Home / Browse projects / Satara, Maharashtra / My World

Registration lapsed No litigation declared Plotted project

My World

By M/S Dada Adinath Projects

RG-MH-23880 · RERA P52700011827 · Last updated on MahaRERA portal: 17 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
82 of 86Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

My World is a Plotted project by M/S Dada Adinath Projects in Satara, Maharashtra, registered with MahaRERA as P52700011827 on 31 Aug 2017. Possession was promised by 24 Dec 2024 and is now 22 months past that date. The completion date has moved by 60 months from the original filing. 4 of the 86 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMy World
  • TypePlotted
  • Location
    • Pargaon
    • Khandala
    • Satara
    • 412802
  • Pincode412802
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700011827
  • ReraGenie IDRG-MH-23880

Builder

  • NameM/S Dada Adinath Projects
  • Entity typePartnership
  • PartnersAshok Ganeshmal Mutha, Kishor Ganeshmal Mutha, Piyush Khumchand Jain, Rinku Piyush Jain, Chandaben Khumchand Shah, Sweety Pankaj Jain, Vikram Kishore Mutha
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion24 Dec 2024
  • Revised completionRevised to 24 Dec 2024 (originally 25 Dec 2019)
  • BuildingsNot stated in filing
  • Documents filed67 files

Current status

5%4 of 86 units booked

Figures as on 17 Oct 2024, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 17 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area34,363 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune Satara Road

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Modi
EngineerPrashant Modi
PartnerRole in project
M/S Dada Adinath Projects-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700002571Dec 2019 → Dec 2020

Reason as filed by the promoterThe expected completion date for the project as per earlier estimations and declaration mentioned in Form B was 25.12.2019. Due to the problems of the contractor, sub-contractor and labour the project could not be completed within the committed date i.e. 25.12.2019. Therefore we request you to grant extension for a period of 12 months i.e (upto 24.12.2020) because of above mentioned issues.

EXT52700009757Dec 2019 → Jun 2024

Reason as filed by the promoterAs on date of this application, the site is at stand still. No construction activities can be carried out owing to the inadequacy of funds with the promoter. Further, the promoter has not received a single rupee from existing allottees of the project after registration and also new bookings are not received. Additionally, due to Covid-19 crisis the existing customers are either cancelling the booking or not able to pay the balance amount. Also the enquiries or bookings from new / prospective customers have been close to negligent numbers. Resultant, the promoter is not in position to complete

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000157246Amruta Mahendra ThakkarDada AdinathProjects through its partners Hasmukh Mutha and Kishore Mutha05/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Jun 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 23-24 Plots.pdf17 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Completition Certificate.pdf9 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Application .pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCT CERTIFICATE NEHA MODY MARCH 2024.pdf19 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate DAP Plots Up to Mar 24_compressed.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - PLOTING - MARCH 2024 .pdf19 Apr 2024
Certificates of CA (Form 3)File: CA CERTIFICATE - MARCH 2024_compressed.pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf29 Jan 2024
Certificates of CA (Form 3)File: CA Certificate Plots Signed_11zon.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf26 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY PLOT.pdf26 Oct 2023
Certificates of CA (Form 3)File: CA Certificate_compressed.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Plots sign copy.pdf21 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf3 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf3 Aug 2023
Certificates of CA (Form 3)File: CA Certificate Signed Final.pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A QUALITY ASSURANCE CERTIFICATE PLOTTING_11zon.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate - DAP Plots - Up to Mar 23.pdf28 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY MARCH 2023.pdf28 Apr 2023
Certificates of CA (Form 3)File: CA Certificate Signed.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE -PLOT - SCAN.pdf15 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 DA Plots.pdf15 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 21-22 Plots.pdf15 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Plots Signed.pdf8 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Signed.pdf8 Nov 2022
Certificates of CA (Form 3)File: CA Certificate.pdf8 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate DAP _compressed.pdf15 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Plots.pdf2 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200235952628_For_Asset_Based_Search_26_04_2022_16_20_29_922.pdf2 Jun 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED - UNSOLD INVENTORY - Scan.pdf2 Jun 2022
Certificates of CA (Form 3)File: CA Certificate signed.pdf2 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Plotting_compressed.pdf21 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Plots_compressed.pdf21 Feb 2022
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Plots.pdf21 Feb 2022
Certificates of CA (Form 3)File: CA Cert Signed.pdf21 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 DA Plots.pdf18 Sep 2021
Declaration about Commencement CertificateFile: MY WORLD PLOTTING CC Decl.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MY WORLD Plotting Form 2A March 20.pdf19 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer Plots SIGNED.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Cer Plots SIGNED.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert Plots SIGNED.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Cert DAP Plots till date.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: MY World PLOTING DECLARATION.pdf9 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera certificate Plot _compressed.pdf9 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form 5 Plots DAP FY 19-20.pdf9 Jun 2021
Certificates of CA (Form 5)File: Rera certificate Plot _compressed.pdf1 Oct 2019
Certificates of CA (Form 5)File: Rera certificate Plot .pdf26 Sep 2018
Building plan approval or NA orderFile: Layout Plan.pdf30 Jul 2017
Layout approvalFile: Layout Plan.pdf30 Jul 2017
PAN CardFile: PAN.pdf30 Jul 2017
Copy of the legal title reportFile: search report.pdf30 Jul 2017
Details of encumbrancesFile: Details of Encumbrances.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf30 Jul 2017
Building Plan Approval (IOD)File: Layout Plan.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf30 Jul 2017
Declaration in FORM BFile: Form- B.pdf30 Jul 2017
Declaration in FORM BFile: Authority Letter.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer-Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.PDF30 Jul 2017
Proforma of Allotment letterFile: Draft agreement.pdf30 Jul 2017
Proforma of Allotment letterFile: allotment letter.pdf30 Jul 2017

How this compares with Satara

5%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 60 months
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep My World on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pargaon1,100+ in Satara

2 kmMy WorldLapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: M/S Dada Adinath Projects

M/S Dada Adinath Projects has 2 registrations on MahaRERA, including My World and My World. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that My World shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if My World is delayed beyond 24 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of My World?

The registered promoter entity is M/S Dada Adinath Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in My World?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against My World?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for My World?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at My World?

The professionals named in the filing: Architect: Prashant Modi; Engineer: Prashant Modi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in My World?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About My World. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save My World to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.