdf26 Oct 2023
Certificates of CA (Form 3)File: CA Certificate_compressed.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: D Building sign copy.pdf21 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf3 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf3 Aug 2023
Certificates of CA (Form 3)File: CA Certificate Signed Final.pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23 Signed_11zon.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY Residential MARCH 2023.pdf28 Apr 2023
Certificates of CA (Form 3)File: CA Certificate Signed.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate PRASHANT MODY Signed.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE -D BUILD SCAN.pdf15 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 21-22 D Building.pdf15 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Signed.pdf8 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Signed.pdf8 Nov 2022
Certificates of CA (Form 5)File: CA Certificate.pdf8 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect signed_compressed.pdf2 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf2 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200235952628_For_Asset_Based_Search_26_04_2022_16_20_29_922.pdf2 Jun 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY -SCAN.pdf2 Jun 2022
Certificates of CA (Form 3)File: CA Certificate Signed.pdf2 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Residential_compressed.pdf21 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate D Bldg_compressed.pdf21 Feb 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration.pdf21 Feb 2022
Certificates of CA (Form 3)File: CA Cert signed.pdf21 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 DA Building.pdf18 Sep 2021
Declaration about Commencement CertificateFile: MY WORLD D BUILDING CC Decl.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MY WORLD D BUILDING Form A March 20.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MY WORLD D BUILDING Form A March 21.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: MY WORLD D BUILDING Inventory.pdf19 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certifi signed.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert D Bldg upload.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Cert DAP D bldg till date.pdf12 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera certificate for D buliding_compressed.pdf9 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form 5 D Bldg DAP FY 19-20.pdf9 Jun 2021
Certificates of CA (Form 5)File: Rera certificate for D buliding_compressed.pdf1 Oct 2019
Certificates of CA (Form 5)File: Rera Certificate D Bldg.pdf30 Sep 2019

How this compares with Satara

2%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 90 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep My World on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pargoan1,100+ in Satara

2 kmMy WorldLapsed / revoked 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: M/S Dada Adinath Projects

M/S Dada Adinath Projects has 2 registrations on MahaRERA, including My World and My World. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if My World is delayed beyond 24 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of My World?

The registered promoter entity is M/S Dada Adinath Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in My World?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against My World?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for My World?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at My World?

The professionals named in the filing: Architect: Nand Arch Creations; Engineer: Prashant Modi; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: G N Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in My World?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About My World. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save My World to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.